Professional Documents
Culture Documents
Sidang Sempro Aesthetic
Sidang Sempro Aesthetic
1 BACKGROUND
1 PROBLEMS
2
How to determine the How to analyze the
optimal process of the resulting defect and
3 resulting defect by
parameters using manuals 1 2
downtime data?
and tools?
4
Background Problems Objectives Advantages Limitation
1 OBJECTIVES
3
2 Can analyze defect data, downtime and costs generated
4
Background Problems Objectives Advantages Limitation
1 ADVANTAGES
4
Background Problems Objectives Advantages Limitation
1 LIMITATION
2
2
The data analyzed is primary data.
3
1
This study only discusses the analysis of the defect
missing location on the Wire Harness connector using
4 the manual method and compact point guide (CPG)
carried out at PT. Sumitomo Wiring System Batam
Indonesia.
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 WIRE HARNESS
1 Main Harness
2
2 Door Harness
The wire harness is a combination of several
5 Front Harness
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 CONNECTOR
2 Housing 1
Place or holder for
contact installation
A connector is one of the electronic components
3 that serve to connect one circuit to another
mechanically.
Contact 2
4 Iron material is used as
an electric or current
boiler installed in the
housing.
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
3
Compact Point Guide (CPG)
4 Compact Point Guide (CPG) is a tool that functions to check for errors in the installation of wire to
connectors in the wire harness assembly process.
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 PARETO CHART
2
A pareto chart is a graph or bar chart that draws a comparison
4
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 FISHBONE DIAGRAM
Man Materials
Operational labor or labor involved in the Material is one of the factors affecting
production process begins with the aspects of components, raw materials, and
2 delivery of products. 1 4 other materials used to make finished
products.
Machine Measurement
A machine is a system, part of an Measurement is part of the measurement,
equipment, facility, or part of a machine 2 5
3
which can be done manually or
used in manufacturing. automatically (distance, volume,
temperature, pressure, etc.).
Method Environment
4 The procedure and terms of service that go 3 6 Environments that include weather,
into production are called methods. natural disasters, and workplaces are
elements that cannot be foreseen or
controlled.
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 DATA PRIMER
TablePrimer Data
2
Primary data is fundamental or central
information used in a study. The process of
collecting primary data usually uses methods
3
such as interviews, surveys, experiments, and so
on, primary data is collected directly from
4 primary sources.
Wire Fishbone
Connector CPG Pareto Chart Data Primer Cycle Time
Harness Diagram
1 CYCLE TIME
Cycle Time Data
2
Cycle time or what is often referred to as
standard time is the time needed in a production
3 process from the initial process to the final
process.
4
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
1 IMPLEMENTATION STAGE
4
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
1 DATA COLLECTION
2
Data collection in the design of this final project was carried out
4
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
4 Pareto Chart
From the pareto diagram above, it can be seen that the lowest cumulative percentage of defects at
miss location or wire installation errors in the connector holes with a number of defects is 14 pcs.
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
4
Fishbone Diagram
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
Man
The operator does
Create check items
not follow the NO
3 procedure
using a checksheet
There is no
inspection tool Create a tool that
Method detects defects YES
Inspection still missing location
4 manually
Distracted
operation Make changes to
Environment the line design or NO
Limited/Narrow work area layout
work area
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
4
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
1 DATA COMPILATION
Data compilation is a process of compiling data obtained into certain parts and
2 sequences.
1 DATA PROCESSING
4
Implementation Data Data Using Data Using Data Data Data
stage Collection Manual Method CPG Compilation Processing Analysis
1 DATA ANALYSIS
4
Implementation Schedule
1 IMPLEMENTATION SCHEDULE
Implementation Schedule
4
THANK YOU