Andon
What is Andon ?
• A visual control that enables the operator to inform the Team Leader
(or responsible line cover) that an abnormal condition exists.
12:05
LINE
LINE11 PROD 146
DOWN 021
1 2 3 4 5 6
Vehicle Flow
PRE HELP PST
EQUIP
QUALITY
SYSTEM HEALTHY
Yamazumi Key:
Work Classification Working Position
R1 R2 R3 R4
Value Added Work
C1 C2 C3 C4
Non-Value Added Work L1 L2 L3 L4
Essential NVAW
S1
Option Work
Icons
Associated Associated Quality
Variant Work ENVAW NVAW Critical
15%
85%
5%
Time – 1sec=5mm
40%
60%
35%
R e t r a c t o r LH Retr a cto r RH Ca r p e t Fi t Lo o m
Processes
EQUIP
QUALITY
SYSTEM HEALTHY
1 2 3 4 5 6
DOWN 021
ATTEND 1 2 3 4 5 6
PRE HELP PST
CRD EQUIP
QUALITY P
SYSTEM HEALTHY
1 2 3 4 5 6
PRE HELP PST
EQUIP
QUALITY
SYSTEM HEALTHY
ATTEND 1 2 3 4 5 6
PRE HELP PST
CRD EQUIP
QUALITY P
SYSTEM HEALTHY
Author: Dave Bate
Vaillant Training, Belper
Andon
Marquee PLAN 153
12:05
LINE
LINE 11 PROD 146
DOWN 021
1 2 3 4 5 6
PRE HELP PST
EQUIP
QUALITY
SYSTEM HEALTHY
System healthy
The purpose of the chimes is to alert the personnel in that area that
there has been a change in status on either the line side equipment or
on the local Andon board.
Every team on the line is allocated a sounder. Each sounder has the
ability to sound individual chimes.
Every line is usually allocated two chimes:
1st chime is for the purpose of warning the local team.
2nd chime is for the purpose warning the whole line.
Line stop
Line stop
Line stop Managed buffers
Stn1-Stn20
Production continues
until preceding buffer
Stn 21 Stn 40
short
Set the buffer quantity based upon the line performance / downtime
Reduce buffers
as pulls &
downtime
reduce
No of
10 mins ~ 5 cars
pulls (depends on Takt)
1 2 3 5 10 20
Time in secs