What is HMS?

 Halliburton Management System

 HMS is an integrated set of


policies, business practices,
procedures, work methods and
documents used by Halliburton to
define, to plan, to execute, and to
control its business activities. It is
a combined effort.

FOR INTERNAL USE ONLY 2


FOR INTERNAL USE ONLY 3
HMS’ key principles:

 What we do
 How we do it
 Who is responsible
 How we know we've done it
 How we make it better

FOR INTERNAL USE ONLY 4


Halliburton Management System

Code of Business Conduct

Policies are formal statements developed by top management. Policies


Policy define the intent and conduct of company business

Business practices support company policies. They present


undelying performance expectations
Business Practices

Standards further defines those elements within the system


that would affect the final outputs
Standards

Process Maps describe activities, responsibilities, and


interfaces. Needed to achieve a given service or product,
Process Maps
multi discipline

WMs describe the detail of a specific work


activity, task or business event. Single discipline.
Work Methods

FOR INTERNAL USE ONLY 5


The 7 Mainstays of HMS are:

These processes cover all events and activities within a service project, from
tendering for the work to completing reports and the reviewing of performance
once the project has been successfully executed:

1. Develop Solutions
2. Prepare Resources
3. Mobilization of Resources
4. Perform Services
5. Complete Reports and Invoicing
6. De-mobilization of Resources
7. Review Performance

“Confidential –Internal Halliburton Use Only. © v.1 2006 Halliburton. All Rights Reserved.”

FOR INTERNAL USE ONLY 6


FOR INTERNAL USE ONLY 7
Developing Solutions (100)

 To ensure all customer needs and expectations are


effectively translated to a job plan.
 First contact made with customer to determine needs.
 Credit Check made.
 Customer’s needs are reviewed to see if job is a “GO”.
 Contract is created (new customer) and/or reviewed.
 Scheduling of resources and equipment is begun.
 Experienced personnel brought in to contribute to job
design.
 Proposal created & started by BD.
 Proposal reviewed by Service Op./Coordinator/Engineer.
 Sales Order is created and started by management.

FOR INTERNAL USE ONLY 8


Prepare Resources (200)…continued

 Final schedule/job proposal laid out & reviewed with


customer and all relevant parties.
 Call sheet created/updated.
 Load out sheet created/reviewed.
 Personnel has completed the required safety and technical
training

FOR INTERNAL USE ONLY 9


Mobilize Resources (300)

 To confirm that the equipment & materials required for the job are prepared,
packaged, secured, & ready for transport to the Customer’s location; and all
preparation & documentation for required personnel is complete and
accurate.
 Equipment function & pressure tested (Green Tagged).
 Tools and equipment packaged correctly for transportation.
 Final schedule, paperwork, and equipment verified.
 Ask yourself the “What If…” question.
 Destination check & Journey Management
 Leave base to location.

FOR INTERNAL USE ONLY 10


Perform Services (400)

 To review & perform (pre-job) safety requirements, verify equipment status & carryout pre-job
preparation, review well program with Customer, perform job (including rig down & management of
change).
 Arrive on location & Sign In (CAUTION!!!)
 Job design reviewed & agreed with customer & executed as designed & WO signed.
 LOZs: Well Site Audit, HOC, BBP, RAs, MOCs, Safety Meetings
 Equipment spotted
 Rig Up
 Service Execution
 Job Field Packet updated
 Monitor key variables: Pressures, Volumes, Weights, Depths
 Rig Down & Inspect
 Waste Management

FOR INTERNAL USE ONLY 11


Demobilize Resources (500)

 To help ensure that all the required resources (personnel, equipment, and materials) are
demobilized and returned safely to the operations center.
 Customer Meeting/Follow-up
 Job Logs, Tickets, EJCS, KPI, DVAs: Reviewed/With, Explained/With, and signed by the
Customer.
 Equipment secured & load out procedures followed.
 MSDS documents accompanying all required chemicals
 Journey Management
 Return to base.
 Equipment/Tools unloaded, returned, & inspected.
 Equipment Red Tagged for any maintenance or redress.

FOR INTERNAL USE ONLY 12


Complete Field Tickets & Reports (600)

 To ensure that all documents and reports are fully completed, distributed on time and
those records are filed and controlled.
 Reports include & not limited to customer required job reports:
 Sales Field Ticket(s)
 Job log(s)
 JSA/RAs
 Tool Usage
 EJCS/KPI
 CPI
 Time Sheets
 Materials Return (Inventory Control).
 Reports are reviewed, validated, logged, recorded, approved, and invoiced in a timely
manner by Service Coordinator/Planner.

FOR INTERNAL USE ONLY 13


Review Performance (700)

 To review performance, obtain the customer’s feedback of job results, and identify
improvement and CPI opportunities based on the delivery of the job ran.
 Review and discuss job performance with Supervisor* on:
 Customer
 Crew (3rd Parties, Rig, etc.)
 Equipment
 Processes, Procedures, or Product non-conformances
 Personnel (Internal/External)
 HSE/SQ
 Support Functions
 Discuss problems & issues.
 Implement proper steps to prevent issues from reoccurring.

FOR INTERNAL USE ONLY 14


Process Maps

 Designed to depict the general flow of


activities, illustrate handoffs, and identify the
responsible party for each step.
 HSE and business risk symbols are identified
and hyperlinked to actual job safety analysis
documents or job performance analysis
documents.
 On right side of the document, hyperlinks are
associated with each Standards, Work
Methods, and Risk Analysis for more detail.

FOR INTERNAL USE ONLY 15


Process Maps for Developing Solutions

FOR INTERNAL USE ONLY 16


ISO Standards - What They Do…

 Make the development, manufacturing and supply of products and services


more efficient, safer and cleaner
 Facilitate trade between countries and make it fairer
 Provides the company with a technical base for health, safety and
environmental legislation, and conformity assessment
 Share technological advances and good management practice
 Disseminate innovation
 Safeguard consumers, and users in general, of products and services
 Make life simpler by providing solutions to common problems

FOR INTERNAL USE ONLY 17


HMS vs. Industry Standards

 Started with ISO 9001 as the framework and closed the GAP with other
industry standards.
 Example - MOC is in API Q2/API RP 75 but not a requirement of ISO 9001

API Q2
API Q1 / TS 29001API RP 75
ISO 14001 SEMS

ISO 9001 OHSA 18001

HMS

FOR INTERNAL USE ONLY 18


HMS vs. Industry Standards

Industry Standards
ISO 9001, TS29001, ISO 14001, OHSAS 18001, API Q1, API Q2, RP-75

Halliburton Management System


Manual
Standards supplement the
detail in the HMS Manual

HMS Standards

In our HMS, the HMS Manual and HMS Standards combined define
Halliburton requirements to comply with the Industry Standards

FOR INTERNAL USE ONLY 19


HMS Process Document Numbering Structure
a.k.a “Reference Code”

Each HMS process document has a unique identifier


number code which tells:
• Sphere of application (global, country, etc.);
• Business Unit;
LP Linkage of Process
• PSL, Process or Discipline; ST Standard
PM Process Map
• Unique three digit number WM Work Method
• Document type; FO Form

FOR INTERNAL USE ONLY 20


Example: WM-GL-HAL-TSS-910

Work Method Global


Halliburton Testing
Halliburton and Subsea

Global Maintenance
Work Method

FOR INTERNAL USE ONLY 21


HMS Documents

 Policies, Work Methods, Forms, Process Maps, etc.


ARE NOT WRITTEN IN STONE!
 THEY CAN BE CHANGED!
 CPIs

FOR INTERNAL USE ONLY 22

You might also like