1.0 History 3
2.0 Introduction 4
3.0 Case- 1 Problem Description 5
4.0 Case- 1 Problem Solution 6
5.0 Case- 2 Problem Description 7
6.0 Case- 2 Problem Solution 8
7.0 Case- 3 Problem Description & Solution 9
8.0 Case- 4 Problem Description & Solution 10
9.0 Case- 5 Problem Description & Solution 11
10.0 Case- 6 Problem Description & Solution 12
11.0 Cost Of Construction / Cost of Construction / Cost per person -1 13
12.0 Cost Of Construction / Cost of Construction / Cost per person -2 14
2
1.0 History-
• This study aim towards the safety enhancement done in design of ready made
safety equipment (Case 1) i.e. Roof Life Line System
• Improvement action taken towards health hazards during gate entry (Case 7,
Case 8 & Case 9) i.e. For containment of spreading harmful microbial from one
person to another.
3
2.0 Introduction :-
• The safety enhancement of “Roof Life Line System” of SSD building terrace roof
• Construction and installation of safety equipment to Facility building roof cleaning activity.
• Non moving production inventory packing Square tubes packing frames scraping issue.
• At company main gate people come in close contact which results in spreading of harmful
microbial causing health hazards.
• The security person come in contact with the outsider while taking their body temperature, this
may lead spreading of contagious disease causing health hazard.
• Enclosed office of IP bay 1, members feel suffocated & unwell due to stale air.
4
Improvements in Safety :
1.0 Case-1Problem Statement
• “Roof Life Line System” of SSD building terrace roof need additional
safety while crossing over to reach another side, due the substantial
height of the roof
Time period consumed for implementation-90-100 days
Hazard Type- Physical Hazard.
Consequence:-
1. Body stress.
2. Lack of confidence, Fear, dizziness, Acrophobia
Risk level Score of previous procedure:- Probability x
Consequences.
Risk level Score:- 2x4= 8
Tool / Technic Used To Solve The Problem:- Brainstorming
Steps:- 1) Gather all the team members of department in circle. Brainstorming
2) Titled the problem on the display board and asked each one member to write their ideas on
board below the title.
3) Repeat the turn of members until all have given-up & maximum idea are recorded on board,
now sort the idea with similarities & discuss the pros and cons of top similar ideas.
4) Thus finally the solution is obtained with most pros and least cons idea. 5
Improvements in Safety :
Top ideas obtained in brainstorm were as follows:-
1) Restriction to specific manpower
2) Use cherry picker instead of life line system to reach other side
3) Use big ladder from ground floor to terrace
4) Providing safety rope rail to roof safety life line system
3.0 Case-1 Solution Of Problem:-
Constructed Enhanced safety Rope Rail above SSD
terrace for roof crossover to reach another side of roof
Cost Sheet Of Safety Rope Rail
Sr. No. Material Description Rate QTY Total
1 Wire Rope 25 / m 100 m 2500
2 Turn buckle Hook & Eye, Thimble (Kit) 1000 /Kit 16 Kit 16000
3 Vertical Support - Square Tubes 35 / feet 16 feet 630
4 Welding Consumables 350 / pack 1 pack 350
2 Person Deployed for 4 Days 8000
Safety Rope Rail Cost Of Construction RS 27480 /- Approx.
Advantages:-
1) Improved safety
2) Improved confidence
3) Hazard minimized
Risk level Score after improvement:- 2 x 2 = 4 i.e. 50 % reduced Enhanced Safety Rope Rail to Roof Life Line
6
Improvements in
Safety :
2.0 Case-2 Problem Statement
• No provision for house keeping person to clean the
facility building roof from bottom side.
Time period consumed for implementation-90-100
days
Consequence:-
30 feet
1. Body stress.
height
2. Poor work quality.
Tool / Technic Used To Solve
The Problem:- Brainstorming
Benefits / Advantages:-
• Increase accuracy in temperature Screening.
• Man Hours Saved i.e. 30 Min / shift = 1.5 hrs / day x No. of
days from installation i.e. 180 days, Therefore total Man-hours
is 270 Hrs
• Prevented the Spreading Of hazards Microbial
Before After 11
Improvements in Health Hazards :
50+ RS RS
Users 27480 550
1) Enhanced Safety Rope Rail to Roof Life Line
Cost of Construction Cost to per person
No. Of Users
50+ RS RS
Users 23520 470
2) Safety Elevator For Building Roof Cleaning
No. Of Users Cost of Construction Cost to per person
100+ RS RS
5) Use of wall fans to reduce AC consumption during winter. Users 6340 64
6) Use of VFD and Cut off through PID controller to save power. 500+ RS RS
User 12000 24