Derrick Destruct Presentation Talisman
Derrick Destruct Presentation Talisman
n
energy
Auk
Aukdrilling
drillingupgrade
upgradeput
puton
onhold
holdearly
earlyJune
June08
08pending
pendingmanagement
management
review
reviewdue
duetotoescalated
escalatedproject
projectcosts.
costs.
Project
Projectteam
teamidentified
identifiedregardless
regardlessof
ofwhat
whatoption
optionselected
selectedexisting
existing
derrick
derrickrequired
requiredto
tobe
bedestructed.
destructed.
Project
Projectteam
teamidentified
identifiedoptimum
optimumtime
timewas
wasto
todestruct
destructthe
thederrick
derrickinin2008
2008
to
tomeet
meetrequired
requiredschedule
scheduleandandachieve
achieveproject
projectmile
milestones.
stones.
Derrick
Derrickdestruct
destructextremely
extremelyweather
weathersensitive
sensitivedue
duetotorig
rigbuilders
buildersstrict
strict
operating
operatingparameters
parametersfor
forsafe
safeimplementation
implementationofofscope.
scope.
Project
Projecttargeted
targetedSeptember
September2008
2008for
forimplementation,
implementation,back
backend
endof
of08
08
summer
summerweather
weatherwindow.
window.
Project Scope
Slide 3
Destruct
Destructsplit
splitinto
into22phases
phaseswith
withan
anoverall
overallestimated
estimatedduration
durationof
of34
34days
days
requiring
requiring88specialist
specialistrig
rigbuilders
builderssupplied
suppliedbybyDerrick
DerrickServices
ServicesLtd.
Ltd.
Phase
Phase11
Removal
Removalof ofall
allremaining
remainingequipment
equipmentandandsecondary
secondaryitemsitemsinternal
internaland
and
external
externalto
tothe
thederrick.
derrick.((Crown
Crownblock,
block,torque
torquetube
tubeand
andtop
topdrive
driveequipment
equipment
having
havingpreviously
previouslybeen
beenremoved
removedutilising
utilisingdrill
drillfloor
floorwinches)
winches)
Phase
Phase22
Removal
Removalof
ofderrick
derrickstructure
structurepiece
piecesmall
smalldown
downto
todrill
drillfloor
floorlevel
level
Phase 1 Scope
Slide 4
Destruct
Destructand
andremoval
removalof
ofthe
thefollowing
followingitems
itemsutilising
utilisingexisting
existingdrill
drillfloor
floor
winches,
winches,and
andmethodologies
methodologiesandandpractises
practisesnormally
normallyused
usedforformaintenance
maintenance
of
ofthese
theseitems.
items.
Casing
Casingstabbing
stabbingboard.
board.
Tong
Tongcounter
counterbalance
balanceweight.
weight.
Walkways
Walkwaysand andplatforms.
platforms.
Vent
Ventline.
line.
Derrick
Derrickladders.
ladders.
Cement
Cementpipe pipework.
work.
Vent
VentDucting.
Ducting.
Finger
Fingerboard.
board.
Minor
Minoritems;
items;Lights
Lights,,Nav
NavAids,
Aids,Air
Airsupply
supplyto
tomoney
moneyboard.
board.
CSB & counter balance pipes Slide 5
Piece
PieceSmall
Smalldestruct
destructofofderrick
derrickstructure
structureto
todrill
drillfloor
floorlevel.
level.Note
Notethat
thatmembers
membersareare
either
eithershackled
shackledthrough
throughexisting
existingbolt
boltholes
holesororslung
slungutilising
utilisingsoft
softwebbing
webbingsling
slingto
to
ensure a secure grip when being lowered from
ensure a secure grip when being lowered from height.height.
Piece
Piecesmall
smalldestruct
destructimplement
implementutilising
utilisingaafloating
floatingpole
poleand
andexisting
existingdrill
drillfloor
floor
winches.
winches.
Additional
Additional44off
offhand
handoperated
operatedluffing
luffingwinches
winchesinstalled
installedon
onthe
thedrill
drillfloor.
floor.
AUK DERRICK REMOVAL Stage2
Slide 10
4te Winch
2 Te Winch
Drill floor lay out
Slide 14
2.5 Te
air
4Te air Scaffold V door winch
winch protection
above 4te
winch
Hand operated Scaffold
Luffing winches protection in
2Te front of tool
store door
Tool
store.
Safe
area
Current status
Slide 15
Phase
Phase11and
and22work
workpack
packissued
issuedatatRev
RevC1.
C1.
All
Alllifting
liftingplans
plans(12
(12of)
of)reviewed
reviewedand
andapproved
approvedby
byAtkins
Atkinsand
andNSL.
NSL.
HAZID
HAZID((RAM
RAMsession)
session)implemented
implemented12/09/08,
12/09/08,All
AllOnshore
Onshoreactions
actionsclosed
closedout.
out.
Risk
Riskassessment
assessmentre
recompliance
complianceto
toHSE-PRO-TLM-014
HSE-PRO-TLM-014carried
carriedout
out24/09/08.
24/09/08.
DSL
DSLinterface
interfacedocument
documentininplace.
place.(requiring
(requiringfinal
finalsignature)
signature)
DSL
DSLHSE
HSE plan
planininplace
place. .
Current Status Con’t
Slide 16
DSL
DSLcompetency
competencymatrix
matrixissued
issuedand
andgap
gapanalysis
analysiscarried
carriedout
outby
byNSL,
NSL,further
further
discussion
discussionrequired
requiredto
toensure
ensurecompatibility
compatibilitywith
withHSE-PRO-TLM-014.
HSE-PRO-TLM-014.
Competency
Competencyassessments
assessmentsfor
forDSL
DSLcrew
crewreceived.
received.
DSL
DSLsupervision
supervisionmobilised
mobilisedearly
earlyand
andliased
liasedwith
withplatform
platformmanagement.
management.
DSL
DSLcrew
crewidentified.
identified.
All
Allequipment
equipmentmobilised
mobilisedand
andoffshore.
offshore.
Selection of DSL
Slide 17
Specialist
Specialistskills
skillsand
andexperience
experiencerequired
requiredfor
forthis
thistype
typeof
ofoperation.
operation.Most
Most
recently
recentlydestructed
destructedderrick
derrickon
onForties
Fortiesecho
echoand
andThistle,
Thistle,&&Alwyn
Alwynplatform,
platform,
Construct
Constructactivities
activitieson
onthe
theForties
FortiesBravo.
Bravo.
Currently
Currentlyonly
only22companies
companiesininthe
theUK
UKspecialising
specialisingininthis
thistype
typeof
ofwork.
work.
DSL
DSLhad
hadpreviously
previouslycarried
carriedout
outaafull
fulldetailed
detailedsurvey
surveyof ofthe
theAuk
Aukderrick
derrickand
and
had
hadspecific
specificengineering
engineeringknowledge
knowledgeof ofthe
theinstallation.
installation.
DSL
DSLhave
haveaatrack
trackrecord
recordfor
forimplementing
implementingthis
thistype
typeof
ofwork.
work.
DSL
DSLsafety
safetystats
statsfor
for2007
2007show
showan
anLTI
LTIfrequency
frequencyrate
rateof
of0.29
0.29verses
versesanan
industry
industrynorm
normofof2.97.
2.97.LTI
LTIfrequency
frequencyrate
ratefor
for2008
2008currently
currentlyat
at00to
todate.
date.
Current open issues / mitigations
Slide 18
Personnel
Personneloperating
operatingdrill
drillfloor
floorwinch
winchwithin
withindrop
dropzone
zoneof
ofloads
loadsbeing
beinglowered
lowered
this
thisbeing
beingdeemed
deemedtotobe
beoutoutwith
withHSE-PRO-TLM-014.
HSE-PRO-TLM-014.
Safe
Safearea
areaidentified
identifiedon
onthe
thedrill
drillfloor
floorandanddropped
droppedobject
objectprotection
protectionframe
frametotobe
be
provided above 4te winch.
provided above 4te winch.
Control
Controlofofpersonnel
personnelidentified
identifiedininlifting
liftingplans
plansand
andDSL
DSLprocedures,
procedures,location
locationofof
personnel
personnelduring
duringtask,
task,and
anduseuseofofsafe area..
safearea
Position
Positionof
ofpersonnel
personnelon
ondrill
drillfloor
floorwhen
whentasks
tasksbeing
beingimplemented
implementedat
atheight.
height.
Control
Controlofofpersonnel
personnelidentified
identifiedininlifting
liftingplans
plansand
andDSL
DSLprocedures,
procedures,location
locationofof
personnel
personnelduring
duringtask
tasknoted
noted, ,and
anduse useofofsafe
safearea
area(Tool
(Toolstore)
store)
DSL
DSLcompetency
competencyGapGapanalysis
analysisrequired
requiredto
tobe
beclosed
closedout
outto
toensure
ensureDSL
DSL
competency.
competency.Competency
Competencythat
thatDSL
DSLcan
candemonstrate
demonstratemay
maybe beout
outwith
with
requirements'
requirements'within
withinHSE-PRO-TLM-014
HSE-PRO-TLM-014
Currently
Currentlyongoing,
ongoing,DSL DSLtraining
trainingmatrix
matrixsupplied
suppliedand
andcourse
coursecontents
contentsprovided
providedby
by
training
trainingfacility,
facility,further
furtherdiscussion
discussionrequired
requiredwith
withAndrew
AndrewTaylor.
Taylor.