You are on page 1of 6

AIR COMPRESSOR

Areas / Processes Requiring


No. JR One’s Workshop Remark
Compressed Air
1 Workshop A Compound lines Workshop A shares compressed air from
2 Workshop A R&D line workshop B.

3 Building B Injection machines 3 compressors are located in Workshop B (2


4 Building B Repairing mold room compressors are operational & 1 for standby)

5 Building C Buffing room 3 compressors located in Workshop C


6 Building C Assembly lines, stitching lines… (2 compressors are operational & 1 for standby)

7 Building D VA Packaging lines Share compressed air from Workshop C

8 Chemical warehouse Chemical Mixing machines


These areas share compressed air from workshop B.
9 IP Recycling area Recycling area

 All air-compressors located in different Workshop B & C MUST BE LINKED with each other to make sure there is always back-up
compressed air at any time.
 Between workshop, valves should be provided for compressed air management.
 Inside each workshop, should provide more standby valves on the compressed air pipes for future usage/connection.

Specification
COOLING TOWER FOR COMPOUNDING LINE

H: 1890 mm; φ1820 mm


Specification

**Note: Only Building A will


install the cooling tower
COOLING TOWER FOR COMPOUNDING LINE

 Cooling tower, connecting pipe for Water IN and OUT


COOLING TOWER FOR COMPOUNDING LINE

 Cooling tower, connecting pipe for Water IN and OUT

OUT
IN
External pipe connection
IN / OUT

Video
COOLING TOWER FOR COMPOUNDING LINE

 Cooling tower, connecting pipe for INTERNAL

Water
Water IN
OUT
AIR

Video Video
COOLING TOWER FOR COMPOUNDING LINE

 Cooling tower, connecting pipe for INTERNAL


Electrical

AIR

WATER

Video

You might also like