LAPORAN PERJALANAN IndoCBM 2014
LAPORAN PERJALANAN IndoCBM 2014
• In 2010-2013 (3 years), 18
PSC GMB Sanga-Sanga wells has been drilled since
PSC awarded in Nov 2009
Gear Box
LRP Motor
drive
Rod String
Water outlet
Wellhead
Gas line
LRP at well MUT 205 (0.2-0.3 Gas line (yellow) and water pipe
VSD (blue) to separator
mmscfd)
Gas separator facilities Water tank to collect water produced from well
PLN Facilities for CBM – Mutiara Field
Gas meter facilities – the last process before used into PLN generator
- Make sure the quality of gas methane sent from well site through pipe line
- Metering gas flow that use to power the genset (avr : 0.2 – 0.3 mmscfd) Gas chromatograph was installed in gas meter facilities