MN-OSN-2000/2

Activity Update

August 2014
1
Block Brief
• Block awarded under NELP-II (2001)
• PI: ONGC 40%, IOC, GAIL & OIL (20% each)
• Area: Initial – 8330skm, Present - 4061 skm
• Block re-categorized as deep-water block
• 1st Mio.-Pliocene Gas Discovery:
 Well MDW-2A (23.12.2006). Appraisal
plan consisted of 1 firm (MDW-6)
 DOC submitted on 21.12.2009 &
Reviewed on 15.06.2010.
• 2nd Paleogene Gas Discovery:
 Well MDW-10 (11.12.2010). Paleogene
Appraisal Plan consisted of 3 firm
locations (MDW-18, 19 & MDW-24)
 DOC Submitted: 24.12.2013. Review by
DGH awaited
• MoEF requested for 181 days Extn. under
Excusable delay.
2
Work Committed vs. Actual
Phase-I [16.8.2001 – 15.8.2003]
Activity MWP Achieved
API of 2D seismic data 1000 km 1000 km
Reprocessing / Special processing Nil 491 km / 115 km
Phase-II [16.8.2003 – 15.2.2007]
Activity MWP Achieved
API of 3D seismic data Nil 625 sq km
Special processing / AVO Nil / Nil 625 sq km PSTM / 170 sq km
Drilling of exploratory well 2 wells [2000m & 2200m] 2 wells [3039m & 2200m]
Phase-III [16.8.2007 – 18.12.2010]
Activity MWP Achieved
API of 3D seismic data Nil 853 sq km
Special processing of existing data 1000 km Nil
Drilling of exploratory well 2 wells [2000m & 2200m] 2 wells drilled [2585m & 3230m]
Appraisal Period [19.12.2010 – 26.12.2013]
Activity MWP Achieved
Drilling of exploratory well 3 wells [3200m, 3850m & 4850m] 2 wells drilled [3300m & 3882m]
3rd well under drilling

3
Seismic Coverage

4
Drilling Status

5
Reconstructed Seismic

6
Established Mio-Pliocene Gas Sands

7
Combined Mio-Pliocene Pay Map & Reserve for DOC

MN-OSN-2000/2 MN-DWN-98/3
GIIP:26.78 BCM CM GIIP:3.5 BCM
8B N
Ultimate:16.2/18.2
4. 5 Ultimate: 1.78/2.14BCM

LE
BCM

AD
LEAD-B

-C
6.4BCM
CM
B
-A 3.5
D
A M
E
L BC
. 98
6 MDW-6
M
BC

Total Reserve:
MDW-2A
84

GIIP:30.28 BCM
8.

Ultimate:17.98/20.34
BCM
Pay:1640-1700, 1700-1710 1800m 1350-1380//////
8
Development Concept

 No. of development wells : 12 for MN-OSN-2000/2


 Water depth : up to 1400 M for MN-OSN-2000/2
 Peak gas production potential per year: 5.5 MMSCMD.
 Landfall point of Paradip considered
 The wells are spatially about 60 km apart and are planned to be
connected in daisy chain.
 Gas arrival pressure at Onshore Terminal : 30 Kg/cm2

9
Development Plan: Case-I (12 + 1 well)

10
Option: Subsea Tie Back to Shore

11
Commerciality

Integrated development
Project IRR @ 14%
commercially viable at
minimum gas price of
US$10.72 per MMBTU

12
Development Plan: Case-II (7 + 1 well)

13
Option: Subsea tie back to FPS (Hired)

14
Commerciality

Integrated development
Project IRR @ 14%
commercially viable at
minimum gas price of
US$11.96 per MMBTU

15
Integrated 2D Seismic Interpretation
 ONGC has carried out 2D integrated interpretation recently –
2500 km
 Identified toe-thrust prospects in deeper cretaceous horizons

16
Additional Leads for Future

 The toe-thrust related


feature identified during
the study can prove to be
a possible new HC play
 The fault closure
identified during the
study shows closure at
four levels: Early
Cretaceous, Late
Cretaceous, Palaeocene
and Eocene
 Need further detailing by
3D seismic
 If tested HC bearing, can
significantly enhance the
17 viability of the field
Thank You