Block Brief
• Block awarded under NELP-II (2001)
• PI: ONGC 40%, IOC, GAIL & OIL (20% each)
• Area: Initial – 8330skm, Present - 4061 skm
• Block re-categorized as deep-water block
• 1st Mio.-Pliocene Gas Discovery:
Well MDW-2A (23.12.2006). Appraisal
plan consisted of 1 firm (MDW-6)
DOC submitted on 21.12.2009 &
Reviewed on 15.06.2010.
• 2nd Paleogene Gas Discovery:
Well MDW-10 (11.12.2010). Paleogene
Appraisal Plan consisted of 3 firm
locations (MDW-18, 19 & MDW-24)
DOC Submitted: 24.12.2013. Review by
DGH awaited
• MoEF requested for 181 days Extn. under
Excusable delay.
2
Work Committed vs. Actual
Phase-I [16.8.2001 – 15.8.2003]
Activity MWP Achieved
API of 2D seismic data 1000 km 1000 km
Reprocessing / Special processing Nil 491 km / 115 km
Phase-II [16.8.2003 – 15.2.2007]
Activity MWP Achieved
API of 3D seismic data Nil 625 sq km
Special processing / AVO Nil / Nil 625 sq km PSTM / 170 sq km
Drilling of exploratory well 2 wells [2000m & 2200m] 2 wells [3039m & 2200m]
Phase-III [16.8.2007 – 18.12.2010]
Activity MWP Achieved
API of 3D seismic data Nil 853 sq km
Special processing of existing data 1000 km Nil
Drilling of exploratory well 2 wells [2000m & 2200m] 2 wells drilled [2585m & 3230m]
Appraisal Period [19.12.2010 – 26.12.2013]
Activity MWP Achieved
Drilling of exploratory well 3 wells [3200m, 3850m & 4850m] 2 wells drilled [3300m & 3882m]
3rd well under drilling
3
Seismic Coverage
4
Drilling Status
5
Reconstructed Seismic
6
Established Mio-Pliocene Gas Sands
7
Combined Mio-Pliocene Pay Map & Reserve for DOC
MN-OSN-2000/2 MN-DWN-98/3
GIIP:26.78 BCM CM GIIP:3.5 BCM
8B N
Ultimate:16.2/18.2
4. 5 Ultimate: 1.78/2.14BCM
LE
BCM
AD
LEAD-B
-C
6.4BCM
CM
B
-A 3.5
D
A M
E
L BC
. 98
6 MDW-6
M
BC
Total Reserve:
MDW-2A
84
GIIP:30.28 BCM
8.
Ultimate:17.98/20.34
BCM
Pay:1640-1700, 1700-1710 1800m 1350-1380//////
8
Development Concept
9
Development Plan: Case-I (12 + 1 well)
10
Option: Subsea Tie Back to Shore
11
Commerciality
Integrated development
Project IRR @ 14%
commercially viable at
minimum gas price of
US$10.72 per MMBTU
12
Development Plan: Case-II (7 + 1 well)
13
Option: Subsea tie back to FPS (Hired)
14
Commerciality
Integrated development
Project IRR @ 14%
commercially viable at
minimum gas price of
US$11.96 per MMBTU
15
Integrated 2D Seismic Interpretation
ONGC has carried out 2D integrated interpretation recently –
2500 km
Identified toe-thrust prospects in deeper cretaceous horizons
16
Additional Leads for Future
18