Engineer Sutay
Engineer Sutay
Nimde Hyer n
3 3
LEVELING
show the use and booking of readings using the digital level show the use and reading of the digital level instrument
LEVELING CONTINUES
show a bench mark shows the use of the staff for leveling
LEVELING CONTINUES
show level instrument for setting out heights during Atafoa bridge construction
4
LEVELING CONTINUES
show the use of the automatic level instrument
LEVELING CONTINUES
Image showing the use of the automatic level staff
GLOBAL POSITIONING SYSTEM
SURVEY
8
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
9
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
shows the use of the RTK instrument for right of way surveys
10
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
showing the use of the RTK instrument
11
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
image showing stakeouting right of way
12
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
image showing stakeouting right of way
13
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
shows the use of the RTK GPS and logger for stakeout
14
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
show the use of the RTK instrument for the gridding exercise
15
GLOBAL POSITIONING SYSTEM SURVEY CONTINUES
16
Total station
• Total station SET3X was deployed to monitor and check
setting out works on the Atafoa Bridge at Atafoa in the
Ashanti region on the Abrepo to Barekese road. Other works
done at the bridge included;
shows the use of the target prism and pole for setting out
Total station CONTINUES
show supervision of site works at Atafoa Bridge during construction
VARIOUS SITE VISITED
illustrate preparation of trench to receive rock stabilization show the devastation caused by the culvert collapse at Aduman
VARIOUS SITE VISITED CONTINUES
shows a laid thick base concrete slap and wall reinforcement in progress
22
VARIOUS SITE VISITED CONTINUES
Image showing measuring of width at Banka
23
VARIOUS SITE VISITED CONTINUES
Image showing measuring of width at Banka
24
THANK YOU