Agenda
What is Rapid Connect?
Network Cloud Connectivity
Rapid Connect in Cloud-based hybrid world
WAN Connectivity Layer (WCL) – Connectivity
Options
“Value Propositions” for the Customer?
Rapid Connectivity Capability in phase
Q&A
2 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
What is Rapid Connect?
Rapid Connect is a ES / ITO Program
• It consolidates and focuses diverse Pan-HP efforts from ES and EG groups and domains to
deliver an orchestrated, global, agile, scalable, secure Cloud infrastructure to strategic Data
Center Cloud and Hosted Services.
• It offers rapid enablement of end-to-end Cloud and Hosted services via redundant Carrier MPLS
transport.
• It acts as a rapid / pre-provisioned key enabler for the Helion Network Ecosystem.
Reliable
Timely Secure Dynamic
Choice
3 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
What is Rapid Connect? (Cont’d)
Rapid Connect is a “pre-provisioned” MPLS connection and HP ITO-agile internal process improvement,
driving HP Helion Managed Cloud and traditional Managed Services offerings through joint Go-to-Market
with our carriers. This will allow the carrier’s customers to connect to HP Data Centers via VLANS to our
portfolio of cloud services and existing managed services, in a matter of days instead of months.
• Rapid Connect Solutions are different in that the Carriers use a multi-tenant Network to Network Interconnect (NNI)
to connect their Provider Edge (PE) equipment directly to HP's WAN Connectivity Layer (WCL). Some Carriers are
installing their PEs inside HP's data center walls and using a local 10Gigabit Ethernet for the NNI. Other Carriers
place their PE in their POPs and are installing multi-tenant Metro Ethernets to create the NNI. In either case the
outcome is the same for our clients ability to connect into the HP Data Center.
• Helion Connect Solutions is Option 1 for client to HP data center connectivity options. Option 1 is a Carrier
Leveraged MPLS service. Carriers install Leveraged MPLS Router with Ethernet Private Line (EPL) in HP Datacenter
Communication Rooms terminated to HP Leveraged WCL, HSP WAN Aggregation Switch or DC Core Routers.
Option 1 has limited availability typically at HP's strategic Data Center sites.
4 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
High-level Snap-shot:
HP Rapid Connect earlier known as Helion Connect offers rapid enablement of end-to-end Cloud and
Hosted services via redundant Carrier MPLS transport.
- HP ES is working with most major Global Carriers to have them pre-provision 10 G MPLS redundant pairs
into our 20+ strategic Data Centers that Hybrid cloud is present and are targets for Public Cloud (this is still not
finalized for public cloud)
- This will dramatically reduce the 100-120 days of provisioning time that traditional lease line circuits require,
- We are cross connecting the carrier PE routers in our comms rooms to our internal WAN Connectivity Layer (WCL)
that has or is the process of being upgraded. (See HP DCNA Architecture 2.3 for details on the WCL) All the VPC, Cloud and
Managed Services with the DC will be connected to the WCL within the DC. We anticipate this will reduced service activation time
to specific partner Carriers to less than 5 days in the first release. In release 2 with API /CSA Orchestration it will be less than 24s
hour and release 3 will be within minutes via OpenStack .
- We will use VLan on the Carrier MPLS to connect the customer securely over MPLS to our Services. This is a sell
with approach between HP and the associated Carrier.
The Carriers we are working with and whom are deploying to our DC at their cost are the following: ATT
(NetBond), VZ (Secure Cloud Interconnect, SCI) BT (Cloud Connect), Vodafone (Cloud Carousel), Orange
(Galerie) Level 3 (Cloud Connect) and CenturyLink. We are just in the early stages with Telstra and other APAC
Carriers.
The customer would pay the Carrier for bandwidth consumed and HP for services consumed in the DC. This will
work
5 with2015Cloud
© Copyright andDevelopment
Hewlett-Packard traditional
Company,hosted services
L.P. The information contained(all
herein services inwithout
is subject to change thenotice.
associated DC).
Existing capability
Develop and deploy MPLS circuits into strategic ESNI Data Centers targeting strategic Tier 1 & 2 Regional Carriers, allowing
rapid enablement of Cloud based services to HP customers with multiple locations
Extend Carrier PoP throughout the all GSN Data Centers via ESNI Hoteling / Landing Point
Start with the US and then rapidly expand to EMEA
Target 4 ENSI Locations: Chicago, Dallas, London and Frankfurt
See August 2014 NOD
Benefits:
• Fast and flexible for Carriers who want to start smaller, build ramp-up Business Case.
• This would also apply to customers who are Carrier agnostic.
• Federated HP Data Centers via MPLS interconnection
• Quick deployment to European Carriers and acts as a NNI Broker
• Highly secure environment
Disadvantage:
• There is a cost to the ITO organization for inter-DC connectivity, since circuits have been scaled back
• Possible latency /timing issues
8 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Goal is to Shorten Provisioning Cycles to Cloud Speeds
WAN Connectivity Layer and Carrier Cloud Connect Services allow Network to Flex with the Cloud
WCL Connections in the Data Center Additional Time to Connect New Leased Circuits
to the Data Center
Service Between Between Release 3 (Run) Release 2 (Walk) Release 1 (Crawl) Status Quo
provisioning compartments compartments Integration of Integration of Instantiation of for a new
within the with WAN with no WAN offering-specific carrier core routers in dedicated
Cloud Connectivity Connectivity systems to carrier provisioning strategic data private
Compartment Layer Layer API systems centers connection
2015-16 POR 2015 POR 2014-2015
9 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Today’s Traditional Circuit Provisioning vs. Rapid Connect
Traditional: 90 – 120 days
Technical review, Testing and
Customer Setting up a
churn equipment churn enablement: churn churn Setting up
business terms virtual network
procured, circuits Carrier and VLANs
contracted connection
ordered customer
The “Network as a Service” ecosystem is taking shape, led by Carriers. HP has Planned / Expected
established key partnerships. (Dates reflect joint Early Adapter start timeframes.) Dates: Projected Beta
Customer Launch
NetBond Secure Cloud Connect Cloud IQ+ Barolo & Cloud VPN Galerie
April 2015 Interconnect (SCI) Cloud Connect May 2015 Connect 2015
April 2015 April 2015 April 2015 May 2015
Direct Link/
Cloud Exchange Direct Connect Express Route Rapid Connect SoftLayer
HP must invest further to retain control of the user experience for HP Helion Hybrid IT customers and deliver upon partner and
market expectations. If HP does not invest further, Carriers will not invest in HP
12 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
What ARE OUR Goals for the First Phase (Internally)
Situation: Once a Carrier 10 G MPLS and associate PE Core Router is placed into
the ES Strategic DC and the WCL Switch /Router are in place and Services
connected to the WCL. Today this can range any here between 15 day to 60 days
for internal DC process and workflow.
Cloud
Client
HP Data Center 2
Any WAN
Dedicated
Option on WCL
Public Cloud
Co-Lo ++
14 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Helion Connect Solutions - Option 1
Helion Connect Solutions is Option 1 for client to HP data center connectivity options. Option 1 is a Carrier Leveraged MPLS service. Carriers install
Leveraged MPLS Router with Ethernet Private Line (EPL) in HP Datacenter Communication Rooms terminated to HP Leveraged WCL, HSP WAN
Aggregation Switch or DC Core Routers. Option 1 has limited availablity typically at HP's strategic Data Center sites.
HP Managed Leveraged WAN CPE + WAN Connectivity Layer (WCL) - Option 2
Order Direct unbundled Ethernet Private Line (EPL) circuit from carrier to terminate on HP managed hardware like WCL, HSP or Helion VPC. These Direct
Unbundled EPL Circuit use a local access circuit to connect from Carrier MPLS POP to HP Leveraged WCL, HP Leveraged Aggregation Switch or DC Core
Routers.
HP Managed Dedicated WAN CPE - Option 3
Order direct unbundled EPL circuit from carrier to terminate on HP managed hardware like Managed WAN Service client dedicated routers. Option #3 uses a
Direct Circuit Into Data Center with Dedicated HP Managed Client WAN CPE device. Unlike Option 2 which EPL terminates on leveraged CPE.
Client/3rd Party Managed Dedicated WAN CPE in VAR - Option 4
Option #4 is a Direct Circuit into Data Center with 3rd Party Managed Client WAN devise in the Vendor Access Room (VAR). Order a bundled (not
unbundled) circuit with MPLS and carrier managed hardware with the carrier managed circuit and Customer Edge (CE) router to be installed in HP's VAR.
Client/3rd Party Managed CPE at Colocation Site - Option 5
Metro Ethernet Service (MES) or 10G Network With 3rd Party Managed Client WAN Device At An Offsite Colocation Site (For details see Co-Lo Available
Site Tab in Global Data Center Access file). Some HP datacenters do not allow for non-HP managed equipment inside the datacenter. For these sites HP
requires clients to purchase colocation space from a carrier hotel facility and back-haul circuits into the HP datacenter.
Client/3rd Party Managed Dedicated WAN CPE in Communication Room- Option 6
A Communication Room is similar to a Vendor Access Room except there is no physical security separating the 3rd party access from HP. For Option 6 order
a Direct circuit into the HP Datacenter with 3rd party managed client WAN device in the Comm Room (CM).
Client/3rd Party Managed Dedicated WAN CPE in Data Hall - Option 7
A Data Hall is a large room inside the Data Center where all equipment is located in rows of racks or cabinets. A Data Hall is sometimes also called a Module.
A "cell" is a sub-section of the Hall or Module. Some HP Datacenters are not built with Comm Rooms or VARs and these sites allow escorted clients/3rd party
staff 15to install equipment
© Copyright in racks
2015 Hewlett-Packard insideCompany,
Development the datacenter. Therecontained
L.P. The information is no herein
physical security
is subject separating
to change without notice. the 3rd party access from HP. For Option 7 order a Direct
circuit into the DC with 3rd party managed client WAN device in the Data Hall.
Helion Continuity with GSN
16 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
16
Helion Continuity with 10G
17 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
17
Helion Continuity with Internet
18 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
18
What are the “Value Propositions” for the Customer?
Wants improved security as compared to existing Internet connections
Rapid connectivity and access to Data Center Services (traditional and Cloud)
• Days not months
Application bandwidth demand is variable
• Demand is variable and traffic bandwidth requirements are unknown
• Scalable workloads
• Applications which require higher bandwidth periodically (i.e., DR, continuity, end-of-month / quarter activities)
Lower pricing for bandwidth consumed with minimal commitment
• Usage / consumption based model
• Data plans tiered if desired
• Not locked into a long term contract; flexible pricing
Future flexibility and choice
• Test / development environments, then rapid shift to production, Zero friction
• Carrier choices, access to multiple Cloud and traditional services quickly (diversity)
19 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
What are the “sweet spots, targets of opportunity” for
HP / Rapid Connect?
Change in customer’s company / organization (change / agility)
• Acquisition / divesture
• New joint partnerships (Need new /revised connectivity and application access)
• Transition / transformation timeframe improvement
20 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
What are the “sweet spots, targets of opportunity”
for HP / Rapid Connect? (page 2)
Need a (1 M to 10 Gig) MPLS secure connection / access to an HP traditional or Cloud
service (agility / implementation speed)
Customer is unsure about network bandwidth requirements (uncertainty)
• New applications
• Test / development
• Scalable workloads
• Scheduled spikes due to end-of-month / quarter applications and data exchanges
Existing customer using a dedicated circuit into an HP data center (value, cost savings /
agility)
• Bandwidth cost saving opportunity
• Consultative approach to additional HP service / offers
• Circuit grooming potential (HP cost savings)
HP receives revenue 100 days earlier than existing processes and improved customer
satisfaction on speed and quality of delivery.
21 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Mutual Benefits (Customer Gets Timely, Secure, Dynamic, Reliable Choices)
Flexible, cost effective choices to Scalability / Agility of Network Scalability / Agility of Hosted
meeting changing business Infrastructure Services
requirements
Time to Market, get what you need Rapid Provisioning of Network Rapid Provisioning of multiple
quicker Infrastructure Services (Traditional & Cloud)
Minimize unplanned risks and Inherent Redundancy and Security Inherent Redundancy and Security
improved security ( Alt. path routing) ( DC Pairing, GNS Overlay /
Multiple Carrier choices)
Global Coverage/ Regulatory Global Footprint, Strategic Point Global Footprint, Regulatory Data
Diversity
22 of Presence on MPLS
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Protection
Workplace Management Services Solution Examples
23 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Why is HP Rapid Connect critical to our Helion Cloud Hybrid IT strategy?
24 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Market Data : Direct Connections
Strategic Planning Assumption: By the end of 2016, direct connections from all major global and regional CSPs will allow enterprises to bypass
the Internet and enjoy superior performance, up from 20% at the end of 2014.
Analysis by: To Chee Eng, Gartner Dec 2014
Market Implications:
The lack of consistently good performance over the Internet is a major inhibitor for widespread cloud adoption . The problem is compounded by
additional latency while accessing services hosted in faraway, offshore locations.
This implementation is new, and is led by a small number of large CSPs and cloud providers. It is typical for large players to cooperate with each
other at the early stage of a new market development. As the market gains maturity, the large CSPs and cloud providers will extend the
cooperation to more providers.
Within the next two years, Gartner expects all major global and regional CSPs to establish direct MPLS connectivity to the major cloud IaaS and
SaaS providers, enriching the network infrastructure for accessing public cloud services.
There is a less than 20% probability that the large CSPs and cloud players will limit the cooperation among themselves, shutting out smaller
players. However, there are too many players in the marketplace, and competition will drive the more aggressive players to widen their
partnerships and force others to follow suit.
This will democratize the marketplace, creating more options for enterprises. This will spur adoption of cloud, which will in turn encourage
providers to connect with each other, creating a virtuous cycle of growth.
Recommendations:
Enterprises with public cloud requirements should now include direct connectivity to their preferred cloud providers as part of their evaluation
criteria when selecting a CSP.
25 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
25
Backup
• Rapid Connect (internal) SharePoint Will Not change the name of this internal
SharePoint site.
https://ent301.sharepoint.hp.com/teams/ProgramHPConnect/_layouts/15/start.aspx#/SitePag
es/Home.aspx
26 © Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.
Thank you
Questions?
© Copyright 2015 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice.