justification Amlohri OC (14 MTY) dated 02.09.2015 S. No. Condition Justification 1. The OB shall be completely re- The method of mining adopted in Amlohri OCP handled at the end of the is such that the void is continuously being mining. technically reclaimed , there after the dump is biologically reclaimed in stages. The void left at the end of mining will be filled with OB of the neighboring Nigahi mine, so no re-handling is foreseen at the end of mining. 2. The land after mining shall be Since majority of the mine area is forest land, it brought back for agriculture shall be technically reclaimed and afforestation purpose. will be done as per the approved mine closure plan and handed back to forest department. 3. Mine water should be treated Mine water is stored in mine sump and after for discharge in to the lagoon. treatment is being re-used for industrial The quality of lagoon water activities like dust suppression and horticulture. shall be regularly monitored No mine water is being discharged outside mine. and mitigation measures taken. Amlohri OC (14 MTY) dated 02.09.2015 S. No. Condition Justification 4. Besides carrying out regular periodic IME and PME of the workforce health check-up of their workers, 10% of engaged are regularly carried out. the workers identified from workforce However, the work for the health engaged in active mining operations shall study was awarded to NIOH, be subjected to health check-up for Ahmadabad and they are not occupational disease and hearing responding for the work. impairment, if any, through an Guidance for conducting the specialized agency/institution within the health study through any other District/State and the results reported to agency is requested, with this Ministry and to DGMS. extended time. Amlohri OC (15 MTY) dated 26.07.2022 S. No. Condition Justification 1. Encourage use of cleaner fuels for Guideline for the use of cleaner trucks. If the roads required to be fuels in not clear all the plant and widened upto nearest railway siding, machinery is already running on the same be constructed to avoid traffic high efficiency diesel or on congestion. electricity. 2. Increase green belt cover by 40% of the At present the green cover total land area beyond the permissible created is 37.24% and as the requirement of 33% wherever feasible. mining activities are going on the desired 40% green cover would be obtained in 3-4 years. The post mine closure green cover would be 76.57%.
Eia For The Proposed Pipeline From The Temane Liquids Processing Facility To A Floating Storage and Offloading Unit in Inhambane Province Mozambique PDF