Introduction to the company Introduction to the project Scope of work

1) Background Study 2) Site Selection 3) Brainstorming meets for Technology Selection 4) Software training 5) Vendor management assistance 6) Preparing DPR

Conclusion Learnings

Gensol Consultants Pvt. Ltd. founded in March 2007 is a 3600 Environment Solution Provider having expertise in generation, registration and trading of Certified as well as Verified Emission Reductions (CERs and VERs), better known as carbon credits.

Gensol has spread its area of expertise from providing consultancy for Clean Development Mechanism (CDM) to financial advisory services for the setup and expansion of client infrastructure, thus providing them with a complete package to grow and benefit from its expertise and assistance.

2 MW Grid Connected Captive Solar Power Plant



Plant Capacity Location Village District

: : : :

2 MW ( 4 x 500 kW) Plot No. 34 ,Behind Plant site Mohali, Taluka: Kalmeshwar, Nagpur, Maharashtra
: : : 3.31 million units (Approx). 14 Acres. Rs 23.8 Crores

Total energy generation Land Area requirement Estimated Project Cost

Yaaad ni mainu ki ki paaya si ethe

2) Site Selection
Google shots

Plot 34

Plot 42

Plot 43/2

Plot 45

Plot 107

Plot 108

Plot 110

2) Site Selection
Plot 34
No shading obstacles on South side. A total waste land which cannot be used for any other purpose, so a perfect place for Solar Power Plant to make a constructive use of the land. The site is at a distance of about 3-4 km from 220 kVA substation and about 5 km from 33kVA substation. The whole area is un-even and full of wild grass and trees up-to a height of 2m. Certain big trees are also present near the periphery of the plot area.

Plot 42
No shading obstacles on South side. The site is at a distance of about 3-4km from 220kVA substation and about 5 km from 33kVA substation. The construction or Operation of the Solar Power Plant wont disturb the regular operations of the plant. The site has no trees and also it is a levelled land with little burnt wild grass.

Plot 43/2
No shading obstacles on South side. The site is 3-4kM from 220 kVA substation and about 5km from 33kVA substation. The whole area is un-even and full of wild grass and trees up-to a height of 2m.

Plot 45
No shading obstacles on South side. The site is 3-4kM from 220 kVA substation and about 5km from 33kVA substation. The site is not surrounded by the boundary wall

Plot 107
No shading obstacles on South side. The site is 3-4kM from 220 kVA substation and about 5km from 33kVA substation. The site is not surrounded by the boundary wall. Although the site is undulating but it is well connected to the other plots. The site will require lot of levelling.

Plot 108
No shading obstacles on South side. The site is 3-4kM from 220 kVA substation and about 5km from 33kVA substation. The site is not surrounded by the boundary wall. Although the site is undulating but it is well connected to the other. The site will require lot of leveling as it has heaps of mud mounded on the plot of

land , dumped as a result of construction nearby.

Plot 110
No shading obstacles on South side. The site is 3-4kM from 220 kVA substation and about 5km from 33kVA substation. The site is not surrounded by the boundary wall. Although the site is undulating but it is well connected to the other. The site has got a north sloping & is well drained & connected to other sites.

Decision:
Considering all the key findings and discussions, the required capacity of 2MW plant can be suitably placed at the plot number 34 & 42, 43/2 & 108 jointly as all these plots are well connected & most of the plot is leveled apart from few trenches on the boundary. The total area comes to be about 15-16 Acres. Also the sites are free from weeds & small size vegetations as they are burnt.

3) Brainstorming meets for Technology Selection

Eh v ni yaad,,, table si koi tusi ik image copy kiti hoi si,,, 5 points wali,,, battery charger etc Conlusion slide si ik,,,,,, thin film kyu use kiti,, I guess

4) Software training
Hyperlink add kr lo

5) Vendor Management Assistance


Hyperlink add kr lo ji

6) Preparing DPR

Conclusion
The DPR was at its final stage of reviewing and the project was ready to be evaluated on efficiency parameters before submitting the DPR and installation of the the plant. It was altogether a learning experience which has helped me to built in a deeper interest in the subject.

PICS ADD KR LEO JITHE JITHE KRNI

Learnings
Technical background of PV solar plant system. Decision making Interpersonal and professional skills through vendor management. Basics of the office software Practical Knowledge of the subject.

thank you

GO GREEN