Scope of Presentation
1.
Introduction
Problem Description Objective Design Constraints Design Requirements Idea Generation
2. Conceptual Design
Functional Analysis Diagram Morphological Chart Concept Screening (A, B, C) Concept Evaluation
Scope of Presentation
3.
Detailed Design
Working Principle Detailed Calculation
Cost Analysis
Part Explosion Diagram
Introduction
Problem Description
Unable to play basketball due to heavy rain Unable to enjoy a safe game in heavy thunderstorm
Objective
Introduction
Design Constraints
1. 2. 3. 4. 5.
Able to protect user from all weather Able to install to existing basketball courts Safe to operate Must be mounted outside the basketball playing premises Aesthetics
Site Survey
Bukit Batok
Market Survey
100 basketball court users and residents Results:
Design Requirements
1.
2. 3. 4. 5. 6.
7.
8. 9.
Aesthetic Corrosive Resistant (weatherproof) Durable Low Maintenance (modular) Provide Shelter Quickly Strong Structure (able to withstand extreme conditions) Simple Mechanism User Friendly Safety
Exploration of Ideas
Exploration of Ideas
Conceptual Design
User Input
Activate Shelter
Move Shelter
Shelter fullyextended
Shelter retract
Shelter Move
Shelter fullyretracted
Morphological Chart
Activate Shelter
Move Shelter
Concept Screening
Concept A
Activate Shelter
Move Shelter
Activate : Servo
Precision required due to Curvy shape Easy to Manipulate Positions Expensive, Difficult to Programme
2.
Cheap & Easy to Manipulate motion Easy to Manipulate Positions Corrugated tubing required to protect Slot Rail
3.
Easy to link up with Electrical Systems above Longer Sensing Range Cheap, Consistent detection
Concept B
Activate Shelter
Move Shelter
Energy Saving Fixed systematic actuation Prevent Backlash Motion Take long time to fully extend shelter Tiring for User
2.
Simple & Cheap May face functional issues due to obstacles on Rack Fixed systematic actuation
3.
Concept C
Activate Shelter
Move Shelter
Able to Manipulate Heavy Structures Prevent Backlash Motion Expensive, High Maintenance required
2.
Prevent Backlash Motion Able to Efficiently Move Heavy Loading Possibility of Chain slippage
3.
Easy to link up with Electrical Systems above More accurate that Level Limit Switch
Concept Evaluation
Criteria
Aesthetics Durability Low Maintenance Provide Shelter Quickly Strong Structure Simplicity of Mechanism User Friendly Safety
Weight Factor
0.22 0.07 0.11 0.12 0.08 0.05
Concept A
Values
4 4 3 4 3 3
Concept B
W.V
0.88 0.28 0.33 0.48 0.24 0.15
Concept C
W.V
0.66 0.28 0.55 0.36 0.32 0.25
Values
3 4 5 3 4 5
Values
5 3 2 4 4 2
W.V
1.1 0.21 0.22 0.48 0.32 0.1
0.15
0.2
4
4
0.6
0.8
3
4
0.45
0.8
3
3
0.45
0.6
3.76
3.67
3.48
2.
3.
Closed Views
Deployed Views
Detailed Design
Detailed Calculations
1.
Main Structure
Stress Deflection
2.
Brushless DC Motor
3.
Fan
4.
Lightings
Luminance
RAX RAY
7m
RX RY
21.5m
RBX RBY
Centroid
X = 9.13 m Y = 2.97 m RA
7m X 21.5m Y
W = 100N/m = 2150N
RA
RB
RB
RA
X Y
RB
1237N
913N
1237N
913N
On April 1984, a small-scale event which produced very high gust speed of 40.1 m/s at Tengah
Note: 40.1m/s = 144.36km/hr
Forces of Wind
Note: 40.1m/s = 144.36km/hr = 89.7 mph
For 90 mph
Fan Selection
There would be 124190.5 ft3 of static air within the Basketball Court
In the scenario that the air is turned over 1 times in 1 hour Basketball Court will require 124190.5 ft3 of air
Assume: Lamp Lumen Depreciation (compact fluorescent) = 0.85 Ballast Factor = 0.95 Luminaire Dirt Depreciation = 0.85
Coefficient of Utilisation Table Assume that the surface reflectances: Pfc, floor = 20% PCC, ceiling = 10% Pw, wall = 10% RCR = 3 (round down) Coefficient of Utilisation = 0.48
Embodiment of Design
3 Rules
4 Principles
3 Rules
1.
Clarity
Any ambiguity in the design must be eliminated No unintended functions Simple words to indicate clearly the function of buttons on
2. Simplicity
Design as simple as possible Unnecessary complicated steps are eliminated
3 Rules
3. Safety
Adequate strength, reliability and accident prevention
operating
When shelter mechanism fails, warning signals and alarm
will be activated
Proximity sensor to detect obstacle at the track
4 Principles
1.
4 Aluminium Alloy poles are used to support the canopy Improves clarity as tasks do not interfere with one another
4 Principles
3. Self-Help
4. Stability/Instability As canvas is spread over entire basketball court, Al Alloy Poles are used to support the canvas sheet to prevent drooping of canvas
Cost Estimation
Cost Estimation
To fully estimate the cost of a product, the following steps are needed: 1. Have a set of detailed drawings of all components; 2. Create a Part Explosion Diagram (PED) and list out the items; 3. Come up with a sketch routine for self-manufactured items; (will be done in later part of project)
4. Obtain the prices of raw materials and commercial items, then the overall selling price of design
Material Selection
Material A
Galvanised Steel Track
Material B
Steel Track
Material C
Steel Track
Properties
Corrosion resistance, high durability, light weight, good heat insulation, good surface finish
1. Steel Track
High corrosion resistance , flexibility and resistance to wear-and-tear, high strength to weight ratio
7. Canvas Sheet
100% Polyester
100% Polyester
100% Acrylic
Waterproof, Tear-Resistant with excellent tensile strength, Flame Retardant and lightweight good mechanical properties, good weldability, suitable for general purpose use
FibreGlass Rods
Al Alloy Rods
high strength, high toughness, high temperature strength with good workability, good weldability
Steel Frame structure 11 2 P Steel Track 1 6 P Steel Track Rollers 2 6 P Canopy Supporting Pole 8 6 P Canvas sheet 7 4 P Ventilation Fan Stainless Steel Wire 3 4 P Electrical Wire Drum 4 4 P 9 2 P Shelter Assembly
Main structure 10 1 M
12
1 M
Lightings
14 10 P
Cable Assembly
6 1 M
Drive System 13 1 M
3
4 5 6 7 8 9 10 11 12 13 14
P
P P M P P P M P M M P
Cost Centre
Item nunber Description Unit Cost ($/unit) 1.30 2.50 0.2 1,500 10.77 Quantity Per Assembly (units) 2.60 6 7874.02 4 12 Cost Per Assembly ($/order) 338 15 1,574.8 6,000 129.24 338 15 1,574.8 6,000 129.24 Order Cost ($) 1 2 3 4 5 Steel Track Steel Track Rollers Stainless Steel Wire
7
8 9 11 14
1.97
5.18 290 2000 44.95
1218
88 2 98.95 10
2,399.46
455.84 580 197,902 444.95
2,399.46
455.84 580 197,902 444.95 209, 839
66