Cable Schedule
1
Cable Schedule
Objective :
Grouping of all field signals
MTO of Cables & Junction Box
Input to Instrument Layout
2
Cable Schedule
Philosophy
Junction boxes shall be dedicated to one signal category only .
Intrinsically safe circuits and non-intrinsically safe circuits shall
not be contained within the same cable or marshaled in the same
junction box.
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard) 3
Cable Separation
Instrument signals shall be divided into the following groups & categories :
Group 1 - Instrument Power and Control Wiring above 50V Group 3 – Low Level Signal Wiring (below 5V DC)
Cat Service
J AC Power Cat Service
P DC Power T Thermocouple Signals (Type K T/C)
R Resistance Thermometer Signals
Group 2 – Signal Wiring
Group 4 – Miscellaneous
Cat Service
L Analogue Signals Cat Service
A Alarm, Status & Control Signals (except SOV) F Fire Detection/Alarm Signals
D Digital Signals (Frequency or Pulse) G Gas Detection/Alarm Signals
S Sequence & Control SOV H Data Highway/Serial Link/Fibre Optic
E Safety Earth
X Project Defined User Choice
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard) 4
Field Cable and Junction Box Numbering
Main cable numbers consist of a prefix defining the signal category
followed by a sequential number:
For e,g : L 001
S 022
Sequential numbers is Consecutive irrespective of signal category.
Number of digits may vary
Main junction box number is derived from the main cable number
prefixed JB:
For e.g : JB L001
JB S022
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard) 5
Field Cable and Junction Box Numbering
Secondary multicores (ie. multicores between the main JB and
secondary JB) are derived from the main cable number with a suffix
letter:-
For e.g. L 001A
L 001B
Secondary junction box number is derived from the secondary
multicore number prefixed JB:-
For e.g. JB L001A
JB L001B
Secondary cable number from JB to individual instrument is derived
from the main cable number with a 2 digit suffix corresponding to the
pair number in the main cable:-
For e.g. L 00108
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard) 6
Field Cable and Junction Box Numbering
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard)
Field Cable and Junction Box Numbering
The system described above is modified slightly when 2 main cables
are run to the main junction box. In this case the main cables are
suffixed A & B:-
For e.g. L 003A
L 003B
Any secondary multicores carry a further suffix:-
For e.g. L 003AA
L 003AB
Secondary cables are numbered as though the 2 main multicores were
one larger cable:-
For e.g. L00301 TO L00320 } Pairs 1 to 20 in L003A (20 Pair)
L00321 TO L00330 } Pairs 1 to 10 in L003B (10 pair)
Reference : Instrument Cable Specification (Foster Wheeler Engineering Standard) 8