- DocumentResearch on E...ebble Stratum_孙正阳uploaded byJovan
- DocumentPrediction and analysis of slurry shield TBM disc cutter wear and itsuploaded byJovan
- DocumentSimulation_of_maintenance_strategies_in_mechanized_tunnelinguploaded byJovan
- DocumentRobustness evaluation of cutting tool maintenance planning for soft ground tunneling projectsuploaded byJovan
- DocumentShield Construction Multiobjective Optimization of Surface Settlement Safety Control Based on Machine Learninguploaded byJovan
- DocumentPrediction and analysis of replaceable scraper wear of slurry shield TBM in dense sandy ground A case study of Sutong GIL Yangtze River Crossing Cable Tunneluploaded byJovan
- DocumentMachine learning forecasting models of disc cutters life of tunnel boring machineuploaded byJovan
- DocumentGeological adaptability matching design of disc cutter using multicriteriauploaded byJovan
- DocumentPrediction of Disc Cutter Life During Shield Tunneling with AI via theuploaded byJovan
- DocumentIntroduction of an empirical TBM cutter wear prediction model for pyroclastic and mafic igneous rocks; a case history of Karaj water conveyance tunnel, Iranuploaded byJovan
- DocumentEvaluation of tool wear in EPB tunneling of Tehran Metro, Line 7 Expansionuploaded byJovan
- DocumentEmpirical Cutting Tool Wear Prognosis for Hydroshield TBM in Soft Grounduploaded byJovan
- DocumentEvaluation on the adaptability of shield cutter head systemuploaded byJovan
- DocumentAssessing maintenance strategies for cutting tool replacements in mechanized tunneling using process simulationuploaded byJovan
- DocumentCutting tool wear prognosis and management of wear related risks for Hydroshield TBM in soft grounduploaded byJovan