Customer BPDate:

TK

Hydro materials Braces Tank Material Floating Roof Material

0 0 1 1

$0 $0 $0 $0

$0.00 $0.00 $0.00 $0.00

Misc. Weld Rods Material

1 1.5

$0 0

$0.00 $0.00 $0.00

Automatic Automatic Crane Freight for Crane Man Lift Man Lift 1-welding machine 2-welding machine 3-welding machine 4-welding machine 5-welding machine 6-welding machine Out House Equipment Freight 1 A/C Fuel Tank PU/ Truck 1-shack Scaffold Boards Misc. Equipment Fuel 0 X-Ray Freight Enginerring Foundation Painting Cold Tar Total Subs Substiance Travel Pay

0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 3.20

$3,800 $3,800 $3,800 $800 $2,600 $2,600 $500 $500 $500 $500 $500 $500 $110 $1,600 $950 $250 $750 $320 $0 $1,200 0

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

0 0 0 0 0 0

$1,000 $1,800 $5,500 $50 $50 $50

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $893.03 $0.00

$9.00

99

Date : TkFT Pcs Safety Move In/Set Up Unload materials Cut Door Sheet Install Pegging Mount Tugger Build Ramp Lay Deck Weld Break downs Fit Up outter Rim weld outter rim verts weld up outter rim C/W clean up outter rim weld Fit up Bulk Heads weld out bulk heads Clean bulk heads fit up inner rim weld inner rim verts weld inner rim C/w clean inner rim C/W install Pontoon legs Clean up pontoon legs Clean out pontoons Fit up pontoon covers weld cover to outter rim weld covers weld covers to inner rim clean up covers Water stops install pontoon manways clean up pontoon manways Fit up deck weld out deck clean up deck Install Deck Legs clean up legs Install Bleeder vents Install Manways nozzle nozzle nozzle nozzle nozzle nozzle nozzle Install Drain Sump Install ladder track Rework Plat form Install ladder Install ladder ground 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -3 -3 -50 -50 0 0 0 0 0 0 -50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Hrs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -6 -2 -3 -1 0 0 0 0 0 0 -3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1-superintendent 1- foreman 1 - welder 2 - welder 3 - welder 4 - welder 5 - welder 1-bullganger -3 -3 -3 -3 -3 -3 Days Weeks Months 0 -0.08 -0.02 1-superintendent 1-hole watch 1-fire watch Total Hours -22 -3 -3 Column Column Total Labor Hours C L -14 -1 -16 Misc 10 % -1 clean out tank Install door sheet X-Ray Hydro Test Drain & clean Tank Clean up load out 1 1 1 Remove roof Install Strikerpads Remove pegging grind pegging burrs install roof drain test drain diesel test roof Install primary seal install secondary seal Install Auto gauge well Install Guide pole well Install Guide pole install well seals 0 0 0 0 0 0 0 FT Pcs 0 0 0 0 0 0 Hrs 0 0 0 0 0

Clean Off roof

1-Fire watch 1-Hole watch

0 -3 1 -22

-14