Professional Documents
Culture Documents
Week 6
Review Homework Problems Ch 3: 2, 4 Chapter 3: Problem Solving Desksides: 7 QC Tools Flow chart Run Chart Pareto Diagram Histogram Cause and Effect Diagram Check sheet Scatter diagram Control chart
Week 7 assignment Read chapter 4 Homework problems: Ch 3 11, 12, 23, 28(c)
Pareto Chart
Histogram
Process flow diagram Check sheet Scatter diagram Control chart Run Chart Cause and Effect Diagram
Quality Improvement: Problem Solving
Pareto Principle
Juran used the term vital few, trivial many. He noted that 20% of the quality problems caused 80% of the dollar loss.
7 Quality Tools
Quality Improvement: Problem Solving
Pareto chart
30
% Complaints
28
25 20 15 10 5 0
Loose Threads Stitching flaws Button problems Material flaws
16 12 12 6 4
7 Quality Tools
Quality Improvement: Problem Solving
70
(64)
Pareto Chart
60 50
40
30 20 (13) 10 0 (10) (6) (3) (2) (2)
Histogram
25 20
Frequency
15 10 5 0
1. 9 2. 9 3. 9 4. 9 5. 9 6. 9 7. 9 8. 9 9. 9 10 .9 11 .9 12 .9 13 .9 14 .9 15 .9 M or e
Category
7 Quality Tools
Quality Improvement: Problem Solving
Histogram
40 35 30 25 20 15 10 5 0
1 2
6 13 10 16 19 17 12 16 20 17 13
5 6 2
Flowcharts
Flowcharts
Graphical description of how work is done. Used to describe processes that are to be improved.
7 Quality Tools
Quality Improvement: Problem Solving
Flow Diagrams
" Draw a flowchart for whatever you do. Until you do, you do not know what you are doing, you just have a job.
-- Dr. W. Edwards Deming.
Flowchart
Activity
Decision
Yes
No
7 Quality Tools
Quality Improvement: Problem Solving
Flowchart
Flow Diagrams
Flow Diagrams
Transportation
Delay Storage
Process Chart
Date: 9-30-00 Analyst: TLR Operation Transport Inspect Delay Storage Location: Graves Mountain Process: Apple Sauce Description of process Unload apples from truck Distance (feet) 100 ft 30 50 ft 360 20 ft 15 20 5 20 ft 30 480 190 ft Time (min) 20 Step 1 2 3 4 5 6 7 8 9 10 11 Page 1 0f 3
Check Sheet
Shifts
Defect Type
7 Quality Tools
Check Sheet
COMPONENTS REPLACED BY LAB TIME PERIOD: 22 Feb to 27 Feb 1998 REPAIR TECHNICIAN: Bob TV SET MODEL 1013
Cause-and-Effect Diagrams
Show the relationships between a problem and its possible causes. Developed by Kaoru Ishikawa (1953) Also known as
7 Quality Tools
Quality Improvement: Problem Solving
Quality Problem
People
Equipment
7 Quality Tools
Quality Improvement: Problem Solving
Fishbone Diagram
Measurement
Faulty testing equipment Incorrect specifications Improper methods
Human
Machines
Out of adjustment Tooling problems Old / worn
Quality Problem
Defective from vendor Not to specifications Materialhandling problems Poor process design Ineffective quality management Deficiencies in product design
Environment
Materials
Process
Advantages
making the diagram is educational in itself diagram demonstrates knowledge of problem solving team diagram results in active searches for causes diagram is a guide for data collection
Scatter Diagram
Run Charts
Examine the behavior of a variable over time. Basis for Control Charts
Control Chart
27 24 21
UCL = 23.35
c = 12.67
Number of defects
18 15 12
9
6 3 LCL = 1.99
10
12
14
16
Sample number
Control Charts
4.6 4.0 3.7 4.1 4.1 5.6 4.5 6.0 6.0 3.4 3.4 4.6 3.7 4.2 4.6 4.7 4.1 3.7 3.4 3.3 3.7 4.1 4.5 4.6 4.4 4.8 4.3 4.4 5.1 3.9
Quality Improvement: Problem Solving
3 4 5 6
7 4 4 7 7 4 3 7 9 6 0 1 5 6 2 6 7 1 1 5 6 4 8 3 4 6 1 0 0
Dot diagrams
Integrated Circuit Response Time (ps)
5
Plant A Plant B