You are on page 1of 31

Agenda

Week 6

Review Homework Problems Ch 3: 2, 4 Chapter 3: Problem Solving Desksides: 7 QC Tools Flow chart Run Chart Pareto Diagram Histogram Cause and Effect Diagram Check sheet Scatter diagram Control chart

Week 7 assignment Read chapter 4 Homework problems: Ch 3 11, 12, 23, 28(c)

Case Study: "How We Slashed Response Time"

Quality Improvement: Problem Solving

Seven Quality Tools


Chapter 3: Problem Solving

Quality Improvement: Problem Solving

Seven Quality Control Tools

Pareto Chart
Histogram

Process flow diagram Check sheet Scatter diagram Control chart Run Chart Cause and Effect Diagram
Quality Improvement: Problem Solving

Pareto Principle

Vilfredo Pareto (1848-1923) Italian economist

20% of the population has 80% of the wealth

Juran used the term vital few, trivial many. He noted that 20% of the quality problems caused 80% of the dollar loss.
7 Quality Tools
Quality Improvement: Problem Solving

Pareto chart
30
% Complaints

28

25 20 15 10 5 0
Loose Threads Stitching flaws Button problems Material flaws

16 12 12 6 4

7 Quality Tools
Quality Improvement: Problem Solving

70

(64)

Percent from each cause

Pareto Chart

60 50

40
30 20 (13) 10 0 (10) (6) (3) (2) (2)

Causes of poor quality


Quality Improvement: Problem Solving

Histogram
25 20
Frequency

15 10 5 0
1. 9 2. 9 3. 9 4. 9 5. 9 6. 9 7. 9 8. 9 9. 9 10 .9 11 .9 12 .9 13 .9 14 .9 15 .9 M or e

Category

7 Quality Tools
Quality Improvement: Problem Solving

Histogram
40 35 30 25 20 15 10 5 0

1 2

6 13 10 16 19 17 12 16 20 17 13

5 6 2

Quality Improvement: Problem Solving

Flowcharts

Flowcharts

Graphical description of how work is done. Used to describe processes that are to be improved.

7 Quality Tools
Quality Improvement: Problem Solving

Flow Diagrams
" Draw a flowchart for whatever you do. Until you do, you do not know what you are doing, you just have a job.
-- Dr. W. Edwards Deming.

Quality Improvement: Problem Solving

Flowchart
Activity

Decision

Yes

No
7 Quality Tools
Quality Improvement: Problem Solving

Flowchart

Quality Improvement: Problem Solving

Flow Diagrams

Quality Improvement: Problem Solving

Flow Diagrams

Quality Improvement: Problem Solving

Process Chart Symbols


Operations Inspection

Transportation
Delay Storage

Process Chart
Date: 9-30-00 Analyst: TLR Operation Transport Inspect Delay Storage Location: Graves Mountain Process: Apple Sauce Description of process Unload apples from truck Distance (feet) 100 ft 30 50 ft 360 20 ft 15 20 5 20 ft 30 480 190 ft Time (min) 20 Step 1 2 3 4 5 6 7 8 9 10 11 Page 1 0f 3

Move to inspection station


Weigh, inspect, sort Move to storage Wait until needed Move to peeler Apples peeled and cored Soak in water until needed Place in conveyor Move to mixing area Weigh, inspect, sort Total

Quality Improvement: Problem Solving

Quality Improvement: Problem Solving

Check Sheet
Shifts

Defect Type


7 Quality Tools

Quality Improvement: Problem Solving

Check Sheet
COMPONENTS REPLACED BY LAB TIME PERIOD: 22 Feb to 27 Feb 1998 REPAIR TECHNICIAN: Bob TV SET MODEL 1013

Integrated Circuits Capacitors Resistors Transformers Commands CRT

|||| |||| |||| |||| |||| |||| || || |||| |

Quality Improvement: Problem Solving

Cause-and-Effect Diagrams

Show the relationships between a problem and its possible causes. Developed by Kaoru Ishikawa (1953) Also known as

Fishbone diagrams Ishikawa diagrams

7 Quality Tools
Quality Improvement: Problem Solving

Cause and Effect Skeleton


Materials Procedures

Quality Problem

People

Equipment
7 Quality Tools
Quality Improvement: Problem Solving

Fishbone Diagram
Measurement
Faulty testing equipment Incorrect specifications Improper methods

Human

Machines
Out of adjustment Tooling problems Old / worn

Poor supervision Lack of concentration Inadequate training

Inaccurate temperature control Dust and Dirt

Quality Problem
Defective from vendor Not to specifications Materialhandling problems Poor process design Ineffective quality management Deficiencies in product design

Environment

Materials

Process

Quality Improvement: Problem Solving

Cause and effect diagrams

Advantages

making the diagram is educational in itself diagram demonstrates knowledge of problem solving team diagram results in active searches for causes diagram is a guide for data collection

Quality Improvement: Problem Solving

Cause and effect diagrams


To construct the skeleton, remember: For manufacturing - the 4 Ms
man,

method, machine, material policies, procedures, people

For service applications


equipment,

Quality Improvement: Problem Solving

Scatter Diagram

Quality Improvement: Problem Solving

Run Charts

Run Charts (time series plot)


Examine the behavior of a variable over time. Basis for Control Charts

Quality Improvement: Problem Solving

Control Chart
27 24 21

UCL = 23.35
c = 12.67

Number of defects

18 15 12

9
6 3 LCL = 1.99

10

12

14

16

Quality Improvement: Problem Solving

Sample number

Control Charts

Quality Improvement: Problem Solving

Stem and leaf displays


Data
Integrated Circuit Response Time (ps)

4.6 4.0 3.7 4.1 4.1 5.6 4.5 6.0 6.0 3.4 3.4 4.6 3.7 4.2 4.6 4.7 4.1 3.7 3.4 3.3 3.7 4.1 4.5 4.6 4.4 4.8 4.3 4.4 5.1 3.9
Quality Improvement: Problem Solving

Stem and leaf displays


Integrated Circuit Response Time (ps)

3 4 5 6

7 4 4 7 7 4 3 7 9 6 0 1 5 6 2 6 7 1 1 5 6 4 8 3 4 6 1 0 0

Quality Improvement: Problem Solving

Dot diagrams
Integrated Circuit Response Time (ps)

5
Plant A Plant B

Quality Improvement: Problem Solving

You might also like