Layout Framing for Wall02 V77Wall02

Use the Rotate tool to leave a copy of Then use the Move tool to place the wall
Wall01 on the ground for the next wall in position on the subfloor

SELECT
SELECT Wall01 and
Wall01 and CTRL CLICK
CLICK the with Move to
Rotate tool copy and place

Grouped
Framing
Grouped
Framing
Use the
Shift key to lock
the rotation plane
then CTRL CLICK
to set the
center HIDE the
copy of
Wall01

WALL02 Group the stringlines before placing the wall


Use the rectangle and line tools with the Move or the lines will attach to the framing members
tool and the CTRL key to move and copy and
modify the stringlines for Wall02. Snap the
framing components to the stringlines* UNHIDE
Wall01 and
Studs @ 16” OC place on the
stringlines
Top Plate

Header
End Stud

Corner Stud
Trimmer
Trimmer

End Stud
6'-10"

8’-0”

Rough
Opening

Bottom Plate

12” 6’-4” 3” RIGHT


CLICK to
Edit group
12’-0”

*Wall layouts are the responsibility of the


contractor and are done in the field
77