MAINTENANCE MANAGEMENT
BERKAITAN DENGAN CARA MENGELOLA AKTIVITAS PERAWATAN AT THE SHOP FLOOR DENGAN TUJUAN UNTUK MENCAPAI MAINTENANCE EXCELLENCE State of maintenance management and performance that applies leading edge policies, procedures, structures, methods and technologies to maintenance
Maintenance planning is the process by which the elements required to perform a task are determined in advance of the job start or the development of a detailed program to achieve an end (What, Who, How to do the maintenance job, For how long and for How Much ?)
Design modifications : are planned and scheduled and they depend on eliminating the cause of repeated breakdowns. Timely backlog relief : Backlog is all work available to be done. Backlog work has been approved, parts are either listed or bought and everything is ready to go
MAINTENANCE COORDINATION
Encompasses logistical efforts of assembling all necessary resources so the job is ready to be scheduled. This activity is conducted in harmony with Purchasing, Operations, Engineering, Maintenance, Store and management
MAINTENANCE SCHEDULING :
IS THE WRITTEN PROCESS WHERE LABOR RESOURCES AND SUPPORT EQUIPMENT ARE ALLOCATED TO SPECIFIC JOB AT A FIXED TIME (When to do the job)
MAINTENANCE EXECUTION :
The process where all planned job package are executed or done at the shop floor and this activity is under the responsibility of maintenance supervisor
WHY PLAN, COORDINATE AND SCHEDULE MAINTENANCE JOBS ? 1. 2. 3. 4. 5. 6. 7. 8. Jobs can be accomplished more efficiently At lower cost to execute Fewer disturbances of operations Higher quality process Improved morale with greater job satisfaction Increase longevity of equipment Reduce parts usage Planned job requires only half as much time to execute than unplanned job
JOB PREPARATION Maintenance management will achieve its best results when each mechanic or technician is given specific tasks to be completed in a definite time period (scheduling) in a specific manner (planning) The productivity of work is not the responsibility of the worker but of the manager (Peter Drucker)
PREREQUISITES
1. 2. 3. 4. 5. 6. ADANYA LEAD TIME YANG CUKUP STRUKTUR ORGANISASI YANG JELAS EFFECTIVE MANAGEMENT OF MATERIALS MISI DEPARTEMEN YANG JELAS ADANYA DUKUNGAN DARI ENGINEERING PERLU ADANYA MAINTENANCE TECHNICAL LIBRARY (MTL) YANG DILENGKAPI dng CMMS 7. ADANYA Strong and Serious TOP MANAGEMENT COMMITMENT AND SUPPORT