Krzysztof Piatek
AGH-University of Science & Technology
S 1 MVA u 7
S 1 MVA u 7
Power Quality
Power Quality
http://www.leonardo-energy.org
Problem
A converter drive is connected as in figure. The voltage change coefficient during the drive start shall be determined at PCC 1 and PCC 2. The converter drive data: - starting overload coefficient: - reactive power reduction due to the sequence control: kr =1.7 kVA/kW q = 0.8
110 kV
20 kV
PPC 2 S 5 MVA u 7
6 kV
PPC 1
S 1 MVA u 7
S 1 MVA u 7
Solution
The relative voltage change coefficient can be determined using the formula for the voltage drop across the power system components R, X, expressed in terms of the active and reactive power P, Q transmitted in the system U = PR + QX UN
where Qmax is the maximum reactive power, Ssc is the short-circuit capacity at the point for which the voltage change coefficient is calculated. In this formula the resistances of components are disregarded, what can lead to large error in low-voltage systems. The voltage change coefficient calculated this way is lower than that obtained from the accurate calculation. For the sake of simplicity all coefficients will be calculated from the parameters reflected to the 6kV side. The first step is to determine short-circuit capacities at all points by calculating the components impedances and subsequently the short-circuit capacity at the required point. The power system impedance Z SEE =1.1
2 UN 62 =1.1 = 247.5 m SSC 160
The Tr1 110/20 kV transformer impedance Z Tr1 = u% U 2 62 = 0.11 = 247 m 100 STr1 16 u% U 2 62 = 0.07 = 507 m 100 STr2 5
2 UN ZPPC1
The short-circuit capacity at PCC 1 we obtain from the formula SPPC1 =1.1
where ZPPC1 is the total impedance at PCC 1, i.e. ZPPC1 = Z SEE + Z Tr1 + Z Tr2 =1 thus, we obtain 62 = 39.6 MVA 1 Similarly, we calculate the impedance at PCC 2 SPPC1 =1.1 ZPPC2 = Z SEE + Z Tr1 = 0.494 and then the apparent power SPPC2 =1.1
2 UN 62 =1.1 = 80.2 MVA ZPPC2 0.494
The reactive power during start we calculate from the given coefficients and the rated drive power. Qmax = qkr PN =1.70.81450 =1972 kVAr Using the simplified formula we calculate the voltage change coefficient, for PCC 1 we obtain Q 1.972 K u, PPC1 1.1 max =1.1 = 0.059 , K u, PPC1 5.9% 39.6 SPPC1 whereas for PCC 2 we obtain K u, PPC2 1.1 Qmax 1.972 =1.1 = 0.027, K u, PPC2 2.7% 80.2 SPPC2
The obtained coefficients should be compared with its permissible levels. For example, if the planned number of starts is 20 per hour, the permissible level of the voltage change coefficient is 3%. According to this limit value, the voltage change is to large in PCC 1, therefore the drive must not be connected directly to the network. The above calculations suggest also the solution reactive power of the drive during start should be decreased in order to satisfy the limit value at PCC 1, or sensitive equipments should be feed from PCC 2, where the voltage change satisfy the limit.
This publication is subject to copyright and a disclaimer. Please refer to the Leonardo ENERGY website.