Professional Documents
Culture Documents
Livingston Holder
VP Space Systems
In-flight Target
Small Launch Vehicle Update
Release Conditions:
Air Launch SLV ~ 350,000 ft
~ 23,000 fps
Operationally
Responsive Spiral 2
Spacelift
Mass to 100 nmi circ due East
Gryphon
Spiral 1 S 100,000 lb
FALCON E
AC
th
wi
/LH
2
X 40,000 lb
LO
/LH 2
Gyrfalcon LOX
18,000 lb
LO X/RP
Peregrine
14,000 lb
1,400 lb
6,000 lb
GTOW
170K lb 500K lb 1.1M lb
Separation
Stage 2 and CAM Payload in orbit
Restart 6 7
Coast
SECO
5
Stage 2 burn
Stage 1 Disposal
Staging 4
Stage 1 burn
Jettison Fairing
PAV releases USA
3
PAV Ignition
2
PAV Flyback
Takeoff
1
CONUS
Reliant on Space
Communications and
Navigation Assets
CAV Entry
Separation Stage 2
5 CAV Entry
Boost Disposal
Separation
4 Ballistic
Separation Stage 1 ISR/BDA
3 Trajectory
Disposal
Ignition
2
Flyback Simple Forward
Basing
1 6
CONUS CONUS Target OCONUS Theater
CAV / ECAV Launches from CONUS Bases “In Theater” Operations from forward basing OCONUS
Airplane
Airplane ORS
ORS concepts
concepts maintain
maintain significant
significant inter-theater
inter-theater range
range
capability
capability in
in aa single-stage
single-stage configuration.
configuration.
Integration
Main
Main
Operations
Operations
Base
Base(MOB)
(MOB)
Military or Civil
PAV Maintenance Operations Center Communications
USSTRATCOM
USA/Payload
transport Satellite
delivery
PAV/USA Integration
PAV self-ferry
Launch CAV/ECAV
Forward
Forward delivery
Operations
Operations
Base
Base(FOB)
(FOB)
Mission Control Center Theater
Theater
of operations
of operations
Patrick AFB
• Easterly Satellite Operations
Elmendorf AFB
• ECAV Eastern Operations
Alternate ECAV Western Operations
Alternate SSO Satellite Operations
10
• Operational Responsiveness
– Horizontal processing and integration reduces
infrastructure Minimal Infrastructure
– Eliminates need for vehicle transporter system, launch
pad; existing runways will suffice Responsive
– System can be operated and maintained out of
interior CONUS locations
11