IS 10221 :2008
Voltage to be applied shall be as per holiday test equipment manufacturer’s recommendation
(standard practice is 5KV per mm if coating thickness)
* The tape is applied over the weld joints after the necessary
welding and testing of the joints are completed.
* The procedure for application of tape shall be same as bare
pipe procedure.
* Overlaps on each side of the weld joints of pipe ends
shall be 50 mm
IS 10221 :2008
9.0 In case of any conflict between this procedure and Contract Specification requirements, the later shall govern.
8.0 (Details)
8.1 During the storage and handling of the coated pipe determines the effectiveness of the coating, there is any discrepancy found that same should be rectified with standard procedure.
8.2 Coated pipes loading, unloading, handling, transportation and storage by using suitable means to avoid damage to the pipe and coating.
8.3 Coated pipes may be handled by means of slings of belts of proper width (minimum 60 mm) made of nonabrasive/non-metallic materials.
8.4 The pipes shall be stacked completely clear from the ground at least 300 mm so that bottom row of pipes remain free from any surface water.
8.5 The pipes shall be stacked at a slope so that draining rain does not collect inside the pipe.
8.6 The lorries used for transportation shall be equipped with adequate pipe supports having as many round hollow beds as there are pipes to be placed on the bottom of the lorry bed. Total width of supports shall beat least 5
percent of the pipe length and minimum 3 in number support shall be provided.