HOLIDAY DETECTION TEST REPORT

FOR PIPELINE

CLIENT: SAPURA / ENI


Project Name: Mizton Field Development Phase 1
Contract: 600205
Reference ISO 21809-3:2018 / ENI 20550 10"Ø OIL (PHASE 1) / GAS PHASE 2 P
Standard / Location or Reference (ORF TO BSR)
REV.2
Acceptanc
e Criteria: Instruments of measurement
Equipment Brand Model Serial
Holiday Detector PCWI DC30 8004

Voltage Verification Voltage (Out) Calibration (Adjust) Results

Coating inspecte
First time Acc Rej

Second time Acc Rej 3LPP (3mm)


Third time Acc Rej 3LPP+PP ( (8mm)
Fourth time Acc Rej 3LPP+PP ( (8mm)

Holiday Detection Test


No. Repair Test Results
Pipe No Pipe No
Holiday Acc Rej Acc / Rej
REMARKS:

Acc: Accepted Rej: Rejected HSS: Heat Shrink Sleeve 3LPP: 3 Layer Polypr

NACE-2 ARENDAL QC Inspector SapuraKencana


Format: F-CD-14

Rev. 0

Procedure: P-CD-10

Report No. HOL-01


Phase 1
Date: 13-MAR-2019
HASE 2 PIPELINE 1 of 1
Sheet:
O BSR)

Valid Calibration Date Certificate No.


11/29/2018 TW1-DET-180124

Sections of Pipeline Inspected

From To
nspected
Pipe Joint No Pipe Joint No
3mm)
( (8mm)
( (8mm)

No. Repair Test Results


e No
Holiday Acc Rej Acc / Rej
r Polypropylene

ENI Inspector