You are on page 1of 1

SUMMARY

OF
PT. CAKRAWALA SEJAHTERA SEJATI (CSS)
STEAM COAL
 

 Mining Pit (KP) : PT. Golden Great Borneo


 Location : Lahat, South Sumatra
 Area of Mining : Over 1.900 Ha
 Area Explored : 100 Ha
 Estimate Deposit : 50.000.000 MT in 100 Ha
 SIM : 3 : 1 (3 m coal to 1 m overburden), thickness 16 m
 Current Situation : 5 Ha are exploited, now excavating 2 pits
 Commence Production : About 8 (eight) months ago
 Production Capacity : 150.000 - 250.000 MT/month
 Hauling (mining to jetty) : 240 km
 Number of Trucks : 300 units
 Loading Port : Tanjung Api Api, South Sumatra
 Jetty : Two jetties with conveyor belt each 700
MT/hr capacity
 Shipping Vessel Terms : Loading rate 8.000 MT/day
 Price & Payment : To be adviced, by L/C at Sight from prime bank
 Terms of Contract : Trial shipment 30 days after
signing of contract & L/C opening whitchever is the
latest
         

No PARAMETER STANDARD GUARANTEED REJECTION


. SPECIFICATION
1 Total Moisture ARB 31 - 35% > 37%
2 Inherent Moisture ARB 10 – 15% > 17%
3 Fixed Carbon ADB By Difference
4 Volatile Matter ADB 38 – 45% > 45%
5 Ash Contents ADB 7% > 7%
6 Total Sulphur ADB 0,5% >1%
7 Gross Calorific Value ADB 5,800 < 5,500
8 Grindability Index 50-60 NA
9 Size 0 – 50mm (Crushed) 0-50 mm 90% NA
Above 50 mm 10%
 

You might also like