Professional Documents
Culture Documents
SUBMITTED BY:
MAYANK SHARMA
HARPREET SINGH
HIMANSHU
KARAN BHANDARI
MAHESH KUMAR
CONTENTS
1) TITLE
2) OBJECTIVE
3) STUDY PLAN
4) WORK ASSIGNMENT
5) SIGNIFICANCE
TITLE:
Hydroelectric Power Plant
OBJECTIVE:
To generate Electricity using Water Resource.
STUDY PLAN:
1. Design of the working Model.
2.All the team members on their allocated
tasks.
3.Connection of various sites (Construction
Area, Power Plant ,Reservoir) are completed.
WORK ASSIGNMENT:
Mayank Sharma :- Design and Allocating of
sides.
Harpreet Singh :- Electricity Consumption Area.
Himanshu :- Structure of Reservior.
Karan Bhandari :- Structure of Power Station.
Mahesh Kumar :- Electrical wiring of the Model.
SIGNIFICANCE:
1.