Project: Turner St. Parking Garage Contractor: Date: 9/17/11 Report Number: 4 Day: Su M T W Th F S
Contractor
Work Preformed There were three excavators on site removing the dirt. At that point it appeared that they were removing the land down to a level close to the road. There was also an excavator that had a jackhammer attachment. Temp: 73
Weather
Equipment at Site 2 Dump Trucks that may have been running in a cycle so there could have been more 2 Excavators 1 with a bucket removing the insitu land and dumping it in the trucks 1 with a jackhammer attachment that was working in a small area. 1 Buldozer