QUESTION:
a. Check the stability of structure against piping. Foundation materials are fine sand, coarse sand & sand + gravel.
b. Calculate the uplift pressure at the point of application and thickness of floor. Points are A, B, C, D, E, F, G, H, I, J & K.
64
Compiled By:
Solution:
We know that according to Blighs theory our structure will be safe against piping if,
SOIL
TYPE
BLIGHS
COEFFICIENT
C
ROLL
NO.
HEAD H
(
)
(m)
TOTAL
CREEP
LENGTH
'L'
(m)
FINE
SAND
15
38
0.38
11.42
0.03
0.07
SAFE
COARSE
SAND
12
38
0.38
11.42
0.03
0.08
SAFE
SAND +
GRAVEL
38
0.38
11.42
0.03
0.11
SAFE
65
Compiled By:
ROLL
NO.
LENGTH UP
TO THAT
POINT
TOTAL CREEP
LENGTH
(specific wt. of
water)
(tons/m3)
UPLIFT
PRESSURE
(specific
gravity
of
concrete)
(tons/m2)
(m)
38
0.00
11.42
0.38
2.24
0.38
0.20
38
2.50
11.42
0.30
2.24
0.30
0.15
38
2.98
11.42
0.28
2.24
0.28
0.15
38
3.45
11.42
0.27
2.24
0.27
0.14
38
3.93
11.42
0.25
2.24
0.25
0.13
38
4.35
11.42
0.24
2.24
0.24
0.12
38
4.77
11.42
0.22
2.24
0.22
0.11
38
5.40
11.42
0.20
2.24
0.20
0.10
38
5.91
11.42
0.18
2.24
0.18
0.10
38
6.42
11.42
0.17
2.24
0.17
0.09
38
11.42
11.42
0.00
2.24
0.00
0.00
66
Compiled By:
SOIL
TYPE
LANESS
COEFFICIENT
C
ROLL
NO.
HEAD H
(
)
(m)
TOTAL
CREEP
LENGTH
'L'
(m)
FINE
SAND
38
0.38
12.82
0.03
0.14
SAFE
COARSE
SAND
38
0.38
12.82
0.03
0.20
SAFE
SAND +
GRAVEL
38
0.38
12.82
0.03
0.25
SAFE
67
Compiled By:
LENGTH UP
TO THAT
POINT
TOTAL CREEP
LENGTH
(specific wt. of
water)
(tons/m3)
UPLIFT
PRESSURE
(specific
gravity
of
concrete)
(m)
(tons/m2)
38
0.00
12.82
0.38
2.24
0.38
0.20
38
2.50
12.82
0.31
2.24
0.31
0.16
38
3.21
12.82
0.28
2.24
0.28
0.15
38
3.93
12.82
0.26
2.24
0.26
0.14
38
4.40
12.82
0.25
2.24
0.25
0.13
38
5.03
12.82
0.23
2.24
0.23
0.12
38
5.67
12.82
0.21
2.24
0.21
0.11
38
6.30
12.82
0.19
2.24
0.19
0.10
38
7.06
12.82
0.17
2.24
0.17
0.09
38
7.82
12.82
0.15
2.24
0.15
0.08
38
12.82
12.82
0.00
2.24
0.00
0.00
68
Compiled By: