South Main Construction Co.

Weekly Construction Report

Project:: ASA Contractor: Skanska Date: 12/1/11 Report Number: 5 Day: Su M T W Th F S

Work Performed: The front of the building of the ASA building had little work being performed. Underneath a white tarp there was masonry being performed under the overhang. I could tell that their was interior work being performed as their were people walking in and out of the plywood doors with various tools. The only work that was visible was mudding going on inside. On the exterior at the back of the building there was a crew caulking the outside of the windows and another crew installing windows.

Weather
Temp: 36 Degrees F Wind: None Condition: Sunny Humidity: None

Subcontractors & Visitors


Fire Life and Safety GJH

Equipment at Site Scaffolding Boom Lift Fork Lift (4) Water truck Storage units Hydraulic Scaffold