CONSTRUCTION SITE DIARY DATE (MM/DD/YYYY)
Project Name: Weather at [Time am/pm]
Location: [Condition ofWeather]
Prepared By: [Temperature]
Project No. Reference No.:
Contractor : Weather at [Time am/pm]
Ground Conditions: (Dry, Wet, Frooze,Damp) [Condition ofWeather]
[Temperature]
SITE ATTENDACE No. of Men PROJECT STATUS
COMMENTS
SAFETY INSPECTION
COMMENTS Yes No Incident
/ Inadequte Weather Conditions
/ Noise Pollution
*The scaffold stability issue was / Equipment Malfunction
resolved quickly. SITE VISITORS
*Safety reminder meeting held Names Purpose
following an incident. visit the site to inspect the progress and ensure that
Owner the installation of glass doors and windows aligns
with their expectations and requirements.
Equipments on Job No. Units Record any changes or problems affecting the work:
WORK STOPPAGE
Glass Cutter 2 Requested by:
Glass Handling Equip. 1 Client – Ms. Alaine Tess Cabije
Power Drills Set 4 Approved by:
Project Manager – Engr. Nemey Gian D. Arnado
Scissor Lift 1
CHANGE ORDERS
Old Order New Order
Installation of Glass Windows for Reassessing of installment location
Ground Floor and redesigning of plans for second
floor with Client.
INSUFFICIENT MATERIALS/TOOLS
COMMENTS No. of Materials
Materials/Tools
On-Site Needed
Glass Cutter 2
• Meeting will be needed for Glass Handling Equip. 1
the discussion of new Power Drills Set 4
plans. Scissor Lift 1
• More manpower to catch up Measuring Tools 1 Set
delays.