SITE REPORT
JOB NO.: PM18/100263/VSN JOB DETAILS : COMMISIONING SERVICING REPAIRS
DATE : 2/12/2021 PROJECT/PRODUCT STATUS : WARRANTY OUTOFF WARRAN
ENGG.NAME : Vivek Kamble JOB STATUS : COMPLETE INCOMPLETE
CLIENT NAME ShreeNaina Container ADDRESS Goa
CONTACT NO. CONTACT PERSON Mr. KM Khanna, Mr Gobind Naik , Mr. Bannerje
P.O. / W.O NO. E MAIL
DEPARTURE DATE : ARRIVAL DATE : DEPARTURE:DATE :
(FROM H.O. TO SITE) TIME : (TO SITE) TIME : (SITE TO H.O.) TIME :
PROJECT DESCRIPTION : ARRIVAL: DATE :
Bottle Inspection machine (SITE TO H.O.) TIME :

EQUIPMENT / PRODUCT DETAILS

WORK DONE / SUMMARY ( see continuation sheet )

Tej Engg Mr Vivek Kamble visited site on 29th Jan 2021.

> Mechanical Mounting and electrical wiring has been done.


> Earlier there were two camera now the system has total four camera. Additional two camera are used to fullfill
additional requirement of the customer
> Each Camera captures image at every 90 degree of rotated bottle.
> 225ml pp amber was set and trials were taken on it and was run in production for observation.
> 225ml pet clear bottle was set and trials were taken and run in production. Defective samples were rejected
according to the threshold set and afterwhich 10 NG sample were passed and one was not getting rejected
due to the set threshold
> 225ml bottle was run in production on 10th Feb 2021 and around 100000 samples were run and 600 samples
were rejected as defetive samples.
> 150mlPET, 250mlPET,450mlPET, 225mlPET bottles samples were set in vision software and tested and
working fine.
> 450ml PET bottle trials were taken on 12th FEB 2021 and run on production.
1405 sample were run and 78 bottles were rejected in it. Defected samples were according to the threshold set
> Further more changes to decrease the rejection can cause the hair particle to pass in OK samples
> During trials 4 hair sample was passed in between 11 OK samples among which 3 were of eyebrows size
and was detected and rejected in bin in presnece of Mr.Gobind Naik.
> Afterwhich 2 samples of hair was passed in between the production 3 times and were rejected in presence of
Mr K M Khanna and Mr Gobind Naik
> The issue regarding few sample getting ejected but not landing on the rejected bin is due to the inconsistent
distance between two puck or the diameter of the holder of the puck. Timing for the rejection has been set
appropriately after observation. Two nozzle has been also provided on each side to reject and one nozzle
at the top to fly the sample in bin direction.

SITE CONDITION :
SYSTEM VOLTAGE : MAX. MIN. ROOM TEMPERATURE :
DUST : CONDUCTIVE NON CONDUCTIVE PANEL TEMPERATURE :
SEGGREGATION OF WIRE : DONE NOT DONE
CLIENT'S SIGNATURE : ENGINEER'S SIGNATURE :

FOR OFICE USE ONLY


H.O.D. SIGNATURE : BILLABLE NON BILLABLE
DATE IF BILLABLE :
COST CENTRE : INVOICE NO. DATED RAI
Continuation Sheet.. TEJ CONTROL SYSTEMS PVT. LT

WORK DONE / SUMMARY

CLIENT OBSERVATION & SUGGESTIONS :

Your feedback is important to us. Please give your objective feedback enabling us to serve your company better.
This will also help us to evaluate the concerned engineer's performance as well.

1. Did the engineer adhere to his time line ?

Always Mostly Sometimes Never

2. Did you find this engineer to be competent enough to complete his job properly ?

Highly Competent Competent Moderate Low

3. Was his behavior professional during the entire project ?

Very Professional Adequate Not Always Low in professionalism

4. Can he be recommended for our best commissioning projects ?

Very Sure Sure Not So Sure Not as Yet

ACTION TO BE TAKEN :
SRNO. ACTION BY WHOM BY WHEN

CLIENT'S SIGNATURE : ENGINEER'S SIGNATURE :


SITE REPORT

JOB NO.: PM18/100263/VSN JOB DETAILS : COMMISIONING SERVICING REPAIRS


DATE : 2/12/2021 PROJECT/PRODUCT STATUS : WARRANTY OUTOFF WARRAN
ENGG.NAME : Mr Vivek Kamble JOB STATUS : COMPLETE INCOMPLETE
CLIENT NAME Shree Naina Container ADDRESS Goa
CONTACT NO. CONTACT PERSON Mr. KM Khanna, Mr Gobind Naik , Mr. Bannerje
P.O. / W.O NO. E MAIL
DEPARTURE DATE :29/01/21 ARRIVAL DATE : 1/29/2021 DEPARTURE:DATE :
(FROM H.O. TO SITE) TIME 03:00am (TO SITE) TIME : 09:00am (SITE TO H.O.) TIME :
PROJECT DESCRIPTION : ARRIVAL: DATE :
Bottle Inspection Machine (SITE TO H.O.) TIME :

SR. NO. DATE IN TIME OUT TIME CLIENT'S SIGNATURE REMARK

1 1/29/2021 9:00 21:30


2 1/30/2021 9:00:00 AM 22:30
3 1/31/2021 9:00:00 AM 21:30
4 2/1/2021 9:00:00 AM 21:30
5 2/2/2021 10:00 22:30
6 2/3/2021 10:00 23:00
7 2/4/2021 10:00 23:00
8 2/5/2021 9:00:00 AM 22:30
9 2/6/2021 9:00:00 AM 23:00
10 2/7/2021 9:00:00 AM 22:30
11 2/8/2021 10:00 23:00
12 2/9/2021 10:00 21:30
13 2/10/2021 10:00 22:30
14 2/11/2021 9:00:00 AM 01:00(12-02-21)
15 2/12/2021 10:00 21:30
16 2/13/2021 10:00 14:00

CLIENT'S SIGNATURE : ENGINEER'S SIGNATURE :


EM HOUSE
Distributor
control.com

REPAIRS
TOFF WARRANTY
COMPLETE

, Mr. Bannerjee

ILLABLE
RAISED.
PTO.....
TEMS PVT. LTD.

BY WHEN
REPAIRS
TOFF WARRANTY
COMPLETE

, Mr. Bannerjee

2/13/2021
14:00
2/13/2021

REMARK