You are on page 1of 1

SAIGON EAST-WEST HIGHWAY CONSTRUCTION PROJECT

PACIFIC CONSULTANTS INTERNATIONAL

IN ASSOCIATION WITH

ORIENTAL CONSULTANTS CO. LTD., TRANSPORT ENGINEERING DESIGN INCORPORATION


ENVIRONMENTAL TECHNOLOGY COMPANY LTD., ASIA PACIFIC ENGINEERING CONSULTANTS
PCI Registered Address in Japan: PCI Representative office in Hanoi: Project Office in Ho Chi Minh:
7-5, Sekido 1 Chome, Tama-Shi, Tokyo Unit 302, 3rd F, Giang Vo Lake View Bldg., D10 9th Floor-Phoenix Building, 13-13Bis Ky
Japan . Tel.+81-42-372-0111 Fax. +81-42- Giang Vo, Ba Dinh District, Hanoi. Dong Street, District 3, Ho Chi Minh City
372-6030 Tel. +84-4-772-2713~4 Fax. +84-4-772-2711 Tel. 84-8-5260722~24 Fax +84-8-5260725

SITE INSTRUCTION
HÖÔÙNG DAÃN TAÏI COÂNG TRÖÔØNG
Date / Ngaøy: 22 February 2006 No./ Số: 31

To / Kính göûi: Obayashi Corporation


C/c / Ñoàng kính
göûi: PCI( Mr Fukushima; Mr Hai)
Site /Coâng tröôøng: Thu Thiem Batching Plant
Subject / Chuû ñeà: Quality Control for Concrete
Pursuant to Clause7.1, we will instruct as follows:
Theo Khoaûn 1 – chuùng toâi höôùng daãn nhö sau:
1) When concrete was discharged from agitator truck for Diaphragm wall, the lump of the cement was
sometimes found. The diameter of the cement lump is from approximately 5cm to 30cm.This is the
phenomenon, which was often seen from the beginning of the D-wall construction. Though Engineer has
issued verbal instruction many times the above phenomenon has not improved at all. You are requested
to submit the investigation of the above phenomenon and countermeasure.
2) Sieved fine aggregate and un-sieved fine aggregate should be kept separately, however there is no
partition to separate at fine aggregate stock bin. Contractor should make a proper separation to avoid
mixing of both fine aggregate. Contractor also should provide enough capacity of the sieving machine to
avoid un-sieved fine aggregate using
3) Quarry sand should be mixed or spray water before using to prevent becoming lump that is probably a
part of the cause of the cement lump.
4) The variation of the compressive strength at 28days is very big for P79b. Some cylinders have not
satisfied specification’s requirements. You are requested to submit the reason and countermeasure of it.

Received / Nhaän bôûi Issued / Phaùt haønh bôûi


The Contractor The Engineer
Nhaø thaàu Tö vaán
Signed / Site Engineer Inspector / Engineer Senior Engineer
Kyù bôûi Kyõ sö coâng tröôøng Giaùm saùt / Kyõ sö Kyõ sö chính

S.NAGANO