1. SCOPE
2. FIELD OF APPLICATION
3. REFERENCES
4. MATERIALS
4.2 Water
5. TOOLS/EQUIPMENTS
5.2 Trowel
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 3 of 5
J&P–AVAX S.A. J.V.
5.3 Paintbrush
6. RESPONSIBILITIES ON SITE
6.2 The Site Engineer shall raise the necessary Request for
Inspection (RFI) for surface preparation and cosmetic repair
mortar application activity. All other intermediate activities shall be
under surveillance point.
6.3 The Site Engineer shall be responsible for the quality aspect of
the work and compliance with this Method Statement and Project
Specifications.
7. WORK PROCEDURE
7.2 Mixing
F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 4 of 5
J&P–AVAX S.A. J.V.
7.3 Application
7.4 Curing
8. SAFETY PROCEDURES
8.1 The Site Engineer shall physically inspect the working area to
confirm that it is cleared of any hazard and/or obstructions that
may hinder safe access or proper execution of the work.
8.2 The Site Engineer shall ensure that all personnel engaged in
cosmetic repair works and related activities are wearing the
F-P.810/1-0