You are on page 1of 5

J&P Document number:

M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 1 of 5
J&P–AVAX S.A. J.V.

Document Title:

METHOD STATEMENT
COSMETIC REPAIR OF RAMP RETAINING WALLS

Issue Date : 08-02-2006

Revision Date: 08-02-2006 Revision No. : 0

Issued By : QA/QC Engineer:

Approved By : Deputy Project Manager:

Approved By : Senior Project Manager:

F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 2 of 5
J&P–AVAX S.A. J.V.

1. SCOPE

The scope of this procedure covers the activities involved in the


cosmetic repair of uneven surfaces of ramp retaining walls to ensure that
the works and materials conform to the requirements of Contract IFC
Drawings, approved Shop Drawings and Project Specifications.

2. FIELD OF APPLICATION

2.1 Exposed concrete surfaces of Underground Car Park ramp


retaining walls that will be painted.

3. REFERENCES

3.1 Project Specifications


Division 3 Section 03300

3.2 Qatar Construction Specifications (QCS) 2002


Section 26 Parts 1, 2 & 3

3.3 Bill of Quantities (Underground Car Park)


Page 4/9/1 Item C

3.4 Drawing No. A-1B1 Rev. 4 (Underground Car Park)


Basement Plan

4. MATERIALS

4.1 EMACO® R307


Single Component Polymer Modified Fairing Coat; Cosmetic
Mortar for Concrete Surfaces
Supplier: degussa
Material Submittal No. CP300(a)-MS-BOTH-03-162
* Product Data Sheet& Product Literature attached.

4.2 Water

4.3 Plastic Sheet

5. TOOLS/EQUIPMENTS

5.1 Forced-action Mixer/Drill & Paddle

5.2 Trowel

F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 3 of 5
J&P–AVAX S.A. J.V.

5.3 Paintbrush
6. RESPONSIBILITIES ON SITE

6.1 Cosmetic repair works of the uneven surfaces of Underground


Car Park ramp retaining walls and related activities shall be
undertaken by a dedicated group headed by a Foreman under the
over-all supervision of a Site Engineer.

6.2 The Site Engineer shall raise the necessary Request for
Inspection (RFI) for surface preparation and cosmetic repair
mortar application activity. All other intermediate activities shall be
under surveillance point.

6.3 The Site Engineer shall be responsible for the quality aspect of
the work and compliance with this Method Statement and Project
Specifications.

6.4 Health, Safety and Environmental issues are addressed in


accordance with the approved HSE Plan (Document Submittal
No. CP 300(a)- DS-BOTH-01 /008) under the supervision of the
Site Engineer.

7. WORK PROCEDURE

This Method Statement shall be applied in conjunction with the Method


Statement on Painting Exterior Cement Plastered/Concrete Surfaces
(Document Submittal No. CP300(a)-DS-UCP-09-236; Code B).

Prior to application of primer paint, all uneven surfaces of ramps


retaining wall that will be painted shall receive a fairing coat of EMACO ®
R307.

7.1 Surface Preparation

The concrete surface shall be ensured sound, clean and


uncontaminated. All loose powdering material must be removed.

Prior to application of EMACO® R307, the surface shall be


thoroughly soaked, leaving a saturated but surface dry condition.

7.2 Mixing

Manufacturer recommends that full bags mixing be done in a


forced action mixer or alternatively using a slow speed, hand held

F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 4 of 5
J&P–AVAX S.A. J.V.

electric mixer with suitable paddle.

When using full bags, add 3 to 4 litres of water to the container


then start mixing. EMACO® R307 powder shall be added while
mixing.

Add water as required to achieve the desired consistency. Mixes


for deep void filling shall have lesser water added to produce a
trowellable putty like mortar, while fairing coat/cosmetic mix shall
have more. No more than 7.5 litres of water shall be added per 20
kg. of EMACO® R307.

7.3 Application

Deeper voids shall be filled first prior to application of the


cosmetic coating.

Apply EMACO® R307 cosmetic coat to the uneven surfaces to be


painted with a minimum of trowelling.

Leave for a short period before final trowellling. Finishing may be


aided by flicking a small amount of water onto the surface using a
paintbrush before final trowelling.

7.4 Curing

Although EMACO® R307 is specially formulated to prevent


shrinkage and cracking, good curing practice is essential
particularly in hot and windy conditions by securely covering the
cosmetically repaired surface with plastic sheet.

Painting work activity as detailed under Method Statement on Painting


Exterior Cement Plastered/Concrete Surfaces (Document Submittal No.
CP300(a)-DS-UCP-09-236; Code B) shall commence after the fairing
coat has sufficiently cured.

8. SAFETY PROCEDURES

8.1 The Site Engineer shall physically inspect the working area to
confirm that it is cleared of any hazard and/or obstructions that
may hinder safe access or proper execution of the work.

8.2 The Site Engineer shall ensure that all personnel engaged in
cosmetic repair works and related activities are wearing the

F-P.810/1-0
J&P Document number:
M ET H O D CP 300(a)-QCP-050
S T AT E M E N T
J&P (O) Ltd. /
Page: 5 of 5
J&P–AVAX S.A. J.V.

required Personal Protective Equipments (PPE).

8.3 Health, Safety and Environmental issues shall be addressed in


accordance with the approved HSE Plan (Document Submittal
No. CP 300(a)- DS-BOTH-01 /008).
8.4 Additional precautions shall be implemented in accordance with
product Material Safety Data Sheets.

9. REVISIONS

Rev. 0 Date: 08-Feb-06

F-P.810/1-0