NAM CON SON 2 GAS PIPELINE PROJECT

EPC PIPELINES & FACILITIES PACKAGE (EPC3)

Approved by
Deputy General Director
“VIETSOVPETRO”

Signed by: Trần Xuân Hoàng


Date: 05/03/2021 14:55:12
Certified by: Vietsovpetro
Certification Authority

TRAN XUAN HOANG


______ / _____/2021

TECHNICAL REQUIREMENT
FOR ICCP POWER CABLES

ISSUED FOR BID


DATE :
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

Agreed by:

Director of Offshore Construction Signed by: Đặng Đức Phong


Date: 05/03/2021 13:55:07
Certified by: Vietsovpetro Dang Duc Phong
Division Certification Authority

Project Director Signed by: Lê Quốc Anh


Date: 05/03/2021 13:30:34
Le Quoc Anh
Certified by: Vietsovpetro
Certification Authority

Checked by OCD:

Deputy of Project Director Signed by: Nguyễn Mạnh Hùng


Date: 05/03/2021 08:56:42
Nguyen Manh Hung
Certified by: Vietsovpetro
Certification Authority

Prepared by OCD:

Signed by: Nguyễn Văn Sâm


Engineer of PMD Date: 04/03/2021 16:39:05 Nguyen Van Sam
Certified by: Vietsovpetro
Certification Authority

Engineer of PMD Signed by: Nguyễn Thanh Tùng


Date: 04/03/2021 16:06:38
Nguyen Thanh Tung
Certified by: Vietsovpetro
Certification Authority
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

TABLE OF CONTENTS

1. SCOPE OF SUPPLY ............................................................................................... 4

2. TECHNICAL REQUIREMENT .............................................................................4

3. YEAR OF MANUFACTURE .................................................................................4

4. DELIVERY TERM & TIME ..................................................................................5

5. RECOMMENDED COUNTRY OF ORIGIN ........................................................5

6. WARRANTY ..........................................................................................................5

7. CERTIFICATION ...................................................................................................5

8. DOCUMENT REQUIREMENT .............................................................................6

9. TECHNICAL DOCUMENTS:................................................................................6
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

1. SCOPE OF SUPPLY
The bidder’s scope of supply must quote enough quantity for each items as below
(hereinafter referred to as “Goods”):
NO DESCRIPTION UNIT Q.TY
ICCP POWER CABLE
The low voltage power cable 600/1000V
Cu/XLPE/PVC (IEC-60228, IEC-60332-1)
1. m 6498
Size: 1C x 35 mm2
Refer to Datasheet no. “NCS2-NAG-DD-2-00-05-
SP-002_ Specification for Electrical Cable-Onshore
Pipeline” for more detail requirements.

2. TECHNICAL REQUIREMENT

All GOODs shall be complied with all Technical Documents listed in Appendix 1
of this technical requirement.
All document and drawing in the Appendix 1 is preliminary engineering design.
All detail engineering design document and drawing for Instrument and
Communication Equipment Package is VENDOR’s scope
In the event of any conflict between this Technical Requirement, Specification,
Datasheet, drawings and other documents, the order of the precedence of the documents
is as follows:

- Mandatory Laws, Standards and Regulation of Vietnam.


- Scope of supply on ITB (Invitation to Bid)
- This Technical requirement
- Specifications.
- Other documents in Appendix 1.
- International Code and Standards.

3. YEAR OF MANUFACTURE

Goods must be brand new, unused and manufactured in 2018 year or later.
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

4. DELIVERY TERM & TIME

All GOODS shall be delivered at VSP Site, No.67, 30/4 Road, Thang Nhat Ward,
Vung Tau City, S.R Viet Nam.
Delivery time of GOODs, including vendor data review, packing/handling,
shipping, transportation, delivery,…time shall be not later than 03 weeks after issue
of Letter of Intent (LOI).
Note: Contractor has to follow Vietsovpetro’s HSE policy when delivery goods to
Vietsovpetro site.

5. RECOMMENDED COUNTRY OF ORIGIN


The country of origin shall be as below:

Description Recommended Country of Origin


EU/G7/ KALRE TURKEY/Australia /
ICCP Power cables
Thailand/ Korea/ Singapore/ Vietnam
6. WARRANTY
All of the goods shall be furnished with Warranty Certificate for thirty (30) months
from the delivery time.

7. CERTIFICATION

All relevant certificates must be confirmed or committed to provide and to be


submitted before delivery, but not limited to the following:
 Certificate of Origin issued by the Commerce Department of Manufacturer’s
country or exporter’s country: Original or Certified copy by Manufacturer.
 Certificate of quality, quantity issued by Manufacturer: Original or Certified
copy by Manufacturer.
 Test report or Certificate issued by manufacturer: Original or Certified copy
by Manufacturer.
 Type Approval Certificate issued by third party: Original or Certified copy by
Manufacturer.
 Warranty Certificate issued by Bidder: Original
NAM CON SON 2 GAS PIPELINE PROJECT
EPC PIPELINES & FACILITIES PACKAGE (EPC3)
TECHNICAL REQUIREMENT FOR
ICCP POWER CABLES

8. DOCUMENT REQUIREMENT

BIDDER is requested to submit a complete of Technical Documentations as a part


of its bid document and the minimum requirements as below:
 Scope of supply with detailed model or part number, manufacturer, Origin and
quantity (No information or any information such as “or equal”, “or
equivalent” is not acceptable).
 Equipment Catalog with highlight specification, model, part number
 Equipment General Arrangement drawing (dimension of equipment)
 Type Approval Certificate issued by third party (Sample)
NOTE:
All documents and drawings in tender proposal shall be provided with: one (1)
original and three (03) copies and one (1) set of electronic copies on USB/CD/DVD.
Vendor also shall be full responsibility to submit Vendor data register list (VDRL)
and Vendor Data as required in section in “Documentation” of project documents for
Company review after LOI.
All final documents shall be provided with: one (01) original and three (03) copies
and one (01) set of electronic copies on USB/CD/DVD.

9. TECHNICAL DOCUMENTS:

The electrical cables and material shall be in compliance with documents as below:
No. Document No. Document title REV.
Specification for Electrical Cable-
1 NCS2-NAG-DD-2-00-05-SP-002 AC
Onshore Pipeline
NOTE: All documents and drawings in Appendix 1 can be updated during bidding
stage.