PROJECTNAME

INSPECTOR'S WEEKLY REPORT


CLIENT
Date: To:
Consultant:
CONSULTANT'S NAME
Contract Package:
Contractor: CONTRACTORS NAME
Road Name:
1. Description & Location of Work Done
S. No. Item Location Progress Remark
1 Survey & Alignment
2 Site Clearing
3 Embankment
4 Sub-grade
5 Granular Sub-base
6 Base Course
7 U-drain Constructed
8 Pipe Culvert Constructed
9 Concreting for Box Culvert
10 Prime Seal
11 Other
2. Activities of the Consultant

Supervision & Survey Work


1 Bridge/Road
Review of highway Design and
2 issue of working design
Review of Bridge and CD work
Design and issue of drawings
3
Approval of Borrow Area &
4 Natural Sources
5 Material Testing
6 Testing of Completed Works
7 Checking of measurement
3. Problems & Recommended Solutions

Reviewed by Resident Engineer Reported by

Resident Engineer Date Supervisor


DAILY PROGRESS REPORT
PROJECT NAME
ROAD:
WEATHER: Rainy/Clear [ Rain - From: Hrs, To: Hrs ] Date
Start Time of Work: Work closed:
HOURS OF NO. OF
S/N ACTIVITY CHAINAGE RESOURCES APPROX. QTY
WORK TRIPS

Remarks of site Supervisor (Use Back if Necessary)

STOPPAGE OF WORK: FROM Hrs TO Hrs


Summary of Daily Progress Report
Total Haulage ROAD SECTIONS ROAD SECTIONS
Date No. of Haulage No. of Haulage No. of Haulage Remarks
Trucks Trucks Trucks
Trips Qty Trips Qty Trips Qty
01.01.11
02.01.11
02.01.11
03.01.11
04.01.11
05.01.11
06.01.11
07.01.11
08.01.11
09.01.11
10.01.11
11.01.11
12.01.11
13.01.11
14.01.11
15.01.11
16.01.11
17.01.11
18.01.11
19.01.11
20.01.11
21.01.11
22.01.11
23.01.11
24.01.11
25.01.11
26.01.11
27.01.11
28.01.11
29.01.11
30.01.11
31.01.11

Total

Average
Trips/day/veh
Truck Dozer Excavator Grader Roller Water Truck Loader Backhoe
Date
Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road

01.01.11

02.01.11

02.01.11

03.01.11

04.01.11

05.01.11

06.01.11

07.01.11

08.01.11

09.01.11

10.01.11

11.01.11

12.01.11

13.01.11

14.01.11

15.01.11

16.01.11

17.01.11

18.01.11

19.01.11

20.01.11

21.01.11

22.01.11

23.01.11

24.01.11

25.01.11

26.01.11

27.01.11

28.01.11

29.01.11

30.01.11

31.01.11

Total
SUMMARY OF DAILY SCHEDULE

NAME OF PROJECT:
SECTION: CONTRACTOR:
Ref. No. Date:
WORK ITEM LOCATION DETAIL OF WORKS REMARKS & INSPECTION

ISSUED BY THE CONTRACTOR RECEIVED BY RE


Name: Name:
Signature: Signature:
Date: Date:
Summary of Daily Progress
Location Location Length Width Height Embankment Subgrade Sub Base
Date Remarks
From To (m) (m) (m) Qty (cum) Qty (cum) Qty (cum)
01.01.11
02.01.11
02.01.11
03.01.11
04.01.11
05.01.11
06.01.11
07.01.11
08.01.11
09.01.11
10.01.11
11.01.11
12.01.11
13.01.11
14.01.11
15.01.11
16.01.11
17.01.11
18.01.11
19.01.11
20.01.11
21.01.11
22.01.11
23.01.11
24.01.11
25.01.11
26.01.11
27.01.11
28.01.11
29.01.11
30.01.11
31.01.11
DOC. NO.
DAILY LABORATORY TESTING REV. NO.
PROGRAMME DATE OF REV.
PAGE
Project
Client
Engineer
Contractor
DATE:
S.NO DESCRIPTION REMARKS

Prepared by verified by consul rep checked by con ME approved by consul ME


PROJECT NAME

REQUEST DETAILS CHECK LIST FOR CONCRETE


1 GROUND PREPARATION/SAFETY ARRANGEMENTS
DETAILS OF PROPOSED POUR 2 LEVELS
Kicker Level
ELEMENT Top of Drain Level
Alignment
CONCRETE CLASS 3 FORMWORK
Formwork joints
LOCATION Formwork release oil
Access / walkway for pouring concrete
DATE AND TIME READY FOR INSPECTION Construction joint preparation
Chamfer at Edges
INTENDED DATE AND TIME FOR CONCRETE 4 REINFORCEMENT BARS
Cover ( spacer blocks )
(CONTRACTOR'S NAME). Confirms that the foregoing elements
are ready for inspection as indicated Bar Size
by our supervisor
Spacing

Signed on behalf of Contractor:……………………………………………………………. Lapping

Date:…………………………………………….. Steel approved


Bar bending and Cutting Satisfactory

5 MATERIALS: SAND AGGREGATE CEMENT


The Consultant confirm the above works have been inspected and advise as follows: Quantity
Condition
Concrete placement may proceed as scheduled Tested
Materials approved
6 EQUIPMENT/TOOLS Condition Quantity
Preparation not acceptable re-inspection required when ready Concrete Mixer
Vibrator
Concrete Moulds
Work may proceed only when the following items have been attended to Slump Cone
Tamping Rod
1. ………………………………………………………………...…………… 7 CURING ARRANGEMENT

2. ……………………………………………………………...………………

3. ………………………………………………………………...……………

Signed for Consultant: ……………...………………….. Date: ……………………


QUALITY ASSURANCE MANUAL CONTRACT NAME

Request For Approval/Acceptance of Works Annex 3

Contract Name Road:

Contractor: FIRST SKY LTD. No.:

Chainage:

BOQ Item:

Activity Description

Layer:

Received by: ……………………………………………..…. Requested by: ……………………………………


Name & Signature Name & Signature

Date/Time Received: Date/Time for inspection:

Visual Inspection/Observation by Works Supervisor

……………………………………………………….
Signed by Works Supervisor

Quality Control Tests Level Check (Final Layers)

Result
a) MDD (Ref. Sample) - a) Longitudinal -
b) Field Density - b) Transverse -
c) % Compaction - c) Camber/Crossfall -
d) Gradation -
e) Thickness of Layer -
f) Width of Layer -

Signed: (ME) …………………..……. Signed: (Surveyor) ……………………….

Approved/Not Approved

Resident Engineer: ………………………………….. Date: ………………………………………