Professional Documents
Culture Documents
Total
Average
Trips/day/veh
Truck Dozer Excavator Grader Roller Water Truck Loader Backhoe
Date
Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road Available On Road Off Road
01.01.11
02.01.11
02.01.11
03.01.11
04.01.11
05.01.11
06.01.11
07.01.11
08.01.11
09.01.11
10.01.11
11.01.11
12.01.11
13.01.11
14.01.11
15.01.11
16.01.11
17.01.11
18.01.11
19.01.11
20.01.11
21.01.11
22.01.11
23.01.11
24.01.11
25.01.11
26.01.11
27.01.11
28.01.11
29.01.11
30.01.11
31.01.11
Total
SUMMARY OF DAILY SCHEDULE
NAME OF PROJECT:
SECTION: CONTRACTOR:
Ref. No. Date:
WORK ITEM LOCATION DETAIL OF WORKS REMARKS & INSPECTION
2. ……………………………………………………………...………………
3. ………………………………………………………………...……………
Chainage:
BOQ Item:
Activity Description
Layer:
……………………………………………………….
Signed by Works Supervisor
Result
a) MDD (Ref. Sample) - a) Longitudinal -
b) Field Density - b) Transverse -
c) % Compaction - c) Camber/Crossfall -
d) Gradation -
e) Thickness of Layer -
f) Width of Layer -
Approved/Not Approved