2ENDROOF Field Inspection sheet Doc No:

(Brick/Masonry E/QAQC/FIS/232
Walling) Date Rev Rev Date
24/10/2020 00 00

Project name; ____________________________ Client; _________________________

Location: ______________________________________ Date; _____________________________

ATTRIBUTE YES NO N/A

1. Correct setting out and positioning of walls.

2. Correct mortar mixing ration and homogeneity.


3. Laying of approved DPC before the first course of block/brick.

4. Correct placement of hoop iron at specified alternative course.


5. Correct infill mortar joints i.e. 25mm thick.

6. Correct stone bonding as specified for block/brick work.ie. English bond, Flemish bond
etc.
7. Wall plumpness and horizontal alignment.

8. Overall height attained as specified.


9. Correct and approved Block/brick used as specified.ie. Size, strength etc

10. General neatness of the whole work.

11. Working areas kept clean after work.


12. Confirm curing of the structure ton be done for not below 14 days.

Corrective Remarks

Responsible Individual Sign Date


Project manager
QCO
Site supervisor.