INSPECTION CHECKLIST

CONCRETE SCREED PLACEMENT


Name of Project: Contractor:
RIYADH METRO PROJECT PACKAGE 3 FAST - CJV
Item Description: Area/Unit:

Reference Drawing No.: Rev. ITP No.: Activity No.:


No.:

Scheduled Inspection Date & Time: RAMPED Inspection Contractor Inspection Level: IR No:
Level:

Item
No. ACCEPTANCE CRITERIA REFERENCE ACCEPT REJECT N/A

1 Surface Preparation Inspection

Examine substrates (Damproofing / Waterproofing) for conditions


affecting performance of screed. Proj. Spec.
1.1 Section 03544,
Proceed with application only after unsatisfactory conditions have been Part 3.1.A
corrected.

Verify that base slabs meet finish and surface profile requirements in Proj. Spec.
1.2 Division 3 Section"Cast-in-Place Concrete."
Section 03544,
Part 3.1.B

2 Material Receiving Inspection

Concrete Screed shall be accepted if the temperature is below 32 °C. Proj. Spec.
2.1 Concrete Screed temperature that exceeds 32 C shall be rejected. Section 03300,
Actual Screed Temperature: ___________ °C. (Max. 32 °C). Part 3.9.H.1

Concrete Screed Slump shall be accepted if as per approved Mix


Design 220±040mm only. Approved Mix
2.2
Design
Actual Slump: ___________mm.

3 Installation Inspection
Clearance prior to proceed placing of concrete screed:
1. Verify the IRs of Damproofing for non-wet áreas (If Reqired)
and Waterproofing for wet areas only, if it is accepted &
3.1 approved by FAST/RAMPED. SOP
2. Discipline clearance form shall be signed by Site Engr. to
ensure taht the embedded items are complete and that
required inspections have been performed.
Check Installed Angle bars (Galvanized / Polycarbonate) and filler
3.2 SOP
boards including block-out if as per Approved Shop drawings.

Survey for concrete screed top elevations has been conducted and
3.3 SOP
Reports was accepted by Fast/Ramped.

Place screed continuously in a single layer, tamping and consolidating Proj. Spec.
3.4 to achieve tight contact with bonding surface. Do not permit cold joints Section 03544,
or seams to develop within pour strip. Part 3.3.D

Proj. Spec.
3.5 Screed surface with a straightedge and strike off to correct elevations. Section 03544,
Part 3.3.D.1
Proj. Spec.
3.6 Slope surfaces uniformly where indicated. Section 03544,
Part 3.3.D.2

M3-, AA Page 1
INSPECTION CHECKLIST

CONCRETE SCREED PLACEMENT

Item
No. ACCEPTANCE CRITERIA REFERENCE ACCEPT REJECT N/A

Proj. Spec.
Begin initial floating using bull floats to form a uniform and open-
3.7 Section 03544,
textured surface plane free of humps or hollows. Part 3.3.D.3

Finishing: Consolidate surface with hand float as soon as screed can Proj. Spec.
support equipment and operator. Re-straighten, cut down high spots, Section 03544,
3.7
and fill low spots. Repeat float passes and re-straightening until surface
is left with a uniform, smooth, granular texture. Part 3.3.E

Hard Trowel Finish: After floating surface, apply first trowel finish and
Proj. Spec.
consolidates screed by power-driven trowel so no blisters develop.
3.8 Section 03544,
Continue troweling passes and re-straighten until surface is smooth and Part 3.3.E.1
uniform in texture.

Finish and measure surface so gap at any point between screed


Proj. Spec.
surface and an unleveled freestanding 3-m- long straightedge, resting
3.9 Section 03544,
on two high spots and placed anywhere on the surface, does not Part 3.3.B
exceed 6.4 mm.

Moisture Curing: Keep surfaces continuously moist for not less than
Proj. Spec.
seven days with water or absorptive cover, water saturated and kept
3.10 Section 03544,
continuously wet. Cover screed surfaces and edges with 300-mmlap Part 3.4.B.1
over adjacent absorptive covers.

4 Final Inspection

Compressive Strength (28 Days) Test Reports as per requirement of Proj. Spec.
4.1 ASTM C 109 / C 109M. (C20, 10mm Agg.) Section 03532
Part 3.11 B.1
Actual Comp. Strength: __________Mpa

Compressive Strength (28 Days) Test Reports as per requirement of Proj. Spec.
4.2 ASTM C 109 / C 109M. (C20, 5mm Agg.) Section 03532
Part 3.7 A
Actual Comp. Strength: __________Mpa

REMARKS:

REFERENCE DOCUMENTS:

SUB-CONTRACTOR QA/QC/SITE RAMPED QA/QC


FAST QA/QC
ENGINEER

NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE:

M3-, AA Page 2