You are on page 1of 1

REQUESTFORINSPECTION(RFI)LOGSHEET,SGCPProject

FAHHAD SALEH GENERAL CONTRACTING COMPANY (FCC) / SAUDIARABIANSAIPEMCO.LTD.

SouthGasCompressionPlant(SGCP)PipelineProject

CONTRACT#6600042366,BI-10-01996-0006
Saipem Aramco Contract StatusOF StatusOF
PipelineTyp Date of Time of LineTag/Locat ItemTagNo. Drawing No PMT
Sl.No. ContractorRFIN0 EPMRFINo. Location Discipl. SATIP # Activity # SAIC # DescriptionofActivity Insp. Insp. or /Sub PID Insp. Status HardCop ScanCop Remarks
e Inspection Inspection ion & Rev# Compressive Strength Inspection at Osaimi Insp.
Level Level Con Insp y y
Laboratory, Haradh for Lean concrete (4640 psi,
28days) poured for Eletrical Duct bank at the grid
SECURITY Osaimi MDRK- RH-B- line B 2-3 - (1 no) & Grid line B 3-4 -(1no). Edgardo Mohamm
FCC-SGCP-CIV- SUPPORT
1 00204
N/A 22-Sep-21 9:00 AM
BUILDING
Laboratory 151762-001- CIV SATIP-Q-001-02 3.7 SAIC-Q-1017 N/A Communication ductbank Grid line B 4-5 -(1 No) H W Romeo Bangco ed Al
Haradh BLDG-D83 .Electrical duct bank (1 no) Grid line A 2-3. and (Navab) Rashidi
(SSB)
VASS cable duct bank (1 no) Grid line A 3-4 . at
Security Support Building, MDRK RH-B at Osaimi
laboratory Haradh