JOB NUMBER:
1. Equipment and/or Lines to be worked on (clearly describe the work areas & feeder name)
2. Work to be carried out (fully describe the job and note any changes which may be made on the system)
Bypass re-closer 3892R, jumper through 33Kv lines on PP100540, disconnect droppers from both
sides of pole going to Re-closer 3892R to isolate it from service.
3. Live Work Techniques /Procedures to be used
LL G&B
☐ LV ☐
✔ G&B ☐ Hot Stick
4. Date and Time Details
Proposed Start Time Proposed End Time Alternative Start
Date: 03-May-24 Date: 03-May-24 Date:
Time: 0830 Time: 1630 Time:
5. Network Operations Approved
Print Name: Signed:
6. Field Service Provider Approved
Print Name: Signed:
Local
Emergency Isolation Points
Remote
SUBMIT
Doc ID Functional Area Document Owner Approver Issued Version Page
AE-OW04-F04 Operations Network Access GM Operations & 20/05/2021 5 1 of 1
Manager Network Performance
© 2021 Aurora Energy Ltd Warning: Printed & personally saved documents are UNCONTROLLED