Release Request Live Work

JOB NUMBER:

1. Equipment and/or Lines to be worked on (clearly describe the work areas & feeder name)

Stage 1, MEG/CM33, Re-closer 3892R, 33Kv Lines

2. Work to be carried out (fully describe the job and note any changes which may be made on the system)
Bypass re-closer 3892R, jumper through 33Kv lines on PP100540, disconnect droppers from both
sides of pole going to Re-closer 3892R to isolate it from service.
3. Live Work Techniques /Procedures to be used

LL G&B

☐ LV ☐
✔ G&B ☐ Hot Stick
4. Date and Time Details
Proposed Start Time Proposed End Time Alternative Start
Date: 03-May-24 Date: 03-May-24 Date:
Time: 0830 Time: 1630 Time:
5. Network Operations Approved
Print Name: Signed:
6. Field Service Provider Approved
Print Name: Signed:

☐ Employee Check ☐ Work Check ☐ Safety Check


7. Requested By (Job organiser)
Print Name: Tony Peake Date:
Signed: Phone Number: 0212423204
8. Recipient of Live Line Permit
Print Name: Cole Verduyn
9. Control Measures Required
1 Re-close Block
2
3

Local
Emergency Isolation Points
Remote

10. Customer Notification


None Retailer Handout Note: if the handout option is used the Field Service Provider must
complete and return a Direct Customer Notification Evidence
☐ ☐ ☐ form (AE-OO02-F03) at least 5 days prior to the job starting

11. Notes (include known hazards etc)

Aurora Project Manager: Suzanne Fraser


Aurora Purchase Order No: 7000021134 Aurora Sentient/CFR No: 7082

SUBMIT
Doc ID Functional Area Document Owner Approver Issued Version Page
AE-OW04-F04 Operations Network Access GM Operations & 20/05/2021 5 1 of 1
Manager Network Performance
© 2021 Aurora Energy Ltd Warning: Printed & personally saved documents are UNCONTROLLED