You are on page 1of 2

CONSULTANT

CLIENT
SUB CONSULTANT

Project Name ASICO/W0003/WI/MST/007


Revision No: 1
Infrastructure Work at Eastern Date: 26 AUG 2022
MAIN CONTRACTOR Residence (ER) South Project, Page 1 of 2
Dubai, UAE

Date: 30-01-2021
CHECK SHEET FOR : Installation of FM-200 System
SUBCONTRACTOR CONTRACTOR Ref No: MOS-

Section of Work : Installation of FM-200 System Location: Low Voltage Room

Checked
Checked by
SN ITEMS by DATE
S/C M/C. CONS.

Visual Inspection:

Check detector layout. Alarm bell & other


1 accessories, installed as per approved
drawing.

Check interfacing connection in main fire alarm


2 panel.

Check Interfacing connections with dampers


3 and all type of air-handling units inside the FM
200 protected room

Installation Check List:

Check connection connections of detector


1 base, Alarm bells and other devices.

Termination of cables to the panel

Continuity check with end of line devices at the


2 last detector and bell

Power the panel with AC & DC and reset.


3

Functional test :
CONSULTANT
CLIENT
SUB CONSULTANT

Project Name ASICO/W0003/WI/MST/007


Revision No: 1
Infrastructure Work at Eastern Date: 26 AUG 2022
MAIN CONTRACTOR Residence (ER) South Project, Page 2 of 2
Dubai, UAE

Remove One Detector from circuit


1

Make an open circuit in any if the 3 alarm


2
indicating circuits.

Activate one smoke detector from any zone


4

Activate another smoke detector from other


5 zone

At the end of the set time delay


6
Press abort switch after functional test 3 & and
within the set time delay.
7
Press manual release switch
8

Make an open circuit at IRM


9

Sub.Contractor: Main Contractor: Consultant:


Date: Date: Date:

Name: Name: Name:

Sign: Sign: Sign:

Remarks:

……………………………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………………………

Accepted / Rejected
Carried out By: ………………………………………
Date of Test: