Permit Number 1
Works Description
Installing of 150mm dia carrier pipe along edge of carriageway. Depth of cover to be min 300mm . Bed and surround
with ST2 concrete. Level of dig to be determined on site.
4. Works area surveyed (CAT Scanned) by a Competent Person? By J.H and marked in RED.
8. Is ‘hand-digging’ required?
1) Excavations completed in accordance with HSG 47 Avoiding danger from underground services.
2) Excavation WILL NOT take place unless the Permit to Work is completed, service drawings reviewed, a CAT scanned completed and identified
services conspicuously marked-up.
3) If additional/unidentified services are discovered, stop work and contact the Site Engineer / Manager.
4) Mechanical excavation shall not be used with 0.5m of identified services.
5) Personnel will have received information in relation to the associated RAMS (Risk Assessment / Method Statement) prior to the works
commencing.
I am satisfied that:
1) No damaged of any exposed utilities has taken place. Note – If damaged has occurred, please provide details, including photographs in the
section below.
2) The excavation has been suitably backfilled / covered / protected.
3) The utility company(s) have been informed that any services that have been ‘made-dead’ can now be reactivated.
4) The works have been completed in accordance with specification.
5) Information is relation to any diverted services has been passed onto the Site Engineer so the ‘As-built’ drawings can be appropriately
amended.
6) Information in relation to any unidentified services has been passed onto the Site Engineer so the ‘As-built’, drawings can be appropriately
amended.
Additional Works
Damage Details
Section E Cancellation of the Permit to Dig (To be completed by the Site Engineer / Contracts Manager)
I am satisfied that:
1) That the works has been completed in accordance with specification.
2) The excavation has been suitably reinstated or protected and does not pose a H&S risk.
3) The Service Drawings have been appropriately updated (marked-up); including the location of any services previously not detailed in the
Service Drawings.
4) The works have been completed in accordance with specification.
Comments