Professional Documents
Culture Documents
CONTRACT
PREVIOUS CURRENT TOTAL
AMOUNT
BILL NO. DESCRIPTION PAGE NO.
(RM) (RM) (RM) %
D1 - SITE CLEARANCE AND EARTHWORKS Page D1/EW/6 1,327,450.00 0.00 0.00 0.00%
D2 - RETAINING WALLS & REINFORCED SOIL WALL (INCLUDING
Page D2/RET/19 4,627,516.80 0.00 0.00 0.00%
PILING WORKS)
D3 - ROADS, CARPARKS AND HARDSTANDING Page D3/RW/5 1,172,958.85 0.00 0.00 0.00%
D12 - WORKS OUTSIDE SITE BOUNDARY Page D12/WOSB/18 464,061.50 0.00 0.00 0.00%
D/SUM
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Summary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D/SUM
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
GENERAL NOTES
Notes:
D1/EW/1
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
SITE CLEARANCE
A Site clearing of all accumulated rubbish, Acres 7 2,000.00 14,000.00 0.00 0.00 0 0.00
waste materials, construction debris(concrete
piles and structures) and other obstruction/
structures to the works, remove all tall grass,
shrub, bushes etc, cut down all trees
irrespective of size and grub up all roots
(except where to be retained as directed on
site by the Superintending Officer, and cart
away all debris from site to Contractor's own
dumping site including obtaining license and
approval from the authority and paying all
necessary levy and charges
EARTHWORKS
C Excavate & backfilling; using selected m3 9,802 7.50 73,515.00 0.00 0.00 0 0.00
excavated materials; trimming, compacting
and consolidating in layers in making up
levels as per Engineer Drawing No.
JKR/CKAS/14/14/N19/146/KT/01(04)-04(04)
and as directed by the Superintending Officer
D Excavate in bulk to the final requisition m3 64,914 16.00 1,038,624.00 0.00 0.00 0 0.00
platform levels as per Engineer Drawing No.
JKR/CKAS/14/14/N19/146/KT/01(04)-04(04),
get out and remove/transport surplus
excavated materials away from site to
approved fill areas/dumping ground
E Extra Over for excavation in rock by m3 1 80.00 RATE ONLY 0.00 0.00 0 0.00
pneumatic tools/breaker, to formation level,
load and cart away from site as directed by
the Superintending Officer
D1/EW/2
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Construct temporary silt trap and spillway Nos. 1 6,500.00 6,500.00 0.00 0.00 0 0.00
overall size 14m x 21m on plan complete with
outlet to details as shown on Engineer's
drawing complete with all necessary
excavation, 20mm size aggregate filling,
geotextile and galvanised wire gabion,
300mm thick sand layer, rip rap stone,
maintain it in good order throughout the
Contract Period and backfill with approved
materials when no longer required all as per
Engineer Drawing No.
JKR/CKAS/P-KHK/BKA/30/PEL18/(4/10) and
the approval of the Superintending Officer
B Construct temporary silt trap and spillway, Nos. 1 7,500.00 7,500.00 0.00 0.00 0 0.00
overall size 16m x 25m on plan complete with
outlet to details as shown on Engineer's
drawing complete with all necessary
excavation, 20mm size aggregate filling,
geotextile and galvanised wire gabion,
300mm thick sand layer, rip rap stone,
maintain it in good order throughout the
Contract Period and backfill with approved
materials when no longer required all as per
Engineer Drawing No.
JKR/CKAS/P-KHK/BKA/30/PEL18/(4/10) and
the approval of the Superintending Officer
WASH TROUGH
C Construct wash trough overall size 19m x Nos. 1 10,000.00 10,000.00 0.00 0.00 0 0.00
4.5m to details as shown on Engineer's
drawing complete with overflow outlet, pit and
25mm Dia M.S. bar welded to top of I-Beam,
200mm thick concrete base G25/30 with T12-
200 main bars, 50mm thick lean concrete
G15P with plaster both side, including all
necessary excavation, discharge to proposed
temporary earth toe drain, desilting,
maintenance during the duration of the
contract period and removal after completion
of the works, all as per Engineer Drawing No.
JKA/CKAS/P-KHK/BKA/30/PEL18/(3/10) and
the approval of the Superintending Officer
D1/EW/3
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Silt fence constructed of geotextile polyfect, m 285 20.00 5,700.00 0.00 0.00 0 0.00
75mm x 50mm hardwood bracing, 75mm x
50mm intermediate support post, 75mm x
50mm plywood washer, hoarding post at
1.50m interval and temporary hoarding board
with compacted backfill, 1.8m star pickets /
timber pegs at 1.5m center to center, all as
per Engineer Drawing No. JKA/CKAS/P-
KHK/BKA/30/PEL18(7/10) and the approval
of the Superintending Officer
B Overall size 1750mm wide x 450mm depth; m 523 25.00 13,075.00 0.00 0.00 0 0.00
earth drain
C Overall size 1750mm wide x 450mm depth m 90 120.00 10,800.00 0.00 0.00 0 0.00
with 200mm thick stone pitching; curved earth
drain
D Overall size 2050mm x 2050mm and depth Nos. 5 2,000.00 10,000.00 0.00 0.00 0 0.00
not exceeding 1m with 200mm thick stone
pitching for earth sumps
E Allow connection of earth drain to sediment Item 1 500.00 500.00 0.00 0.00 0 0.00
basin
F Maintain and make good to Item 1 1,000.00 1,000.00 0.00 0.00 0 0.00
earthdrains,forming a clear and unobstructed
waterway all as the approval of the
Superintending Officer
D1/EW/4
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Construct temporary 750mm diameter R.C m 29 500.00 14,500.00 0.00 0.00 0 0.00
Pipe Culverts with and including concrete
base, reinforcement, mass concrete,
including all necessary excavation, 50mm
lean concrete, backfilling with suitable
compacted earth, hoisting and setting in
position, jointed in cement and sand (1:3)
mortar and splayed fillets to collar, diversion
of any existing water course prior to
excavation of pipe culvert including
maintenance and removal when no longer
required
TEMPORARY INTERLOCKING PAVER AT
ENTRANCE
B Construct temporary interlocking paver at Item 1 65,000.00 65,000.00 0.00 0.00 0 0.00
entrance on the exitsing road including sand
bedding, edge restraints, 80mm thick heavy
duty interlocking paver and new layer of
asphaltic concrete premix including
scrapping existing premix and all necessary
works as per Engineering Drawing No.
JKA/CKAS/P-KHK/BKA/30/PEL18/(1/10)
(approx. 430m2)
D1/EW/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
COLLECTION
D1/EW/6
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
GENERAL NOTES
EXCAVATION
B 50mm thick blinding under concrete base m3 1 320.00 320.00 0.00 0.00 0 0.00
D1/EW/7
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 163 4.50 733.50 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 1 4.50 4.50 0.00 0.00 0 0.00
FORMWORK
E Edge of concrete base; exceeding 250mm m 10 22.50 225.00 0.00 0.00 0 0.00
but not exceeding 500mm wide
D1/EW/8
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
EXCAVATION
B Not exceeding 4.00m deep. m3 101 30.00 3,030.00 0.00 0.00 0 0.00
D 50mm thick blinding under concrete base m3 3 320.00 960.00 0.00 0.00 0 0.00
D1/EW/9
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 1,386 4.50 6,237.00 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 6 4.50 27.00 0.00 0.00 0 0.00
FORMWORK
F Approved 100mm diameter pvc weephole at Nos. 14 40.00 560.00 0.00 0.00 0 0.00
1.50m c/c vertically and 2.00m c/c
horizontally with and including wrapped with
geotextile filter
G Apply approved two layers of bituminous m2 32 25.00 800.00 0.00 0.00 0 0.00
paint to concrete walls all to manufacturer's
specifications
D1/EW/10
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
EXCAVATION
B Not exceeding 4.00m deep. m3 230 30.00 6,900.00 0.00 0.00 0 0.00
D Back filling to back of retaining walls to make m3 26 10.00 260.00 0.00 0.00 0 0.00
up levels with sand of which the friction angle
shall not be less than 30 degrees, levelled
and compacted as specified including grading
sides to slopes inclusive payment of all
permits, fees, deposits to the local authority
approval and remove the excavated
unsuitable materials from site.
E 50mm thick blinding under concrete base m3 5 320.00 1,600.00 0.00 0.00 0 0.00
D1/EW/11
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
REINFORCEMENT
In concrete base
A 20mm Diameter straight and bent bars kg 5,620 4.50 25,290.00 0.00 0.00 0 0.00
In concrete wall
B 20mm Diameter straight and bent bars kg 5,639 4.50 25,375.50 0.00 0.00 0 0.00
In toe beam
C 20mm Diameter straight and bent bars kg 407 4.50 1,831.50 0.00 0.00 0 0.00
D 20mm Diameter links, stirrups, binders and kg 1,032 4.50 4,644.00 0.00 0.00 0 0.00
the like
FORMWORK
G Edge of concrete base; exceeding 250mm m 58 22.50 1,305.00 0.00 0.00 0 0.00
but not exceeding 500mm wide
H Approved 100mm diameter pvc weephole at Nos. 28 30.00 840.00 0.00 0.00 0 0.00
1.50m c/c vertically and 2.00m c/c
horizontally with and including wrapped with
geotextile filter
I Apply approved two layers of bituminous m2 43 25.00 1,075.00 0.00 0.00 0 0.00
paint to concrete walls all to manufacturer's
specifications
D1/EW/12
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
EXCAVATION
C Back filling to back of retaining walls to make m3 10 10.00 100.00 0.00 0.00 0 0.00
up levels with sand of which the friction angle
shall not be less than 30 degrees, levelled
and compacted as specified including grading
sides to slopes inclusive payment of all
permits, fees, deposits to the local authority
approval and remove the excavated
unsuitable materials from site.
D 50mm thick blinding under concrete base m3 2 320.00 640.00 0.00 0.00 0 0.00
D1/EW/13
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 848 4.50 3,816.00 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 4 4.50 18.00 0.00 0.00 0 0.00
FORMWORK
E Edge of concrete base; exceeding 250mm m 36 22.50 810.00 0.00 0.00 0 0.00
but not exceeding 500mm wide
F Approved 100mm diameter pvc weephole at Nos. 9 40.00 360.00 0.00 0.00 0 0.00
1.50m c/c vertically and 2.00m c/c
horizontally with and including wrapped with
geotextile filter
G Apply approved two layers of bituminous m2 17 25.00 425.00 0.00 0.00 0 0.00
paint to concrete walls all to manufacturer's
specifications
TESTING
D1/EW/14
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Notes :
D1/EW/15
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
D1/EW/16
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Notes : (Cont'd)
Preamble
A Allow for ground water level was established ITEM 1 1,000.00 1,000.00 0.00 0.00 0 0.00
below existing ground level which shall be
designated
Mobilisationat theDemobilisation
and pre-contract water level
B Allow for the mobilisation of necessary piling Item 1 26,450.00 26,450.00 0.00 0.00 0 0.00
equipment, plant, tools and ancillary and for
their transportation to the site, handling,
assembling, erecting, dismantling, moving
about the site as often and whenever
necessary for the whole operation including
all idle standing time and demobilisation
upon completion. This item shall also
include any excavation, filling earth to make
up levels and staging requirede for moving of
plant from differing levels on site.The
Contractor shall used 'JACK-IN PILE
METHOD' for this project.
Maintaining on site
C Allow for moving, handling and maitaining Item 1 3,000.00 3,000.00 0.00 0.00 0 0.00
piling equipment, plants, tools and ancillary
equipment about the site as often and
whenever necessary for the execution of the
whole piling operation including any
excavation and filing required for moving the
plant, tools and ancillary equipment forom
differing levels of the site erection of any
staging required, installing piles on
embankments or slopes and dismantling and
removal on completion, and all idling time.
The contractor shall used 'JACK-IN PILE
METHOD' for this project
D1/EW/17
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
PRELIMINARY PILES
B 250 mm x 250mm initial pile in 12m length Nos. 12 681.90 8,182.80 0.00 0.00 0 0.00
with pointed mild steel plate pile shoe
C 250 mm x 250mm extension pile in 6m length m 144 80.70 11,620.80 0.00 0.00 0 0.00
E 250 mm x 250mm extension pile in 6m length Nos. 24 9.00 216.00 0.00 0.00 0 0.00
F 250mm x 250mm pile, in 12 metre length m 144 25.00 3,600.00 0.00 0.00 0 0.00
G 250mm x 250mm pile, in 6 metre length m 144 25.00 3,600.00 0.00 0.00 0 0.00
288
Jointing with continuous 12m fillet weld all
round for connecting in position driven pile
with extension pile including painting with two
coats of approved bituminous paint to
exposed surfaces of welded plates
D1/EW/18
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Notes :- (Cont'd)
WORKING PILES
B 250 mm x 250mm initial pile in 12m length Nos. 1,258 652.20 820,467.60 0.00 0.00 0 0.00
with pointed mild steel plate pile shoe
C 250 mm x 250mm extension pile in 6m length m 15,096 77.10 1,163,901.60 0.00 0.00 0 0.00
E 250 mm x 250mm extension pile in 6m length Nos. 2,516 9.00 22,644.00 0.00 0.00 0 0.00
F Initial pile, in 12 metre length m 15,096 17.50 264,180.00 0.00 0.00 0 0.00
G Extension pile, in 6 metre length m 15,096 17.50 264,180.00 0.00 0.00 0 0.00
30,192
D1/EW/19
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Notes :- (Cont'd)
A 250mm X 250mm pile Nos. 2,516 22.50 56,610.00 0.00 0.00 0 0.00
Cut-off top, strip and dispose all surplus Nos. 1,258 50.00 62,900.00 0.00 0.00 0 0.00
length of precast reinforced concrete pile
including all necessary excavation and
backfilling, all bending and anchoring steel
bars to pile caps and any reinforcement and
concrete by Engineer's approval
TESTING
C 250mm X 250mm precast reinforced concrete Nos. 4 15,000.00 60,000.00 0.00 0.00 0 0.00
piles Maintained Load Test to a working load
of 700kN
D 250mm X 250mm precast reinforced concrete Nos. 10 1,250.00 12,500.00 0.00 0.00 0 0.00
piles
D1/EW/20
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
D1/EW/21
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Notes : (Cont'd)
A Not exceeding 4.00m deep, for RS wall base m3 50 10.00 500.00 0.00 0.00 0 0.00
B Not exceeding 6.00m deep, for RS wall base m3 1,157 10.00 11,570.00 0.00 0.00 0 0.00
C Not exceeding 9.00m deep, for RS wall base m3 2,307 10.00 23,070.00 0.00 0.00 0 0.00
D Not exceeding 12.00m deep, for RS wall base m3 3,242 10.00 32,420.00 0.00 0.00 0 0.00
D1/EW/22
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
B RC leveling pad, overall size 800mm x m 10 350.00 3,500.00 0.00 0.00 0 0.00
200mm high constructed of reinforced
concrete (Grade 30), reinforcement,
formwork, with and including all necessary
excavation, backfilling, etc, all as per
Engineer's Drawing No. JKR.CKG.BKA.600-
3/2/49-RS 03 (**) (for 0 - 4mH wall ONLY)
C 50mm thick blinding under concrete base m3 82 320.00 26,240.00 0.00 0.00 0 0.00
D Concrete base (500mm thick) m3 815 340.00 277,100.00 0.00 0.00 0 0.00
REINFORCEMENT
E 16mm Diameter straight and bent bars kg 45,139 4.50 203,125.50 0.00 0.00 0 0.00
F 20mm Diameter dowel bars kg 1,136 4.50 5,112.00 0.00 0.00 0 0.00
FORMWORK
D1/EW/23
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Supply and install approved Expansion Joint m 108 36.00 3,888.00 0.00 0.00 0 0.00
System of 25mm joint width, comprising of
compressible joint filler, sealing compound
and H20 dowel bars at 300mm c/c (measured
separately) to slabs all to the approval of the
Engineer
B Height of wall not exceeding 4.0m high m2 18 266.00 4,788.00 0.00 0.00 0 0.00
C Height of wall not exceeding 6.0m high m2 437 266.00 116,242.00 0.00 0.00 0 0.00
D Height of wall not exceeding 9.0m high m2 597 266.00 158,802.00 0.00 0.00 0 0.00
E Height of wall not exceeding 12.0m high m2 637 266.00 169,442.00 0.00 0.00 0 0.00
F Supply and compaction of selected granular m3 9,911 58.00 574,838.00 0.00 0.00 0 0.00
backfill, all in accordance in to Reinforced
G Soil Wall Specialist's
Supply and lay specification
approved (**)
non-woven m2 62 15.00 930.00 0.00 0.00 0 0.00
geotextile filter (min 300mm overlap
coverage)
TESTING to base of Reinforced Soil Wall
D1/EW/24
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
COLLECTION
D1/EW/25
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
ROADS
A Excavate oversite commencing from platform m3 3,502 10.00 35,020.00 0.00 0.00 0 0.00
level and get out, part return, fill in and ram,
deposit, spread and level in making up levels
where directed within the site and
remove/transport surplus excavated materials
away from site
B Grade road formation level to gradient and m2 7,782 2.00 15,564.00 0.00 0.00 0 0.00
falls and rolled to receive sand blinding
C 150mm Thick (finished) sand blanket as sub- m2 7,782 10.95 85,212.90 0.00 0.00 0 0.00
base course, spread, levelled, well rolled and
compacted to falls and chambers as
described to receive road base (measured
separately)
D 250mm Thick (finished) crusher run m2 7,782 22.50 175,095.00 0.00 0.00 0 0.00
aggregate as described road base spread
and levelled in two layers to falls, chambers,
well rammed and consolidated as described
and blinded with 3mm granite chippings, to
receive bituminous surface course
E 50mm Thick (consolidated) surface course of m2 7,782 28.00 217,896.00 0.00 0.00 0 0.00
bituminuous premixed macadam (B.S 4987-
14mm) as specified spread and rolled to
exact falls and cross falls, chambers and
gradients including applying prime coat to
surface course as specified
D1/EW/26
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
PAVEMENT
A Excavate oversite to reduce level from m2 3,563 3.50 12,470.50 0.00 0.00 0 0.00
formation level average 130mm depth and
get out, deposit, spread and level in making
up levels where directed within the site
including grading to falls and chambers rolled
and compacted to form sub-grade as
specified and remove/transport surplus
excavated materials away from site
B 50mm Thick sand bedding spread and m2 3,563 3.65 13,004.95 0.00 0.00 0 0.00
levelled, well compacted and blinded
C 80mm Thick `Monier Uni-pave' or other equal m2 2,182 80.50 175,651.00 0.00 0.00 0 0.00
and approved interlocking concrete paving
block of approved colour laid on sand
bedding (measured separately) with and
including edge restraint
D 225 x 225x 80mm Thick approved m2 1,381 126.50 174,696.50 0.00 0.00 0 0.00
interlocking concrete grass paver block of
approved colour laid on sand bedding
(measured separately) with and including
edge restraint
E 215 x 103 x 65mm Thick concrete brick in m 540 20.00 10,800.00 0.00 0.00 0 0.00
between road and paver blocks with and
including all necessary excavation
ROAD KERBS
D1/EW/27
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
F 300mm (W) x 275mm (H) cast in-situ semi- m 2,139 50.00 106,950.00 0.00 0.00 0 0.00
mountable kerb concrete Grade C20/25 as
described high kerb with channel piece with
chamfered top edge cast in various lengths
and setting on and including 100mm thick
concrete Grade 15 as described bed all ends,
angles, junction, curved length, transition
from low to high kerb, all necessary
excavation and mould all as per Engineer's
Drawing No.
JKR/CKAS/P-JD/BKA/30/PEL18/(21/21)
(Type SM1)
G Extra Over for 300mm (W) x 275mm (H) kerb Nos. 379 50.00 18,950.00 0.00 0.00 0 0.00
opening
H Prepare and apply two coats of approved m 2,139 10.00 21,390.00 0.00 0.00 0 0.00
synthetic enamel road paint in alternate black
and white colour of 600mm in length centres
on exposed surface of kerb and not exceding
900mm girth
WHEEL STOPPER
A Precast concrete kerb wheel stopper, overall Nos. 62 100.00 6,200.00 0.00 0.00 0 0.00
size 230mm (W) x 125mm (H) x 1800mm (L)
complete with 57.5mm x 75mm corner splay,
50mm diameter holes to received 2nos of
10mm diameter x 150mm(L) m.s dowel
anchored to interlocking pavers (At Carparks)
TRAFFIC SIGN
B "STOP AT INTERSECTION" traffic road signs Nos. 8 500.00 4,000.00 0.00 0.00 0 0.00
RP. 1
C "CROSSING FOR DISABLE PEOPLE" traffic Nos. 1 500.00 500.00 0.00 0.00 0 0.00
road signs WD.34
D "PARKING" traffic road signs GI.4 Nos. 11 500.00 5,500.00 0.00 0.00 0 0.00
D1/EW/28
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
E "PEDESTRIAN CROSSING" traffic road signs Nos. 3 500.00 1,500.00 0.00 0.00 0 0.00
WD.14
F "GIVE WAY" traffic road signs RP.13 Nos. 1 500.00 500.00 0.00 0.00 0 0.00
G "RIGHT TURN ONLY" traffic road signs Nos. 1 500.00 500.00 0.00 0.00 0 0.00
RM.1d
ROAD MARKING
D Left or Right turn direction arrow Nos. 7 100.00 700.00 0.00 0.00 0 0.00
E Centre Line (Type 3) - 100mm wide, 1000mm m 660 2.80 1,848.00 0.00 0.00 0 0.00
long, 1700mm gap
F Edge Line (Type 6) - 150mm wide m 1,100 6.75 7,425.00 0.00 0.00 0 0.00
G Stop Line (Type 7) - 300mm wide m 31 13.50 418.50 0.00 0.00 0 0.00
H Pedestrian Crossing (Zebra) (Type 9) - m 105 36.00 3,780.00 0.00 0.00 0 0.00
600mm wide
I Yellow Box Markings (Type 15) - 600mm wide m 60 36.00 2,160.00 0.00 0.00 0 0.00
J Carpark Lines - 100mm wide m 2947 4.50 13,261.50 0.00 0.00 0 0.00
GUARD RAIL
D1/EW/29
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
K 730mm (Minimum) high single mounted m 228 227.50 51,870.00 0.00 0.00 0 0.00
guard rail constructed of 178mm x 76mm x
6.5mm thick C-channel section as post each
1830mm (extreme) long with bottom cast into
400mm x 400mm x 915mm high concrete
footing spaced at 3810mm (maximum)
centres including 16mm diameter bolt, nut,
cut steel washer, excavation and formwork,
etc, all as per Local Authorities and
Engireer's Drawings No.
JKR/CKAS/P-JD/BKA/30/PEL18/ (16/21)-
(18/21)
L Extra for end wing terminal sections including Nos. 2 1,562.50 3,125.00 0.00 0.00 0 0.00
all necessary bolts and nuts, all as per
Engireer's Drawings No.
JKR/CKAS/P-JD/BKA/30/PEL18/ (16/21)-
(18/21)
COLLECTION
D1/EW/30
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
GENERAL NOTES
A Maximum depth not exceeding 2.00m m3 1,388 20.00 27,760.00 0.00 0.00 0 0.00
D1/EW/31
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
B 750mm Width x 50mm thick under concrete m3 12 330.00 3,960.00 0.00 0.00 0 0.00
base to 300mm HRGW drain
C 600mm Width x 50mm thick under concrete m3 19 330.00 6,270.00 0.00 0.00 0 0.00
base to 600mm x 600mm U drain
D 750mm Width x 50mm thick under concrete m3 3 330.00 990.00 0.00 0.00 0 0.00
base to 750mm x 750mm U drain
E 900mm Width x 50mm thick under concrete m3 1 330.00 330.00 0.00 0.00 0 0.00
base to 900mm x 900mm U drain
F 600mm Width x 50mm thick under concrete m3 2 330.00 660.00 0.00 0.00 0 0.00
base to 600mm x 600mm box culvert
G 750mm Width x 50mm thick under concrete m3 1 330.00 330.00 0.00 0.00 0 0.00
base to 750mm x 750mm box culvert
H 900mm Width x 50mm thick under concrete m3 1 330.00 330.00 0.00 0.00 0 0.00
base to 900mm x 900mm box culvert
I 675mm Width x 50mm thick under concrete m3 2 330.00 660.00 0.00 0.00 0 0.00
base to receive 450mm pipe culvert
B 750mm Width x 200mm thick crusher run to m 61 15.70 957.70 0.00 0.00 0 0.00
750mm x 750mm U drain
C 900mm Width x 200mm thick crusher run to m 3 18.80 56.40 0.00 0.00 0 0.00
900mm x 900mm U drain
D 600mm Width x 200mm thick crusher run to m 49 12.50 612.50 0.00 0.00 0 0.00
600mm x 600mm box culvert
E 750mm Width x 200mm thick crusher run to m 27 15.70 423.90 0.00 0.00 0 0.00
750mm x 750mm box culvert
F 900mm Width x 200mm thick crusher run to m 12 12.50 150.00 0.00 0.00 0 0.00
600mm x 600mm box culvert
G 750mm Width x 325mm thick concrete base m3 57 330.00 18,810.00 0.00 0.00 0 0.00
to 300mm HRGW drain
D1/EW/32
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
H 900mm width x 725mm thick concrete base m3 727 330.00 239,910.00 0.00 0.00 0 0.00
to 450mm x 450mm block drain
A BRC A8 laid in 750mm width x 325mm thick m2 175 20.00 3,500.00 0.00 0.00 0 0.00
concrete base to 300mm HRGW drain
B BRC A8 laid in 900mm width x 725mm thick m2 1,003 20.00 20,060.00 0.00 0.00 0 0.00
concrete base to 450mm x 450mm block
drain
C Sides of concrete base exceeding 250mm m 468 22.50 10,530.00 0.00 0.00 0 0.00
but not exceeding 500mm high to 300mm
HRGW drain
D1/EW/33
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
D Sides of concrete base, 750mm high for m 2,230 33.75 75,262.50 0.00 0.00 0 0.00
450mm x 450mm block drain
E 150mm Diameter UPVC pipe m 379 80.00 30,320.00 0.00 0.00 0 0.00
D1/EW/34
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Overall size 750mm width to falls on concrete m 234 90.00 21,060.00 0.00 0.00 0 0.00
base
C Overall size 900mm width m 1,115 295.00 328,925.00 0.00 0.00 0 0.00
D 650mm x 900mm x 75mm Thick precast Nos. 1,240 80.00 99,200.00 0.00 0.00 0 0.00
compressed concrete slab cover slab with
recess at side edges, finished fair on all
exposed surfaces and edges and placing in
position and all necessary works as per S.O
approval.
A Supply, deliver, unload, handle and lay in m 48 200.00 9,600.00 0.00 0.00 0 0.00
position 450mm diameter precast concrete
pipe culvert "Class Z" with and including
150mm thick reinforced concrete grade
C30/37 base reinforced with 1 layer of BRC
A8 wire mesh and concrete benching on
bothsides; all as per Engineer Drawing No.
JKR/CKAS/P-SS/BKA/30/PEL18/(14/23) and
manufacturer's instruction and as per
Superintending Officer approval
D1/EW/35
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
B Overall size 600mm width x 600mm deep m 377 185.00 69,745.00 0.00 0.00 0 0.00
C Overall size 750mm width x 750mm deep m 61 230.00 14,030.00 0.00 0.00 0 0.00
D Overall size 900mm width x 900mm deep m 3 250.00 750.00 0.00 0.00 0 0.00
F 910mm (W) x 140mm Thick precast m 61 100.00 6,100.00 0.00 0.00 0 0.00
compressed concrete slab cover slab all to
manufacturer's detail and S.O approval.
G 1060mm (W) x 140mm Thick precast m 3 120.00 360.00 0.00 0.00 0 0.00
compressed concrete slab cover slab all to
manufacturer's detail and S.O approval.
H Capping beam, overall size 300mm(W) x max m2 482 120.00 57,840.00 0.00 0.00 0 0.00
1100mm(H), constructed of concrete (Grade
30) reinforced with 2H12 main bars @
300mm centres & 2H10 @ 200mm centres,
with and including all necessary excavation,
formwork, installed with H10 starter bars 0f
600mm length @ 250mm centres on top of
U-drain, etc, all to Superintending Officer's
approval (Provisional)
BOX CULVERT
D1/EW/36
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
BERM DRAIN
D Bench Drain Type 1, overall size 1300mm m 347 120.00 41,640.00 0.00 0.00 0 0.00
(min) girth x 300mm depth with side slope
(1:1) comprising of 50mm concrete blinding,
150mm thick concrete (Grade C30/37) base
reinforced with a layer of BRC A8, including
all necessary excavation, formwork & etc, all
to Superintending Officer's approval (Type
BC1)
E Bench Drain Type 2, overall size 825mm m 230 40.00 9,200.00 0.00 0.00 0 0.00
width with and including 225mm half round
PC drain, comprising of 50mm concrete
blinding, 50mm thick concrete (Grade
C30/37) base, including all necessary
excavation, formwork & etc, all to
Superintending Officer's approval (Type BC2)
F Interceptor Drain Type 2, overall size m 323 350.00 113,050.00 0.00 0.00 0 0.00
5200mm (min) girth x 600mm (min) depth
with side slope (1:1) comprising of 50mm
concrete blinding, 150mm thick concrete
(Grade C30/37) base reinforced with a layer
of BRC A8, including all necessary
excavation, formwork & etc, all to
Superintending Officer's approval (Type ID2)
CASCADING DRAIN
D1/EW/37
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
A Exceeding 0.9m but not exceeding 1.2m m 11 295.00 3,245.00 0.00 0.00 0 0.00
B Exceeding 1.2m but not exceeding 1.5m m 20 350.00 7,000.00 0.00 0.00 0 0.00
BRICKWORK SUMP
C To invert level not exceeding 1.05m deep Nos. 8 400.00 3,200.00 0.00 0.00 0 0.00
D To invert level not exceeding 1.05m deep Nos. 57 450.00 25,650.00 0.00 0.00 0 0.00
E To invert level exceeding 1.05m but not Nos. 10 750.00 7,500.00 0.00 0.00 0 0.00
exceeding 2.55m deep
F To invert level not exceeding 1.05m deep Nos. 7 600.00 4,200.00 0.00 0.00 0 0.00
G To invert level exceeding 1.05m but not Nos. 6 970.00 5,820.00 0.00 0.00 0 0.00
exceeding 2.55m deep
H To invert level exceeding 1.05m but not Nos. 7 1,200.00 8,400.00 0.00 0.00 0 0.00
exceeding 2.55m deep
BRICKWORK SUMP
D1/EW/38
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
B Overall size 600mm x 600mm for Brick Sump Nos. 8 360.00 2,880.00 0.00 0.00 0 0.00
(S1)
C Overall size 750mm x 750mm for Brick Sump Nos. 67 562.50 37,687.50 0.00 0.00 0 0.00
(S2)
D Overall size 900mm x 900mm for Brick Sump Nos. 13 810.00 10,530.00 0.00 0.00 0 0.00
(S3)
E Overall size 1050mm x 1050mm for Brick Nos. 7 1,102.50 7,717.50 0.00 0.00 0 0.00
Sump (S4)
F Overall size 450mm x 450mm for Brick Sump Nos. 10 202.50 2,025.00 0.00 0.00 0 0.00
(S6)
D1/EW/39
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
RC SUMP
A To invert level exceeding 1.50m deep but not Nos. 4 2,500.00 10,000.00 0.00 0.00 0 0.00
exceeding 2.50m deep
B To invert level exceeding 1.50m deep but not Nos. 2 3,500.00 7,000.00 0.00 0.00 0 0.00
exceeding 2.50m deep
C Extra over for forming 1600mm x 50mm Nos. 1 100.00 100.00 0.00 0.00 0 0.00
outlet weir
D Extra over for forming 450mm diameter oulet Nos. 1 100.00 100.00 0.00 0.00 0 0.00
orifice
E Overall size 1200mm x 1200mm for RC (S5) Nos. 4 1,440.00 5,760.00 0.00 0.00 0 0.00
F Overall size 1800mm x 1800mm for RC Nos. 2 3,240.00 6,480.00 0.00 0.00 0 0.00
Sump (S6)
G Gross Pollutant Trap System with and Item 1 5,000.00 5,000.00 0.00 0.00 0 0.00
including all necessary fittings and
accessories all to manufacturer's detail and
approved by the S.O
D1/EW/40
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
Testing
A Labour and material for jointing new drain Item 1 1,000.00 1,000.00 0.00 0.00 0 0.00
or culvert to existing drain and making good
all works disturbed
B On completion of surface water drainange, Item 1 2,000.00 2,000.00 0.00 0.00 0 0.00
allow for testing the whole surface water
drainage system, making good any
defects and leave the whole system in
perfect working order to the entire satisfaction
of the Superintending Officer
COLLECTION
D1/EW/41
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
EXCAVATION
A 450mm Wide (minimum) trench pipe m 551 10.00 5,510.00 0.00 0.00 0 0.00
maximum depth not exceeding 2.00m deep
to 150mm diameter mild steel cement lining
(mscl) pipe
B 450mm Wide x 450mm Thick to receive m 459 10.00 4,590.00 0.00 0.00 0 0.00
150mm diameter pipe (measured separately)
C 450mm Wide x 850mm Thick to 150mm m 459 10.00 4,590.00 0.00 0.00 0 0.00
diameter pipe (measured separately)
D 450mm Wide x 450mm Thick to 150mm m 92 32.00 2,944.00 0.00 0.00 0 0.00
diameter pipe (measured separately)
E 450mm Wide with maximum depth not m 92 33.30 3,063.60 0.00 0.00 0 0.00
exceeding 2.00m deep to 150mm diameter
pipe (measured separately)
D1/EW/42
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
PIPE WORKS
A 150mm Diameter mild steel cement lining m 185 220.00 40,700.00 0.00 0.00 0 0.00
pipe (mscl) laid and jointed in trench
(measured separately) as domestic pipe
B 150mm Diameter mild steel cement lining m 366 220.00 80,520.00 0.00 0.00 0 0.00
pipe (mscl); ditto as hydrant pipe
C Extra Over for 150mm diameter 45 degree Nos. 1 600.00 600.00 0.00 0.00 0 0.00
bend
D Extra Over for 150mm diameter 60 degree Nos. 1 700.00 700.00 0.00 0.00 0 0.00
bend
E Extra Over for 150mm diameter 90 degree Nos. 12 800.00 9,600.00 0.00 0.00 0 0.00
bend
F Extra Over for 150mm x 150mm x 150mm Nos. 6 1,000.00 6,000.00 0.00 0.00 0 0.00
equal tee
G Extra Over for 150mm x 150mm x 150mm x Nos. 1 1,000.00 1,000.00 0.00 0.00 0 0.00
150mm cross tee
D1/EW/43
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
PIPE CROSSING
PILLAR HYDRANT
E 100mm Diameter cast iron double outlet pillar Nos. 4 700.00 2,800.00
fire hydrant system with (2 Nos.) 63.5mm
outlets complete with cap and chain including
100mm mild steel extension pipe, flange end
mild steel adaptor, 90 degree C.I duckfoot
bend set in and including 460mm x 460mm x
225mm high Grade 20 concrete thrust block
including ductile iron connector tees, finished
with primer undercoat and two coats gloss
paint all in accordance with Jabatan Bomba's
requirement with & including 100mm
Diameter sluice valves with double flange
including flanged adaptor, short piece,
precast valve chamber and including all
necessary excavation, imported earth
backfilling, concrete, formwork, anchor
blocks, fire hydrant post, etc. all as per
Engineer Drawing No.
JKR/CKAS/P-RA/BKA/30/PEL18(17/29)
D1/EW/44
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
MARKER POST
A Valve and Hydrant marker post overall height Nos. 8 150.00 1,200.00
750mm constructed of 50mm Diameter ABS
Class 9 pipe with end cap including 150mm x
25mm reflective sticker with lettering all to the
requirement as per Engineer Drawing JKR
CKAS/P-RA/BKA/30/PEL18/(18/29) and to
the approval of Local Authority
D Allow for the supply of all labour, materials Item 1 3,000.00 3,000.00
and tools for the tapping-off of the water
supply from the local authority main to water
reticulation pipe including all necessary clamp
and saddle, gate valve, short pipe, flange
adaptor, flange joints, equal tee and joint,
special fittings, all necessary excavation,
backfilling etc. to complete the whole works
including obtaining approval method of
tapping-off, paying fees, attending and
liasing with the Local Authorities concerned
TESTING
COLLECTION
D1/EW/45
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Site Clearance and Earthworks
D1/EW/46
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
GENERAL NOTES
ROADS
C2/RW/1
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
To Collection RM
ROAD WIDENING
C2/RW/2
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
To Collection RM
C2/RW/3
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
PAVEMENT
C2/RW/4
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
To Collection RM
TRAFFIC SIGN
C2/RW/5
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
To Collection RM
ROAD MARKING
C2/RW/6
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
To Collection RM
COLLECTION
Page C2/RW/1
Page C2/RW/2
Page C2/RW/3
Page C2/RW/4
Page C2/RW/5
C2/RW/7
SMK Bandar Baru Sg Lalang, Sg Petani
Bill C - External Works and Ancillary Buildings
Roads, Carparks and Hardstanding
C2/RW/8
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
GENERAL NOTES
EXCAVATION
B 50mm thick blinding under concrete base m3 1 320.00 320.00 0.00 0.00 0 0.00
D2/RET/9
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 163 4.50 733.50 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 1 4.50 4.50 0.00 0.00 0 0.00
FORMWORK
E Edge of concrete base; exceeding 250mm but not 0.00 0.00 0 0.00
exceeding 500mm wide m 10 22.50 225.00
D2/RET/10
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
EXCAVATION
B Not exceeding 4.00m deep. m3 101 30.00 3,030.00 0.00 0.00 0 0.00
D 50mm thick blinding under concrete base m3 3 320.00 960.00 0.00 0.00 0 0.00
D2/RET/11
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 1,386 4.50 6,237.00 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 6 4.50 27.00 0.00 0.00 0 0.00
FORMWORK
D2/RET/12
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
EXCAVATION
B Not exceeding 4.00m deep. m3 230 30.00 6,900.00 0.00 0.00 0 0.00
E 50mm thick blinding under concrete base m3 5 320.00 1,600.00 0.00 0.00 0 0.00
D2/RET/13
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
REINFORCEMENT
In concrete base
A 20mm Diameter straight and bent bars kg 5,620 4.50 25,290.00 0.00 0.00 0 0.00
In concrete wall
B 20mm Diameter straight and bent bars kg 5,639 4.50 25,375.50 0.00 0.00 0 0.00
In toe beam
C 20mm Diameter straight and bent bars kg 407 4.50 1,831.50 0.00 0.00 0 0.00
D 20mm Diameter links, stirrups, binders and the like kg 1,032 4.50 4,644.00 0.00 0.00 0 0.00
FORMWORK
G Edge of concrete base; exceeding 250mm but not 0.00 0.00 0 0.00
exceeding 500mm wide m 58 22.50 1,305.00
D2/RET/14
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
EXCAVATION
D 50mm thick blinding under concrete base m3 2 320.00 640.00 0.00 0.00 0 0.00
D2/RET/15
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
REINFORCEMENT
In concrete base
A 16mm Diameter straight and bent bars kg 848 4.50 3,816.00 0.00 0.00 0 0.00
In concrete wall
B 10mm Diameter straight and bent bars kg 4 4.50 18.00 0.00 0.00 0 0.00
FORMWORK
E Edge of concrete base; exceeding 250mm but not 0.00 0.00 0 0.00
exceeding 500mm wide m 36 22.50 810.00
TESTING
D2/RET/16
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes :
D2/RET/17
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes : (Cont'd)
D2/RET/18
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes : (Cont'd)
Preamble
A Allow for ground water level was established below
existing ground level which shall be designated at the
pre-contract water level ITEM 1 1,000.00 1,000.00 0.00 0.00 0 0.00
Maintaining on site
D2/RET/19
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes :- (Cont'd)
PRELIMINARY PILES
C 250 mm x 250mm extension pile in 6m length m 144 80.70 11,620.80 0.00 0.00 0 0.00
D 250 mm x 250mm initial pile in 12m length Nos. 12 12.00 144.00 0.00 0.00 0 0.00
E 250 mm x 250mm extension pile in 6m length Nos. 24 9.00 216.00 0.00 0.00 0 0.00
F 250mm x 250mm pile, in 12 metre length m 144 25.00 3,600.00 0.00 0.00 0 0.00
G 250mm x 250mm pile, in 6 metre length m 144 25.00 3,600.00 0.00 0.00 0 0.00
288
Jointing with continuous 12m fillet weld all round for
connecting in position driven pile with extension pile
including painting with two coats of approved
bituminous paint to exposed surfaces of welded
plates
D2/RET/20
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes :- (Cont'd)
WORKING PILES
B 250 mm x 250mm initial pile in 12m length with 0.00 0.00 0 0.00
pointed mild steel plate pile shoe Nos. 1,258 652.20 820,467.60
C 250 mm x 250mm extension pile in 6m length m 15,096 77.10 1,163,901.60 0.00 0.00 0 0.00
D 250 mm x 250mm initial pile in 12m length Nos. 1,258 12.00 15,096.00 0.00 0.00 0 0.00
E 250 mm x 250mm extension pile in 6m length Nos. 2,516 9.00 22,644.00 0.00 0.00 0 0.00
F Initial pile, in 12 metre length m 15,096 17.50 264,180.00 0.00 0.00 0 0.00
G Extension pile, in 6 metre length m 15,096 17.50 264,180.00 0.00 0.00 0 0.00
30,192
D2/RET/21
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes :- (Cont'd)
A 250mm X 250mm pile Nos. 2,516 22.50 56,610.00 0.00 0.00 0 0.00
Cut-off top, strip and dispose all surplus length of 0.00 0.00 0 0.00
precast reinforced concrete pile including all
necessary excavation and backfilling, all bending and
anchoring steel bars to pile caps and any
reinforcement and concrete by Engineer's approval
Nos. 1,258 50.00 62,900.00
TESTING
D 250mm X 250mm precast reinforced concrete piles Nos. 10 1,250.00 12,500.00 0.00 0.00 0 0.00
D2/RET/22
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes:
D2/RET/23
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
Notes : (Cont'd)
A Not exceeding 4.00m deep, for RS wall base m3 50 10.00 500.00 0.00 0.00 0 0.00
B Not exceeding 6.00m deep, for RS wall base m3 1,157 10.00 11,570.00 0.00 0.00 0 0.00
C Not exceeding 9.00m deep, for RS wall base m3 2,307 10.00 23,070.00 0.00 0.00 0 0.00
D Not exceeding 12.00m deep, for RS wall base m3 3,242 10.00 32,420.00 0.00 0.00 0 0.00
D2/RET/24
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
C 50mm thick blinding under concrete base m3 82 320.00 26,240.00 0.00 0.00 0 0.00
D Concrete base (500mm thick) m3 815 340.00 277,100.00 0.00 0.00 0 0.00
REINFORCEMENT
In concrete base
E 16mm Diameter straight and bent bars kg 45,139 4.50 203,125.50 0.00 0.00 0 0.00
F 20mm Diameter dowel bars kg 1,136 4.50 5,112.00 0.00 0.00 0 0.00
FORMWORK
D2/RET/25
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
B Height of wall not exceeding 4.0m high m2 18 266.00 4,788.00 0.00 0.00 0 0.00
C Height of wall not exceeding 6.0m high m2 437 266.00 116,242.00 0.00 0.00 0 0.00
D Height of wall not exceeding 9.0m high m2 597 266.00 158,802.00 0.00 0.00 0 0.00
E Height of wall not exceeding 12.0m high m2 637 266.00 169,442.00 0.00 0.00 0 0.00
TESTING
D2/RET/26
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Retaining Wall & Reinforced Soil Wall
COLLECTION
D2/RET/27
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Roads, Carparks and Hardstanding
GENERAL NOTES
ROADS
D3/RW/1
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Roads, Carparks and Hardstanding
PAVEMENT
ROAD KERBS
D3/RW/2
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Roads, Carparks and Hardstanding
WHEEL STOPPER
TRAFFIC SIGN
B "STOP AT INTERSECTION" traffic road signs RP. 1 Nos. 8 500.00 4,000.00 0.00 0.00 0 0.00
D "PARKING" traffic road signs GI.4 Nos. 11 500.00 5,500.00 0.00 0.00 0 0.00
E "PEDESTRIAN CROSSING" traffic road signs WD.14 Nos. 3 500.00 1,500.00 0.00 0.00 0 0.00
F "GIVE WAY" traffic road signs RP.13 Nos. 1 500.00 500.00 0.00 0.00 0 0.00
G "RIGHT TURN ONLY" traffic road signs RM.1d Nos. 1 500.00 500.00 0.00 0.00 0 0.00
D3/RW/3
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Roads, Carparks and Hardstanding
ROAD MARKING
C Straight and Left or Right turn direction arrow Nos. 13 130.00 1,690.00 0.00 0.00 0 0.00
D Left or Right turn direction arrow Nos. 7 100.00 700.00 0.00 0.00 0 0.00
F Edge Line (Type 6) - 150mm wide m 1,100 6.75 7,425.00 0.00 0.00 0 0.00
G Stop Line (Type 7) - 300mm wide m 31 13.50 418.50 0.00 0.00 0 0.00
H Pedestrian Crossing (Zebra) (Type 9) - 600mm wide m 105 36.00 3,780.00 0.00 0.00 0 0.00
I Yellow Box Markings (Type 15) - 600mm wide m 60 36.00 2,160.00 0.00 0.00 0 0.00
J Carpark Lines - 100mm wide m 2947 4.50 13,261.50 0.00 0.00 0 0.00
GUARD RAIL
D3/RW/4
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Roads, Carparks and Hardstanding
COLLECTION
D3/RW/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
GENERAL NOTES
A Maximum depth not exceeding 2.00m m3 1,388 20.00 27,760.00 0.00 0.00 0 0.00
D4/DR/1
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
D4/DR/2
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
E 150mm Diameter UPVC pipe m 379 80.00 30,320.00 0.00 0.00 0 0.00
D4/DR/3
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
A Overall size 750mm width to falls on concrete base m 234 90.00 21,060.00 0.00 0.00 0 0.00
C Overall size 900mm width m 1,115 295.00 328,925.00 0.00 0.00 0 0.00
D4/DR/4
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
B Overall size 600mm width x 600mm deep m 377 185.00 69,745.00 0.00 0.00 0 0.00
C Overall size 750mm width x 750mm deep m 61 230.00 14,030.00 0.00 0.00 0 0.00
D Overall size 900mm width x 900mm deep m 3 250.00 750.00 0.00 0.00 0 0.00
D4/DR/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
BOX CULVERT
BERM DRAIN
D4/DR/6
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
CASCADING DRAIN
A Exceeding 0.9m but not exceeding 1.2m m 11 295.00 3,245.00 0.00 0.00 0 0.00
B Exceeding 1.2m but not exceeding 1.5m m 20 350.00 7,000.00 0.00 0.00 0 0.00
BRICKWORK SUMP
C To invert level not exceeding 1.05m deep Nos. 8 400.00 3,200.00 0.00 0.00 0 0.00
D To invert level not exceeding 1.05m deep Nos. 57 450.00 25,650.00 0.00 0.00 0 0.00
F To invert level not exceeding 1.05m deep Nos. 7 600.00 4,200.00 0.00 0.00 0 0.00
D4/DR/7
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
BRICKWORK SUMP
B Overall size 600mm x 600mm for Brick Sump (S1) Nos. 8 360.00 2,880.00 0.00 0.00 0 0.00
C Overall size 750mm x 750mm for Brick Sump (S2) Nos. 67 562.50 37,687.50 0.00 0.00 0 0.00
D Overall size 900mm x 900mm for Brick Sump (S3) Nos. 13 810.00 10,530.00 0.00 0.00 0 0.00
E Overall size 1050mm x 1050mm for Brick Sump (S4) Nos. 7 1,102.50 7,717.50 0.00 0.00 0 0.00
F Overall size 450mm x 450mm for Brick Sump (S6) Nos. 10 202.50 2,025.00 0.00 0.00 0 0.00
D4/DR/8
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
RC SUMP
RC sump, constructed of reinforced concrete base
and wall with and including all necessary temporary
shoring/strutting works, excavation, backfilling, 50mm
thick lean concrete Grade C20/25, 200mm thick
concrete base and walls (Grade C30/37), T12 @
150mm centres rebar reinforcement, formwork,
corrugated stainless steel steps, etc., and other
associated works all as shown on the Engineer's
drawing and remove surplus excavated material away
from Site :-
C Extra over for forming 1600mm x 50mm outlet weir Nos. 1 100.00 100.00 0.00 0.00 0 0.00
D Extra over for forming 450mm diameter oulet orifice Nos. 1 100.00 100.00 0.00 0.00 0 0.00
E Overall size 1200mm x 1200mm for RC (S5) Nos. 4 1,440.00 5,760.00 0.00 0.00 0 0.00
F Overall size 1800mm x 1800mm for RC Sump (S6) Nos. 2 3,240.00 6,480.00 0.00 0.00 0 0.00
D4/DR/9
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
Testing
A Labour and material for jointing new drain or
culvert to existing drain and making good all works
disturbed Item 1 1,000.00 1,000.00 0.00 0.00 0 0.00
D4/DR/10
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Surface Water Drainage
COLLECTION
D4/DR/11
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Water Reticulation
EXCAVATION
D5/WR/1
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Water Reticulation
PIPE WORKS
C Extra Over for 150mm diameter 45 degree bend Nos. 1 600.00 600.00 0.00 0.00 0 0.00
D Extra Over for 150mm diameter 60 degree bend Nos. 1 700.00 700.00 0.00 0.00 0 0.00
E Extra Over for 150mm diameter 90 degree bend Nos. 12 800.00 9,600.00 0.00 0.00 0 0.00
F Extra Over for 150mm x 150mm x 150mm equal tee Nos. 6 1,000.00 6,000.00 0.00 0.00 0 0.00
H Thrust block to 150mm diameter 45 degree bend Nos. 1 100.00 100.00 0.00 0.00 0 0.00
I Thrust block to 150mm diameter 60 degree bend Nos. 1 100.00 100.00 0.00 0.00 0 0.00
J Thrust block to 150mm diameter 90 degree bend Nos. 12 100.00 1,200.00 0.00 0.00 0 0.00
K Thrust block to 150mm x 150mm x 150mm equal tee Nos. 6 100.00 600.00 0.00 0.00 0 0.00
D5/WR/2
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Water Reticulation
PIPE CROSSING
PILLAR HYDRANT
D5/WR/3
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Water Reticulation
MARKER POST
D Allow for the supply of all labour, materials and tools for
the tapping-off of the water supply from the local
authority main to water reticulation pipe including all
necessary clamp and saddle, gate valve, short pipe,
flange adaptor, flange joints, equal tee and joint, special
fittings, all necessary excavation, backfilling etc. to
complete the whole works including obtaining
approval method of tapping-off, paying fees, attending
and liasing with the Local Authorities concerned
Item 1 3,000.00 3,000.00
TESTING
D5/WR/4
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Water Reticulation
COLLECTION
D5/WR/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
GENERAL NOTES
A Maximum depth not exceeding 2.00m m 117 20.00 2,340.00 0.00 0.00 0 0.00
B Maximum depth not exceeding 2.00m m 264 23.00 6,072.00 0.00 0.00 0 0.00
C Maximum depth not exceeding 4.00m m 26 28.00 728.00 0.00 0.00 0 0.00
D6/SW/1
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
CLASS A BEDDING
CLASS B BEDDING
D6/SW/2
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
PIPEWORKS
C To invert 1.20m depth (MH7, 8, 9) Nos. 3 1,600.00 4,800.00 0.00 0.00 0 0.00
D To invert 1.23m depth (MH1) Nos. 1 1,600.00 1,600.00 0.00 0.00 0 0.00
E To invert 1.32m depth (MH2, 10) Nos. 2 1,600.00 3,200.00 0.00 0.00 0 0.00
F To invert 1.35m depth (MH3) Nos. 1 2,000.00 2,000.00 0.00 0.00 0 0.00
G To invert 1.41m depth (MH4, 11) Nos. 2 2,000.00 4,000.00 0.00 0.00 0 0.00
D6/SW/3
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
A To invert 1.44m depth (MH12) Nos. 1 2,000.00 2,000.00 0.00 0.00 0 0.00
B To invert 1.46m depth (MH13) Nos. 1 2,000.00 2,000.00 0.00 0.00 0 0.00
C To invert 1.57m depth (MH6) Nos. 1 2,500.00 2,500.00 0.00 0.00 0 0.00
D To invert 1.66m depth (MH5) Nos. 1 2,500.00 2,500.00 0.00 0.00 0 0.00
E To invert 1.73m depth (MH14) Nos. 1 2,500.00 2,500.00 0.00 0.00 0 0.00
F To invert 1.89m depth (MH15) Nos. 1 2,800.00 2,800.00 0.00 0.00 0 0.00
G To invert 1.94m depth (MH16) Nos. 1 2,800.00 2,800.00 0.00 0.00 0 0.00
MANHOLE COVER
D6/SW/4
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
INSPECTION CHAMBER
A To invert 0.90m depth (IC1, 7, 8, 9, 11, 13, 17) Nos. 7 888.00 6,216.00 0.00 0.00 0 0.00
B To invert 0.93m depth (IC10, 14) Nos. 2 888.00 1,776.00 0.00 0.00 0 0.00
C To invert 0.94m depth (IC2, 6, 12) Nos. 3 888.00 2,664.00 0.00 0.00 0 0.00
D To invert 0.96m depth (IC18) Nos. 1 888.00 888.00 0.00 0.00 0 0.00
E To invert 0.97m depth (IC15) Nos. 1 888.00 888.00 0.00 0.00 0 0.00
F To invert 1.00m depth (IC3) Nos. 1 950.00 950.00 0.00 0.00 0 0.00
G To invert 1.02m depth (IC16) Nos. 1 950.00 950.00 0.00 0.00 0 0.00
H To invert 1.04m depth (IC4) Nos. 1 950.00 950.00 0.00 0.00 0 0.00
I To invert 1.07m depth (IC5) Nos. 1 950.00 950.00 0.00 0.00 0 0.00
D6/SW/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
TESTING
D6/SW/6
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Sewerage Reticulation
COLLECTION
D6/SW/7
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
GENERAL NOTES
D7/TU/8
JPN NEGERI SEMBILAN
WORKS AND ANCILLARY BUILDINGS
Turfing
TOTAL
(RM)
0.00
0.00
0.00
0.00
D7/TU/9
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
GENERAL NOTES
I DECORATIVE FENCING
( all as peer Engineer Drawing No.
JKR/CKAS/12/135/N21/042/K/PEL/1)
EXCAVATION
A Maximum depth not exceeding 2.00m m3 37 20.00 740.00 0.00 0.00 0 0.00
D8/FG/10
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
REINFORCEMENT
In foundation base
F 16mm Diameter straight and bent bars kg 563 4.50 2,533.50 0.00 0.00 0 0.00
In foundation wall
G 16mm Diameter straight and bent bars kg 785 4.50 3,532.50 0.00 0.00 0 0.00
In column
H 12mm Diameter straight and bent bars kg 18 4.50 81.00 0.00 0.00 0 0.00
D8/FG/11
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
REINFORCEMENT
In beam
A 12mm Diameter straight and bent starter bars kg 28 4.50 126.00 0.00 0.00 0 0.00
In coping
C 10mm Diameter straight and bent starter bars kg 56 4.50 252.00 0.00 0.00 0 0.00
FORMWORK
Class F1 formwork
D8/FG/12
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
II SLIDING GATE
(all as per Engineer Drawing No.
JKR/CKAS/12/135/N21/042/K/PEL/02)
EXCAVATION
A Maximum depth not exceeding 2.00m m3 60 20.00 1,200.00 0.00 0.00 0 0.00
D8/FG/13
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
REINFORCEMENT
In foundation base
A 16mm Diameter straight and bent bars kg 908 4.50 4,086.00 0.00 0.00 0 0.00
In foundation wall
B 16mm Diameter straight and bent bars kg 1,270 4.50 5,715.00 0.00 0.00 0 0.00
In column
C 16mm Diameter straight and bent bars kg 69 4.50 310.50 0.00 0.00 0 0.00
In beam
E 12mm Diameter straight and bent starter bars kg 22 4.50 99.00 0.00 0.00 0 0.00
D8/FG/14
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
FORMWORK
Class F1 formwork
D8/FG/15
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
IV SIDE GATE
D8/FG/16
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
D8/FG/17
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
VI FLAG POLE
D8/FG/18
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Fencing and Gates
COLLECTION
D8/FG/19
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
GENERAL NOTES
EXCAVATION
A Maximum depth not exceeding 2.00m m3 9 20.00 180.00 0.00 0.00 0 0.00
In Foundation
D9/PK/20
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
REINFORCEMENT
In Pad footings
A 12mm Diameter straight and bent bars kg 84 4.50 378.00 0.00 0.00 0 0.00
D 10mm Diameter links, stirrups, binders and the like kg 25 4.50 112.50 0.00 0.00 0 0.00
E 16mm Diameter straight and bent bars kg 46 4.50 207.00 0.00 0.00 0 0.00
FORMWORK
Class F1 formwork
_____________
H Carry out "Mackintosh Confirmatory Probes" as per
Specification to maximum depth from natural ground
or water bed with minimum 0.5m and at least or more
than 30blows/300mm before construction of pad
foundation Nos. 3 100.00 300.00 0.00 0.00 0 0.00
D9/PK/21
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
II FRAME
STEELWORKS
D9/PK/22
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
II FRAME (CONT'D)
STEELWORKS (CONT'D)
D9/PK/23
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
STEELWORKS
D9/PK/24
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
STEELWORKS (CONT'D)
D9/PK/25
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
ROOF COVERING
D9/PK/26
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Kereta Berbumbung
COLLECTION
D9/PK/27
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
GENERAL NOTES
EXCAVATION
A Maximum depth not exceeding 1.00m m3 29 20.00 580.00 0.00 0.00 0 0.00
B Maximum depth not exceeding 4.00m m3 250 20.00 5,000.00 0.00 0.00 0 0.00
C Maximum depth not exceeding 1.00m m3 10 20.00 200.00 0.00 0.00 0 0.00
SURFACE TREATMENT
D10/PB/28
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
In Foundation
In Bed
REINFORCEMENT
H 10mm Diameter links, stirrups, binders and the like kg 476 4.50 2,142.00 0.00 0.00 0 0.00
I 16mm Diameter straight and bent bars kg 2,927 4.50 13,171.50 0.00 0.00 0 0.00
K 20mm Diameter starter bars kg 228 4.50 1,026.00 0.00 0.00 0 0.00
D10/PB/29
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
REINFORCEMENT (CONT'D)
High yield steel bar reinforcement to MS 146 as
specified (Cont'd)
A 10mm Diameter links, stirrups, binders and the like kg 119 4.50 535.50 0.00 0.00 0 0.00
B 20mm Diameter straight and bent bars kg 221 4.50 994.50 0.00 0.00 0 0.00
In Bed
C 10mm Diameter straight and bent bars kg 1,760 4.50 7,920.00 0.00 0.00 0 0.00
In Ground Beam
D 10mm Diameter links, stirrups, binders and the like kg 457 4.50 2,056.50 0.00 0.00 0 0.00
E 16mm Diameter straight and bent bars kg 173 4.50 778.50 0.00 0.00 0 0.00
FORMWORK
Class F1 formwork
J Edge of bed; not exceeding 250mm high m 46 11.25 517.50 0.00 0.00 0 0.00
_________________
K Carry out "Mackintosh Confirmatory Probes" as per
Specification to maximum depth from natural ground
or water bed with minimum 0.5m and at least or more
than 30blows/300mm before construction of pad
foundation Nos. 6 100.00 600.00 0.00 0.00 0 0.00
SUNDIRES
D10/PB/30
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
STEELWORKS
D10/PB/31
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
STEELWORKS
Notes:
a) Mill Certificates
b) Shop and Erection Drawings
c) Method Statements for Erection
d) Laporan Ujian dan Pemeriksaan Bahan
D10/PB/32
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
STEELWORKS (CONT'D)
B 12mm diameter sag rod kg 104 10.00 1,040.00 0.00 0.00 0 0.00
D10/PB/33
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
STEELWORKS (CONT'D)
D10/PB/34
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
STEELWORKS (CONT'D)
D10/PB/35
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
ROOF COVERING
A Roofing laid to 1.5 degrees pitch m2 128 80.00 10,240.00 0.00 0.00 0 0.00
D10/PB/36
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
C Extra Over for bend Nos. 2 20.00 40.00 0.00 0.00 0 0.00
D Extra Over for shoe Nos. 2 20.00 40.00 0.00 0.00 0 0.00
E Extra Over for swan neck Nos. 2 20.00 40.00 0.00 0.00 0 0.00
D10/PB/37
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
V EXTERNAL WALL
A Overall size 7750mm x 800mm high louvres Nos. 1 2,170.00 2,170.00 0.00 0.00 0 0.00
B Overall size 7750mm x 1050mm high louvres Nos. 1 2,848.10 2,848.10 0.00 0.00 0 0.00
C Overall size 9750mm x 930mm high louvres Nos. 2 3,510.00 7,020.00 0.00 0.00 0 0.00
VI EXTERNAL FINISHES
D10/PB/38
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Parkir Bas
COLLECTION
D10/PB/39
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
GENERAL NOTES
EXCAVATION
SURFACE TREATMENT
C Laid on all earth in contact with the building structure Item 650.00
and provide with a five (5) year written guarantee
aganinst termite attack (Approximate flat surface area
D 130m2)
300mm Thick hardcore under floor; of dry broken m2 130 #REF! #REF!
stone, spread and levelled, well consolidated,
watered and blinded with sand to receive lean
concrete
D10/PB/40
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM #REF!
In Bed
REINFORCEMENT
In Pad Footings
To Collection RM #REF!
D10/PB/41
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
A 16mm Diameter links, stirrups, binders and the like kg 192 #REF! #REF!
In Bed
FORMWORK
Class F1 formwork
SUNDIRES
To Collection RM #REF!
D10/PB/42
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
FRAME
II
STEELWORKS
kg 5 #REF! #REF!
B 32mm~62mm x 155mm x 6mm Thick stiffener plate,
welded
C 850mm x 400mm x 10mm Thick mild steel base
plate, welded and bolted kg 102 #REF! #REF!
To Collection RM #REF!
D10/PB/43
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
STEELWORKS
Notes:
a) Mill Certificates
b) Shop and Erection Drawings
c) Method Statements for Erection
d) Laporan Ujian dan Pemeriksaan Bahan
To Collection RM 0.00
D10/PB/44
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
STEELWORKS (CONT'D)
D10/PB/45
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM 40,000.00
STEELWORKS (CONT'D)
D10/PB/46
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM 3,000.00
ROOF COVERING
D10/PB/47
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM #REF!
D10/PB/48
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
m 10 260.00 2,600.00
D10/PB/49
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM 5,210.00
V EXTERNAL WALL
VI EXTERNAL FINISHES
D10/PB/50
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
To Collection RM 34,400.00
COLLECTION
D10/PB/51
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ASSOCIATED WORKS
Parkir Bas
D10/PB/52
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Underground OSD Tank
GENERAL NOTES
EXCAVATION
A Maximum depth not exceeding 4.00m m3 2,562 10.00 25,620.00 0.00 0.00 0 0.00
D11/OSD/53
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Underground OSD Tank
B 250mm Thick as OSD top slab m3 239 345.00 82,455.00 0.00 0.00 0 0.00
REINFORCEMENT
E 12mm Diameter straight and bent bars kg 3,091 4.50 13,909.50 0.00 0.00 0 0.00
H 12mm Diameter straight and bent bars kg 13,921 4.50 62,644.50 0.00 0.00 0 0.00
In OSD walls
K 12mm Diameter straight and bent bars kg 33,083 4.50 148,873.50 0.00 0.00 0 0.00
D11/OSD/54
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Underground OSD Tank
REINFORCEMENT
In OSD beam
A 12mm Diameter straight and bent bars kg 409 4.50 1,840.50 0.00 0.00 0 0.00
C 12mm Diameter links, stirrups, binders and the like kg 1,360 4.50 6,120.00 0.00 0.00 0 0.00
FORMWORK
Class F1 formwork
D Horizontal soffits of OSD top slab m2 813 40.00 32,520.00 0.00 0.00 0 0.00
F Sides and soffit of OSD beam m2 108 45.00 4,860.00 0.00 0.00 0 0.00
G Edge of OSD base slab; not exceeding 250mm high m 134 11.25 1,507.50 0.00 0.00 0 0.00
H Edge of OSD top slab; ditto m 134 11.25 1,507.50 0.00 0.00 0 0.00
D11/OSD/55
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Underground OSD Tank
D11/OSD/56
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Underground OSD Tank
COLLECTION
D11/OSD/57
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
PREAMBLE NOTES
D12/WOSB/1
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
ROADWORKS
RESURFACING ROADS
D12/WOSB/2
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
ROADWORKS (CONT'D)
PAVEMENT
ROAD KERBS
D12/WOSB/3
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
ROADWORKS (CONT'D)
TRAFFIC SIGN
B "CAUTION" traffic road signs WD.16 Nos. 1 500.00 500.00 0.00 0.00 0
C "GIVE WAY" traffic road signs RP.13 Nos. 1 500.00 500.00 0.00 0.00 0
ROAD MARKING
F Straight and Left or Right turn direction arrow Nos. 1 220.00 220.00 0.00 0.00 0
G Left or Right turn direction arrow Nos. 4 150.00 600.00 0.00 0.00 0
I Edge Line (Type 6) - 150mm wide m 189 6.00 1,134.00 0.00 0.00 0
D12/WOSB/4
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
ROADWORKS (CONT'D)
TRAFFIC DIVERSION
D12/WOSB/5
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
ROADWORKS (CONT'D)
D12/WOSB/6
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
A Maximum depth not exceeding 2.00m m3 105 20.00 2,100.00 0.00 0.00 0
D12/WOSB/7
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
A Overall size 750mm width x 750mm deep m 2 250.00 500.00 0.00 0.00 0
BOX CULVERT
TESTING
D12/WOSB/8
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
BRICKWORK SUMP
D12/WOSB/9
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
RC SUMP
B Overall size 1200mm x 1200mm for RC Sump(S5) Nos. 3 1,300.00 3,900.00 0.00 0.00 0
0.00 0.00 0
TESTING
D12/WOSB/10
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
WATER RETICULATION
EXCAVATION
D12/WOSB/11
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
PIPE WORKS
B Extra Over for 150mm diameter 90 degree bend Nos. 2 9,600.00 19,200.00 0.00 0.00 0
C Thrust block to 150mm diameter 90 degree bend Nos. 2 180.00 360.00 0.00 0.00 0
MARKER POST
PIPE JACKING
D12/WOSB/12
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TESTING
D12/WOSB/13
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
SEWERAGE
EXCAVATION
CLASS A BEDDING
D12/WOSB/14
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
SEWERAGE (CONT'D)
PIPEWORKS
D12/WOSB/15
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
SEWERAGE (CONT'D)
MANHOLE COVER
D12/WOSB/16
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
SEWERAGE (CONT'D)
Testing
D12/WOSB/17
JPN NEGERI SEMBILAN
BILL D - EXTERNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
COLLECTION
D12/WOSB/18
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
D12/WOSB/19
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/20
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/21
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/22
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/23
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/24
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/25
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
D12/WOSB/26
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
D12/WOSB/27
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/28
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
D12/WOSB/29
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/30
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/31
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
D12/WOSB/32
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
D12/WOSB/33
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
D12/WOSB/34
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
D12/WOSB/35
JPN NEGERI SEMBILAN
RNAL WORKS AND ANCILLARY BUILDINGS
Works Outside Site Boundary
TOTAL
(RM)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
D12/WOSB/36