PROFORMA-B

PRICE SCHEDULE

IFB No. CBI9608P22


DESCRIPTION OF SERVICE: Hiring of Coring Services along with Consumables and the Coring experts for taking Conventional Cores in 8.1/2" Hole
predominately in Shale and Sand Stone formation during drilling for a period of 2(two) years, with a provision for extension by 1(one) year at the same rates, terms
and conditions for ODISHA MAHANADI ONSHORE BLOCK MN-ONHP-2018/1/2/3/4/5

CURRENCY OF QUOTE: INDIAN RUPEES


NAME OF THE BIDDER NOV INDIA PRIVATE Limited

Bidder's GSTN No. 22AADCR4279E1Z9


SAC Code 998621
AA EQUIPMENT & PERSONNEL CHARGES
TOTAL
UNIT ESTD.
ESTD. ESTD.
SL. RATE NOV GST % AMOUNT INCLUDING GST
PARTICULARS UNIT QTY. AMOUNT
NO. (Rs.) (Rs.)
(Rs.)
X Y X*Y Z T

Mobilization charges of Coring Tools / Equipment


1 /Consumables/ Accessories including the items for Lump sum 1 337500 337500 12% 378000
core handling and core bit

Demobilization charges of Coring Tools / Equipment /


2 Consumables / Accessories including the items for Lump sum 1 270000 270000 12% 302400
core handling and core bit

SDR for Coring Tools/ equipment/accessories


3 Per Day 650 5625 3656250 12% 4095000
including coring bit

ODR for Coring Tools / equipment/accessories


4 Per Day 80 22500 1800000 12% 2016000
including coring bit

Mobilization charges for personnel (Coring


5 Lump sum 12 375000 4500000 12% 5040000
Personnel) (On call out basis)

Demobilization charges for personnel (Coring


6 Lump sum 12 75000 900000 12% 1008000
Personnel) (On call out)
7 ODRP for personnel (Coring Personnel) Per Day 80 52500 4200000 12% 4704000
8 SDRP for personnel (Coring Personnel) Per Day 80 28125 2250000 12% 2520000

Interim demobilization of Coring Tools / Equipment /


9 Consumables / Accessories including the items for Lump sum 2 183750 367500 12% 411600
core handling and core bit.

Interim remobilization of Coring Tools/Equipment/


10 Consumables/Accessories including the items for core Lump sum 2 183750 367500 12% 411600
handling and core bit.

Charges for extraction, handling, preservation &


11 Per m 180 7500 1350000 12% 1512000
packaging of core. (Inclusive of Core gamma)

TOTAL VALUE OF ‘AA’ 22398600


PROFORMA-B
PRICE SCHEDULE

IFB No. CBI9608P22


DESCRIPTION OF SERVICE: Hiring of Coring Services along with Consumables and the Coring experts for taking Conventional Cores in 8.1/2" Hole
predominately in Shale and Sand Stone formation during drilling for a period of 2(two) years, with a provision for extension by 1(one) year at the same rates, terms
and conditions for ODISHA MAHANADI ONSHORE BLOCK MN-ONHP-2018/1/2/3/4/5

CURRENCY OF QUOTE: INDIAN RUPEES


NAME OF THE BIDDER NOV INDIA PRIVATE Limited

Bidder's GSTN No. 22AADCR4279E1Z9


SAC Code 998621
BB CONSUMABLES
TOTAL
UNIT ESTD.
SL. ESTD. ESTD.
PARTICULARS UNIT RATE GST % AMOUNT INCLUDING GST
QTY. AMOUNT
(Rs.) (Rs.)
NO (Rs.)
X Y X*Y Z T
Cost of Aluminium Inner tubes and Accessories (30
12 No 20 217500 4350000 12% 4872000
feet of each length)

Other Consumables per 9 meters (Core Saw Blade,


End Caps with Suitable clips, Wooden Core Boxes to
13 Lump Sum 20 22500 450000 12% 504000
pack 1m Core Cut, Upper Half Shoe, Lower Half
Shoe, HD Core Catcher and any other items)

TOTAL VALUE OF “BB” 5376000

CC =AA + BB 27774600
GRAND TOTAL COST OF CORING SERVICES FOR 2(TWO) YEARS INCLUSIVE OF ALL TAXES & DUTIES (INCLUDING
APPLICABLE GST) BUT EXCLUDING BASIC CUSTOMS DUTY WHICH SHALL BE EXTRA TO OIL’S ACCOUNT
27774600
Two Crore Seventy Seven Lakh Seventy Four Thousand Six Hundred Only
(TO BE CONSIDERED FOR BID EVALUATION)
NOTE:
1) The items mentioned in above clause are to be read in conjunction with Schedule of Rates- Section IV, Part -3.

2) The quantities shown above against each item in the Price Bid Schedule are for evaluation purpose only. However, quantities may vary in actual as per Company’s requirement and
payment will be made on actuals only.

3)Bidders shall quote for all the items.

4)Total Contract cost (CC) for 2(two) years includes all taxes & duties including goods and service tax (GST) but except basic customs duty which shall be extra to OIL if applicable.

5)The Mobilization Charges of the TOOLS/EQUIPMENT/CONSUMABLES WITH ALL ACCESSORIES should not exceed 2.5% of the total quoted value in the Price Bid. However, the
Mobilization charges if quoted in excess of 2.5% of the total quoted value in the Price Bid, the excess amount shall be paid at the end of the Contract.

6)The De-Mobilization Charges of the TOOLS/EQUIPMENT/CONSUMABLES WITH ALL ACCESSORIES should not be less than 1% of the total quoted value in the Price Bid. However,
the De-mobilization charges if quoted in deficit or less than 1% of the total quoted value in the Price Bid, the differential amount will be kept on hold from the 1st invoice onwards and the
same will be paid at the end of the Contract along with Demobilization charges.

7)The total Interim Demobilization Charges quoted should not exceed 1.5% of the total quoted value in the Price Bid. However, the total Interim Demobilization charges if quoted in excess of
1.5% of the total quoted value in the Price Bid, the excess amount shall be paid at the end of the contract.

8)The total Interim Remobilization Charges quoted should not exceed 1.5% of the total quoted value in the Price Bid. However, the total Interim Remobilization charges if quoted in excess of
1.5% of the total quoted value in the Price Bid, the excess amount shall be paid at the end of the contract.

9) The quoted Unit Standby rate of tools/equipment/accessories must not exceed 60% of the quoted corresponding Unit Operating rate of tools/equipment/accessories in the Price Bid. In case
same is more than 60% of the quoted corresponding Unit Operating rate then evaluation will be done based on the prices/rates quoted by the bidder(s) but in case of award of Contract and
payment Unit Standby rate for tools/equipment/accessories will be 60% of the quoted corresponding Unit Operating rate in the Price Bid.

10) Bidders to provide TSP (Thermally Stable Diamond Cutter cutting structure in Matrix body) core heads or PDC (suitable for coring in Formation Type 6/7 as per IADC Classification)
core heads considering medium hard and hard formations. However, bidder to recommend & use the best bit considering the well lithology.

11)Contractor should maintain a sufficient inventory of above-mentioned Core bits at site.

Authorized Person’s Signature: _________________

Name: _____Deepesh Tripathi__________________________