Professional Documents
Culture Documents
Author: Creation Date: Last Updated: Control Number: Version: Sangeeta Joshi Jan 28, 2012 Jan 28, 2012 VTL/Adv SCM/TE.040/Sourcing Draft 1a
Approvals: Onkar Singh Rohit Kapoor Project Manager, IBM VTL SCM VTL IT Rita Mallik
Copy Number
_____
ii
Document Control
Change Record
1
Date 28-Jan-12
Version Draft 1a
Reviewers
Name
Position
Distribution
Copy No. 1 2 3 4 Name Library Master Location Project Library Project Managers
Note To Holders: If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes. If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.
iii
Foreword
Document Guidelines
Use this document to produce the System Test Scripts Oracle Sourcing deliverable.
iv
Contents
Document Control......................................................................................................................iii Foreword....................................................................................................................................iv Document Guidelines..........................................................................................................iv Sourcing Test Sequences.............................................................................................................6 Test Specification Creation of RFI .........................................................................................7 Test Specification Vendor Response against RFI...................................................................10 Test Specification Multiple Round RFI..................................................................................11 Test Specification Vendor Response to Second round of RFI................................................12 Test Specification: - Creation of RFQ from RFI........................................................................13 Test Specification: - Qutation Submission against RFQ............................................................16 Test Specification Analysing the Quotations and Award Process...........................................18 Test Specification Creation of Auction...................................................................................20 Test Specification Bid Submission against Auction................................................................22 Test Specification Analysing the BIDs and Award Process. ..................................................23 Defect Log.................................................................................................................................26 Open and Closed Issues.............................................................................................................27 Open Issues........................................................................................................................27 Closed Issues......................................................................................................................27
Sourcing.1.0 Sourcing.2.0 Sourcing.3.0 Sourcing.4.0 Sourcing.5.0 Sourcing.6.0 Sourcing.7.0 Sourcing.8.0 Sourcing.9.0 Sourcing.10.0 Sourcing.11.0
Creation of RFI Vendor Response against RFI Multiple Round RFI Vendor Response to Second round of RFI Creation of RFQ from RFI Quotation submission against RFQ Analysing the Quotations and Award Process Creation of Auction Bid Submission against Auction Analysing the BIDs and Award Process Buyer Name Change on PO updation/revision Standard Reports Request Submission and query
Sourcing Buyer
Negotiation TAB-- Quick LinksCreateRFI-Header Give Title, Description, response Style information, bill to-ship to, payment term ,currency and other relevant information. The Collaboration team has sourcing buyer and his supervisor in collaboration team by default. Uncheck the approver checkbox. Provide notes to supplier, if any. Click Add Attachment to upload any file. Click Apply Negotiation TAB-- Quick LinksCreateRFILines Create line with Price/Qty. Click Go Give line information line type, Item code. Additional information like Target Price, Current Price, Need by-date etc can optionally be given.
Sourcing.1.2
If Item Code is given details like description, category UoM will default.
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Sourcing.1.3
Click Add Attribute List. Click Add Attachment to upload any file. Click Apply Negotiation TAB-- Quick LinksCreateRFI Control Give Preview date, Open date, Close Date. Also give response rules as per requirement. Check the check box for a) Allow multiple rounds of negotiation b) Allow multiple responses c) Allow manual extend when the negotiation is open d) Negotiation TAB-Quick LinksCreate RFISupplier Click ADD Supplier. Search the required supplier. Check the check box of required supplier. Click Add to invited Supplier. Click Apply
Sourcing.1.4 Sourcing.1.5
Create RFI number: Review page opens Confirmation RFI has been Published.
Sourcing.1.6
Negotiation-> Quick Links -> Copy-> Give the search Criteria->Click Copy->Apply Copy the Order as a whole Copy a line to another
Confirmation This document has automatically been saved as a draft. This RFI has been copied from RFI Number.
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
existing Order
Sourcing 2 Sourcing.2.1
Supplier User
Vendor Response against RFI (Sourcing Supplier Responsibility) Negotiation TAB Check the RFI number in Your Companys Open Invitation. Click on RFI Number.
Action> Acknowledge Participation>Go Click Yes or No. Apply Action> Create Response>Go Give Header Information. Add Attachment Click Line TAB. Give Line Information including attribute information asked by buyer. Click Continue
Acknowledge notification send to buyer. Check Note Your Last Response will be considered. Confirmation upload of attachment
Notice Control Tab not available in supplier login. Create response: Review and Submit page. Confirmation. Response number for RFI number has been submitted. Buyer receives the notification of response submitted.
Sourcing.2.6
Click Submit
10
Sourcing 3
Sourcing Buyer
Sourcing.3.1
Negotiation TABPublished RFI detail Page opens Negotiations Click on RFI number.
Sourcing.3.2 Sourcing.3.3
Select Extend RFI from LoV of Extend RFI Page Opens. action menu. Click GO. Give New Close Date and Click on Apply User will receive a Confirmation: - AutoExtend settings for RFI are updated.
11
Sourcing 4 Sourcing.4.1
(Sourcing Supplier Responsibility) Click on negotiation number for which response has already submitted.
Sourcing.4.3 Sourcing.4.4
Select Create Response from LoV Create response page opens of action menu. Click GO. Give Header Information. Add Attachment Click Line TAB. Confirmation of attachment upload Notice Control Tab not available in supplier login.
Change response Information including attribute information asked by buyer. Create response: Review and Submit page. Click Continue Click Submit Confirmation. Response number for RFI number has been submitted. Buyer receives the notification of response submitted. Response History window will open and make sure status of earlier responses must be Archived. Latest one should be in Active status.
Sourcing.4.5
(Sourcing Buyer Responsibility) Negotiation TAB >Published Negotiations > Click on Responses
12
Sourcing Buyer Creation of RFQ from RFI (Sourcing Supplier Responsibility) Sourcing 5.1 Negotiation TAB-- Quick LinksCreateCopy Sourcing 5.2 Enter RFI number & Click on GO.
Copy Published Negotiation window will open. Same RFI will appear below GO button with few captions like Title, Close Date, Responses Status & Copy. Copy RFI window will open.
Select Document Type as RFQ and RFQ number will generate with click on Apply. following information as below :1. This Document has automatically been saved as a draft. 2. This RFQ has been Copied from RFI 3. RFQ form will generate with new RFQ number.
Sourcing 5.5
Negotiations>Header Give Title, Description, response Style information, bill to-ship to, payment term, currency and other relevant information.
Sourcing 5.6
Collaboration Team> Click on Add Member from Collaboration Another Row > name of member team will play the role according from LoV, Check the approver box to given access. (if require), Type of access from LoV.
13
Scenario Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Sourcing 5.7
Requirements > Select Scoring Setting> Check the Box for enable weight & Display Scoring criteria to supplier. Scoring Team> write name and Instructions for business. Click on Member icon and assign a name from LoV. Section Assignment >Select Team Assignment from LoV against section. Click on Save & Apply. Add Section > write Name of section >Apply and Add Requirement. Enter text in requirement box. Properties >select scoring method from LoV, Text, Max. Score, Knockout Score. Click on Apply. Click Add Attachment to upload any file. Click Apply Save as a Draft. It would save the RFQ. Header Add Section window will open. Header: Add Requirement RFQ will open Header > Requirement> section will appear with Target, Weight & Score value. Name from collaboration team will appear.
Sourcing 5.8
Negotiations>Lines >Create line from LoV of action menu. Click Go Give line information line type, Item code. Additional information like Target Price, Current Price, Need by-date etc can optionally be given.
If Item Code is given details like description, category UoM will default.
14
Scenario Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Click Add Attribute List. Click Add Attachment to upload any file. Click on Save as a Draft Negotiations> Control >Schedule Select Preview date, Open date, and Close date
Confirmation attachment has been added successfully. It will set the RFO open & Close date.
Sourcing 5.8
Response Rules > Check the required boxes and Save as a Draft.
Sourcing 5.9
Negotiations>Supplier>Invite Suppliers > Click on Add Supplier. Search Supplier and add to Invited Supplier and Register New supplier. Click on Apply & Review. Negotiations> Create RFQ > Publish
Supplier: Add Supplier window will open. Create Supplier window will open with all invited suppliers with their contact, e-mail. Confirmation :- RFQ has been Published
15
Vendor Response against RFQ (Sourcing Supplier Responsibility) Negotiation TAB Check the RFQ number in Your Companys Open Invitation. Click on RFQ Number.
Sourcing 6.2
Acknowledge notification send to buyer. Create Quote for RFQ will open and answer in Quote Value . Information will appear as Create Quote : Review and Submit
Sourcing 6.3
Negotiations>Action>Create Quote from LoV of action menu. Click Go Header >Requirement > Quote Value Line> enter Quote Price and click on Continue.
Give Header Information. Add Attachment Click Line TAB. Give Line Information including attribute information asked by buyer. Click Add Attachment to upload any file. Click Apply Click >Continue > Submit.
Confirmation upload
of
attachment
Notice Control Tab not available in supplier login. . Confirmation attachment has been added successfully. Create response: Review and Submit page. Confirmation : Quote for RFQ has been submitted
16
Scenario Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Sourcing 6.6
Negotiations> Published RFQ Close window will open Negotiation> Click on RFQ number. Confirmation:-The Close date Select Close RFQ from LoV of for RFQ has been updated. All action menu. Click GO. invited & participating suppliers have been notified via Check immediately to the close RFQ email. and click on Apply.
17
Sourcing 7.0 Sourcing Buyer (Sourcing Buyer Responsibility) Sourcing 7.1 Sourcing 7.2 Negotiations> Published Negotiations> RFQ, window will open. Click on Number (RFQ). Select Award by Quote from LoV of Award Summary window action menu. Click GO. will open and you can compare all quotations. Select Quote from Award Quote window and select supplier for Award Award Quote window will and click on Award tab. open Select Save Award from LoV of action menu. Click GO Select Complete Award from LoV of action menu. Click GO Confirmation:- Award for RFQ has been Saved as a draft. Complete Award window will open. Information: - You will not be able to make any changes to the award decision after you press submit. RFQ award complete and create purchase order window will open. Purchase Order Summary window will open. Information:-RFQ Purchase Order Summary (RFQ no.) Purchase order creation. Purchase Order Summary window will appear with Status, Purchase Order Number, Supplier, Supplier Site, Quote, PO total with Incomplete status.
Open and Closed Issues 18
Check the box for Create standard Purchase Order for this Negotiation and Click on Submit. Create Purchase Order > standard purchase Order details > Submit
Scenario Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Sourcing 7.3
> Purchase Order > Purchase Order summary > Purchase Order number.
VTL (MO) HO Purchasing Super User
19
Sourcing Buyer
Negotiation TAB-- Quick Links An Auction number will get CreateAuction--Header generated with the data entered. Give Title, Description, response Style information, bill to-ship to, payment term , currency and other relevant information. The Collaboration team has sourcing buyer and his supervisor in collaboration team by default. Uncheck the approver checkbox. Provide Notes to supplier, if any. Click Add Attachment to upload any file. Click Apply Confirmation attachment has been added successfully. If Item Code is given details like description, category UoM will default.
Sourcing 8.2
Negotiation TAB-- Quick Links CreateAuctionLinesCreate line with Price/Qty. Click Go Give line information line type, Item code. Additional information like Target Price, Current Price, Need by-date etc can optionally be given. Click Add Attribute List. Click Add Attachment to upload any file. Click Apply
Confirmation attachment
Company Confidential - For internal use only Open and Closed Issues 20
Scenario Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Sourcing 8.4
Negotiation TAB-- Quick Links CreateAuctionControl Give Preview date, Open date, Close Date. Also give response rules as per requirement. Check the check box for e) Allow multiple rounds of negotiation f) Allow multiple responses g) Allow manual extend when the negotiation is open h) Negotiation TAB-- Quick LinksCreateRFI Supplier Click ADD Supplier. Search the required supplier. Check the check box of required supplier. Click Add to invited Supplier. Click Apply
Create Auction number: Review page opens Confirmation Auction has been Published.
21
Supplier User
(Sourcing Supplier Responsibility) Negotiations> Your company open Invitations> Click on Number (Auction). Select Acknowledge Participation from LoV of action menu. Click GO. Check the box for participate and Click on Apply
Sourcing 9.2
Click Line TAB. Give Line Information including attribute information asked by buyer. Click Add Attachment to upload any file. Click Apply Click >Continue > Submit.
Notice Control Tab not available in supplier login. . Confirmation attachment has been added successfully. Confirmation : Bid for Auction has been submitted
22
Sourcing Buyer (Sourcing Buyer Responsibility) Negotiations> Published Negotiations> Click on Number (Auction). Select Analyze By Bid from LoV of action and Click GO. Select Close Auction from LoV of action and Click GO. i. Check the circle for close Negotiations j. Click on Apply Auction, window will open.
Sourcing 10.2
Analyze By Bid window will open. Close auction window will open. Confirmation The Close Date for Auction has been updated. All invited and participating suppliers have been notified via email. Award By Bid window will open with Closed status and compare the supplier bid.
Select Award By Bid from LoV of action and Click GO. Negotiations > Auction: number > Select Supplier for award. Click on Award tab Select Save Award from LoV of action and Click GO. Select Complete Award from LoV of action and Click GO.
Window will open for save award. Information You will not be able to make any changes to the award decision after you press Submit. Confirmation Auction Award Complete.
Open and Closed Issues 23
Scenari o Step
Test Step
Role
Action or Path
Expected Results
Actual Results
Status
Create Purchase Order window will open for this auction Sourcing 10.3 Negotiations > Auction: number > Create Purchase Order and Click on Submit tab Check the box for Create standard Purchase Order for this Negotiation and Click on Submit. Create Purchase Order > standard purchase Order details > Submit Purchase Order Summary window will open. Information:-RFQ Purchase Order Summary (RFQ no.) Purchase order creation. Purchase Order Summary window will appear with Status, Purchase Order Number, Supplier, Supplier Site, Quote, PO total with Incomplete status Purchase Order window will open.
Sourcing 10.4
> Purchase Order > Purchase Order summary > Purchase Order number.
VTL (MO) HO Purchasing Super User
24
25
Defect Log
Defect ID Number Test Step Reference Module Name Defect Description Resolution Re-Test By Re-Test Date Status (open, closed, in process)
Oracle Sourcing
26
Closed Issues
27