TransMilenio BRT system in Bogot, Colombia, holds a record 40,000 passengers per hour.
What is BRT?
Why BRT?
The goal of these systems is to approach the service quality of rail transit while still enjoying the cost savings and flexibility of bus transit.
Division of Responsibilities
1 2 3
Design
Elements of BRT
An operational plan Exclusive travel lanes and roadway enhancements Stations, park & rides Specialized vehicles Intelligent transportation systems Branding
EXISTING SITUATION
Population of Lahore Requirement 8 million High level of Transport movement Increased trip lengths
Intensity of development
EXISTING SITUATION
Road network:
Suffered with temporary and permanent encroachments
Traffic condition
Disorderly traffic
Traffic growth
Average growth rate of transportation modes Auto rickshaw 32% per annum Motorcycle 22% per annum Cars 20%per annum
Financial Issues
Attractiveness of service
Stretches in headway of buses due to traffic chaos Diversion of passengers to other modes
What is BRT?
An efficient rapid transit system using exclusive right of way lanes that match & support the rapidity and performance of metro systems but utilize bus technology which makes it cost effective.
Features
Exclusive right of way
Features
Rapid Boarding & alighting
Features
Pre-board fare collection and fare verification
Features
Free transfer between lines
BRT Service This type of BRT consists of a single route serving stations along a defined corridor. The route might operate in mixed traffic with some use of bus lanes and transit signal priority on a separate facility in a roadway median or unique corridor.
BRT Facility This form of BRT consists of purposebuilt infrastructure that is intended to be used by multiple routes. The infrastructure is usually a separate busway and can be fully grade separated or can accommodate at-grade intersections.
Service Structure and Route Types All-Stops or Mainline BRT Service Express or Limited Stop Service Routes Using a BRT Facility as Part of Their Route Counter-peak Direction Routes
Design Components
Geometric Design Criteria Typical Sections Boarding Configurations Station Design Traffic Signal System and Communications
Design Criteria
Typical ROW Width 99 ft Vehicle Lanes 12 ft Transit Lanes 11 ft Left Turn Lanes 10 ft Curb to ROW 11 ft min, 23.5 ft max Sidewalk Pedestrian Zone 6 ft min Parking Bay Width 8 ft Bike Lanes 5 ft Platform Width 12 ft Median Width 4 ft min, 12 ft max Shy Distance 1 ft
C OF ROAD L
Shyness Strip KERB & INLET/ OUTLET PIPE DRAIN AT REQUIRED DEPTH OF REQ. DIA
1.5%
2.0%
2.0%
2%
2%
2%
2%
2%
2%
2.0%
2.0%
1.5%
3000 PARKING
500 SEPARATOR
7000 CARRIAGEWAY
2500 FOOTPATH
2500 FOOTPATH
500 SEPARATOR
3000 PARKING
2000 DRAIN
/Public Conveniences
2% 2% 2.0% 2.0% 1.5%
1.5%
2.0%
2.0%
2%
2%
2%
2%
3000 PARKING
7000 CARRIAGEWAY
2500 FOOTPATH
C OF ROAD L
500 SEPARATOR
3000 PARKING
1.5%
PEDESTRIAN PATHWAY/ DRAIN 2000
1.5%
2000 PARKING/ DRAIN 2500 PARALLEL PARKING/ UTILITIES 7000 CARRIAGEWAY 2500 FOOTPATH 7000 MEDIAN BUS LANES 2500 FOOTPATH 7000 CARRIAGEWAY 2500 PARALLEL PARKING/ UTILITIES
40 m ROW
1.5%
PEDESTRIAN PATHWAY/ DRAIN 2000
1.5%
2000 PARKING/ DRAIN 2500 PARALLEL PARKING/ UTILITIES 7000 CARRIAGEWAY 2500 FOOTPATH 7000 MEDIAN BUS LANES 2500 FOOTPATH 7000 CARRIAGEWAY 2500 PARALLEL PARKING/ UTILITIES
1.5%
2000 PARKING/ DRAIN
1.5%
2000 PEDESTRIAN PATHWAY/ DRAIN
C OF ROAD L
C OF ROAD L
1.5%
PEDESTRIAN PATHWAY/ DRAIN 1500
1.5%
1500 PARKING/ DRAIN 2000 PARALLEL PARKING/ UTILITIES 6000 CARRIAGEWAY 2500 FOOTPATH 7000 MEDIAN BUS LANES 2500 FOOTPATH 6000 CARRIAGEWAY 2000 PARALLEL PARKING/ UTILITIES
2.0 M Parking 6.0 M Mixed Traffic Lane 2.5 M Footpath/ Bus platform 7.0 M BRt Lane
35 m ROW
6500 1000
CARRIAGE WAY
2000
CYCLE TRACK
2000
PEDESTRIAN PATHWAY
30000
DESIGN ELEMENTS
DESIGN ELEMENTS
DESIGN ELEMENTS
DESIGN ELEMENTS
2m wide footpath
175mm high from bicycle track Additional width at junctions to cater to higher number of pedestrians Completely obstruction free; no hoardings, junction boxes etc.
DESIGN ELEMENTS