You are on page 1of 12

WORK AREAS

• Sewerage Treatment Plants


• Desalination Plants

Appendix-I Dammam City Sewerage Treatment Plant, Eastern


Province, Kingdom of Saudi Arabia.
Appendix-II Al-Khobar City Sewerage Treatment Plant, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-III Al-Azizia Desalination Plant, Al-Khobar, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-IV Al-Jubail Desalination Plant, Al-Jubail, Eastern
Province, Kingdom of Saudi Arabia.
Appendix-V PTA Combined Effluent Treatment Plant, Korangi
Tanneries, Korangi Industrial Area, Karachi
Pakistan.
Appendix-I
Appendix-I-1
DAMMAM CITY SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
Broader view
260 10’ 39.06’’ N
500 12’ 35.54’’ E

Inlet Structure =1
Aeration Tanks (Carousels) = 8
Clarifiers=8
Sludge Thichners =2
Screw Pump Stations = 4

Sea out-fall discharges = 250,000 m3/day Discharge BOD Loadings: 20-25mg/l O2

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The


plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, Waikfield, Mass, USA.
Appendix-I-2
DAMMAM SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia

260 10’ 39.06’’ N


500 12’ 35.54’’ E
Bird Eye view
STP Dammam

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The


plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-3
DAMMAM SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia

260 10’ 39.06’’ N


500 12’ 35.54’’ E

Tertiary Wastewater Treatment


Largest continuous flow Sand Filtration Facility in the world

Recently Equipped with 216 DynaSand® filters, will make Dammam the world's
largest continuous operated sand filter plant for tertiary treatment.
Appendix-I-4
DAMMAM SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia

260 10’ 39.06’’ N


500 12’ 35.54’’ E

Lagooning System of Wastewater Treatment


Aborted 1982-83

Sea Out-fall discharges = 200,000m3/day (before 1983)


Average BOD loading = 20 -25mg/litre O2

Aborted Lagoons
Appendix-I-5
DAMMAM SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia

260 10’ 39.06’’ N


500 12’ 35.54’’ E

Front view of Plant


Right corner Jubail-Ras Tanura Highway

Sea Out-fall Discharges = 250,000m3/day


Average BOD discharge loading = 20 -25mg/litre O2

• Wastewater Treatment by Aeration Lagoons aborted since 1982-83 . The


plant was designed and constructed by Ballast BV of Netherlands.
• Advance Wastewater Treatment by Activated Sludge System was
commissioned in late 1982 which was designed and constructed by Metcalf
and Eddy Incorp, waikfield, Mass, USA.
Appendix-I-6
DAMMAM CITY SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
260 10’ 39.06’’ N
500 12’ 35.54’’ E
Sludge Drying Beds
Left corner

Sludge Drying Beds Aeration Tanks


Appendix-II
Appendix-II-1

AL-KHOBAR CITY SEWERAGE TREATMENT PLANT


Eastern Province, Saudi Arabia

260 14’ 48.27’’ N


500 12’ 33.20’’ E
BROADER VIEW

Inlet Structure =1
Aeration Tanks (Carousels) = 6
Clarifiers=6
Sludge Thichners =2
Screw Pump Stations = 3

Sea Out-fall Discharges = 150,000m3/day


Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
Appendix-II-2
0 ’ ’’
26 14 48.27 N
500 12’ 33.20’’ E

Lagooning System of Wastewater Treatment


Aborted 1982-83

Sea Out-fall Discharges = 120,000m3/day (before 1983)


Average BOD discharge loading = 20 -25mg/litre O2
AL-KHOBAR SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
Appendix-II-3
0 ’ ’’
26 14 48.27 N
500 12’ 33.20’’ E
Zoom-in View

Sea Out-fall Discharges = 150,000m3/day


Average BOD discharge loading = 20 -25mg/litre O2
Aborted Lagoons

Sludge Thickner
Screw Pump Station Aeration Tanks

Final Clarifier
AL-KHOBAR SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
Appendix-II-4
0 ’ ’’
26 14 48.27 N
500 12’ 33.20’’ E

Sludge Drying Beds

Sea Out-fall Discharges = 150,000m3/day


Average BOD loading = 20 -25mg/litre O2

Sludge Drying Beds


AL-KHOBAR SEWERAGE TREATMENT PLANT
Eastern Province, Saudi Arabia
Appendix-II-5

260 14’ 48.27’’ N


500 12’ 33.20’’ E
FRONT VIEW

Inlet Structure =1
Aeration Tanks (Carousels) = 6
Clarifiers=6
Sludge Thichners =2
Screw Pump Stations = 3

Clarifiers
Aeration Tanks (Carousels)

Sea Out-fall Discharges = 150,000m3/day


Average BOD discharge loading = 20 -25mg/litre O2

You might also like