You are on page 1of 2

Pumps Valves Systems

n n

KSB Solutions

Industry

Water

Waste Water

Energy

Building Services

Mining

Palm Jumeirah
Seawater desalination plant

Palm Jumeirah Dubai/UAE


The Palm Jumeirah, a palm treeshaped artificial island, is probably one of Dubais most ambitious building projects. The island will feature hotels, flats, marinas, leisure parks and modern shopping malls.

Advantages through ring section design


Drinking water for the residents comes from two seawater desalination plants. They use the reverse osmosis process to produce 32,000 m3 of pure water every day. Here too, the KSB design principle of our tried and tested radially split HGM-RO series high-pressure pumps won the day. This pump types special advantages are its ultra-smooth running properties, maintenance-friendliness and excellent efficiencies, which markedly reduce energy consumption. Together, they spell extremely low lifecycle costs (LCC). The core desalination process also uses powerful Omega and RPH-RO series pumps.

In addition, a total of 86 of our Isoria shut-off butterfly valves ensure reliable control of these enormous amounts of water. Their nominal diameters range from DN 150 to DN 1000.

The smooth interaction of our products in this system and the resulting high degrees of efficiency and reliability convinced our customers, and were key to winning the contract.

Customer:
ACWA Emirates LLC

Technical data:
2 x 3 RO high-pressure pump HGM-RO 6/3
n

2 x 3 RO filtered seawater pump Omega 200-670B


n

Developer:
Palm Water

Q: H: P: n:

504 m /h
3

Q: H: P: n:

504 m3/h 135 m 250 kW 1,398 rpm

511 m 889 kW 2,985 rpm

Consultant:
Mott McDonald Ltd.

2 x 3 ERS booster pump

Commissioned:
2. Quarter 2007

Scope of supply:
Pump units (base plate, pump, motor), supervision of installation and commissioning. Site performance testing of all HGM-RO.
n

RPH-RO 250-401 Q: H: P: n: 778 m /h


3
n

45 m 116 kW 1,486 rpm

Should you need more information, please do not hesitate to contact me: Horst Behrends Tel. +49 6233 86-3865 horst.behrends@ksb.com www.ksb.com

1852.1023-10 / 01.09 / Subject to technical modification without prior notice. / KSB Aktiengesellschaft 2008

Seawater desalination plant Palm Jumeirah Scope of supply and project details

You might also like