You are on page 1of 80

ORIENTAL SUMMIT INDUSTRIES.SDN.

BHD SKILL CHART TRAINING PROGRAMME NAME STAFF NO SECTION


: ARIF PURWANYO : C1490 : STAMPING

A Member of

SHIFT : LINE :

B D

LEGEND 100 % = EXCELENT


5 MIN CHECKEING

STAMPING SKILL

WORKING SYSTEM
HANDLING OVER HEAD CRANE 1ST LAST OFF CHECKSHEET

OTHERS

TOTAL SKIL

VERIFY BY

CHAMFERING PROCESS

PRODUCT INSPECTION

KNURLING PROCESS

BENDING PROCESS

MACHINE SET UP

DIE SET UP

50 % = NEED GUIDANCE
75 % = GOOD 25 % = RE - TRANING

SMED

NO
1 2 3 4 5 6 7 8 9 10 11 12

PREPARED BY

DATE

GRADE

PERCENTAGE

Present Sheet No: Place of Work: OSI Sdn Bhd Designation of Work: Change Model Station: Press 160 Ton Subject Studied: Tandem Press Name: Mohd Ridhwan Hizami Abd Rashid Machine No : 024 Line D
Distance Time

Propose 301.4 0 100 60

Dev 246.6 0 41 71 19 0 0

548 41 171 79

13.983333

7.69

6.29333

Analisa Set up
Mesin Proses : Forming Name Personel: Mohd Ridhwan Hizami Abd Rashid
Eliminate waste Combine Change over Simplify Analysis

Tarikh Sheet-Nr.:

8/11/2010 1

Con

Setup Activity

Waiting Time

No.

Time(Saat)

Movement

Operation

Checking

Eliminate Change Combine Simplify I nternal E xternal

Duration

Set up Step / Activity

Transportation

Observation
Other

Distance

PIC

Remark- Material/Tool/Die are ready


1 2 3 4 5 6 7 8 Persedian awal Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Tunggu driver forklift ambil die Keluarkan die dari mesin Tanggalkan pin cushion ke dalam mesin 4 9 66 7 47 34 22 62 6 50 54 36 48 67 6 19 83 9 114 17 34 33 12 4 13 79 86 133 167 189 251 257 307 361 397 445 512 518 537 620 629 743 760 794 827 839 A A A A A A B B B B A A A A A A A B B B A A A

0.40 0.90 6.60 0.70 4.70 3.40

Pekerja tidak tahu nak buat apa ketika menunggu driver forklift datang angkat die 2.20
6.20 0.60 5.00 5.40

9 Masukkan pin cushion lain ke dalam mesin 10 Naikkan ketinggian die 11 Tunggu driver forklift ambil die 12 Masukkan die ke dalam mesin 13 Turunkan ram dan pasangkan clamp pada die 14 Pasang bolt dan nut 15 Naikkan Ram 16 Simpan tools 17 Menunggu 'child part' dari proses no 1 18 Die 'safety' 19 Setkan ketinggian die (Die Height) 20 Die 'safety' 21 Testing Part 22 Ambil Minyak 23 Sapu minyak pada die 24 25 26 27 28 29 30 31 32 33 34 35

Driver forklift memerlukan 2 pekerja untuk memasukkan atau 'match' kan die dengan pin cushion

3.60 4.80 6.70

Saiz nut terdapat 2 saiz berbeza & gunakan 2 jenis spanar berbeza saiz

0.60 1.90

8.30

Waktu menunggu child part dari proses no 1 yang lama

0.90 11.40

Setting' die height berulang kali. Tidak rujuk SOP sebenar Die 'safety dilakukan buat kali kedua

1.70 3.40 3.30 1.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

13.98

Analisa Sheet

Analisa Set up
Mesin Line D 024 Nama Personel: MOHD RIDHWAN HIZAMI ABD RASHID Tarikh Sheet-Nr.:
Eliminate waste Combine Change over Simplify Analysis

10/11/2010 1

Process : Forming

Transportation

Setup Activity

Time(Saat)

Duration

Movement

Checking

No.

Set up Step / Activity

Waiting Time

I to E

Observation:
I E

Other

PIC

E C C S

Persedian awal

kesesuian adapter bagi daya kilas semasa buka bolt,Tiada bin untuk menyimpan clamp/bolt-bertaburan

2 3 4 5 6 7 8 9

Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Tunggu driver forklift ambil die Keluarkan die dari mesin Tanggalkan pin cushion ke dalam mesin Masukkan pin cushion lain ke dalam mesin

9 66 7 47 34 22 62 6 50 54 36 48 67 6 19 83 9 114 17 34 33 12

13 79 86 133 167 189 251 257 307 361 397 445 512 518 537 620 629 743 760 794 827 839

A A A A A B B B B A A A A A A A B B B A A A

10 Naikkan ketinggian die 11 Tunggu driver forklift ambil die 12 Masukkan die ke dalam mesin 13 Turunkan ram dan pasangkan clamp pada die 14 Pasang bolt dan nut 15 Naikkan Ram 16 Simpan tools 17 Menunggu 'child part' dari proses no 1 18 Die 'safety' 19 Setkan ketinggian die (Die Height) 20 Die 'safety' 21 Testing Part 22 Ambil Minyak 23 Sapu minyak pada die
110495181.xlsx.ms_office

Step 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Perkara

Start Date

Duration

Persedian awal Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Tunggu driver forklift ambil die Keluarkan die dari mesin Tanggalkan pin cushion ke dalam mesin Masukkan pin cushion lain ke dalam mesin Naikkan ketinggian die Tunggu driver forklift ambil die Masukkan die ke dalam mesin Turunkan ram dan pasangkan clamp pada die Pasang bolt dan nut Naikkan Ram Simpan tools Menunggu 'child part' dari proses no 1 Die 'safety' Setkan ketinggian die (Die Height) Die 'safety' Testing Part Ambil Minyak Sapu minyak pada die

0 5 14 80 87 134 168 190 252 258 308 362 398 446 513 519 538 621 630 744 761 795 828

4 9 66 7 47 34 22 62 6 50 54 36 48 67 6 19 83 9 114 17 34 33

4 13 79 86 133 167 189 251 257 307 361 397 445 512 518 537 620 629 743 760 794 827 827

Turunka

Persedian

Turunkan Ram pada kedudukan 'Pu

Tanggalkan bolt dan nut dibahagia

Naikkan Ram pada kedudukan 'Puk

Naikkan Ketinggian Die (Die H

Tunggu driver forklift am


Keluarkan die dari Tanggalkan pin cushion ke dalam

Tanggalkan pin cushion ke dalam Masukkan pin cushion lain ke dalam

Naikkan ketinggi

Tunggu driver forklift amb Masukkan die ke dalam

Turunkan ram dan pasangkan clamp pa

Pasang bolt da

Naikkan

Simpan

Menunggu 'child part' dari prose

Menunggu 'child part' dari prose

Setkan ketinggian die (Die H

Testin

Ambil M

Sapu minyak pa

Persedian awal

dudukan 'Pukul 6'

t dibahagian atas

udukan 'Pukul 12;

n Die (Die Height)

forklift ambil die

an die dari mesin

n ke dalam mesin

n ke dalam mesin

n ke dalam mesin

an ketinggian die

forklift ambil die

e ke dalam mesin

n clamp pada die

ang bolt dan nut Naikkan Ram

Simpan tools

' dari proses no 1

' dari proses no 1


Die 'safety'

n die (Die Height) Die 'safety' Testing Part

Ambil Minyak
minyak pada die 0 50 100

100

150

200

250

300

Set Up Die Stamping

300

350

400

450

500

tamping Line

500

550

600

650

700

750

800

850

900

950

1,000

1,050

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Persedian awal Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Tunggu driver forklift ambil die Keluarkan die dari mesin Tanggalkan pin cushion ke dalam mesin Masukkan pin cushion lain ke dalam mesin Naikkan ketinggian die Tunggu driver forklift ambil die Masukkan die ke dalam mesin Turunkan ram dan pasangkan clamp pada die Pasang bolt dan nut Naikkan Ram Simpan tools Menunggu 'child part' dari proses no 1 Die 'safety' Setkan ketinggian die (Die Height) Die 'safety' Testing Part Ambil Minyak Sapu minyak pada die

4 9 66 7 47 34 22 62 6 50 54 36 48 67 6 19 83 9 114 17 34 33 12 839

A A A A A A B B B B A A A A A A A B B B A A A

0.48% 1.07% 7.87% 0.83% 5.60% 4.05% 2.62% 7.39% 0.72% 5.96% 6.44% 4.29% 5.72% 7.99% 0.72% 2.26% 9.89% 1.07% 13.59% 2.03% 4.05% 3.93% 1.43%

19 17 14 3 8 11 10 13 5 12 6 21 22 7 16 20 23 2 18 4 9 15 1

Setkan ketinggian die (Die Height) Menunggu 'child part' dari proses no 1 Pasang bolt dan nut Tanggalkan bolt dan nut dibahagian atas dan bawah Tanggalkan pin cushion ke dalam mesin Tunggu driver forklift ambil die Naikkan ketinggian die Turunkan ram dan pasangkan clamp pada die Naikkan Ketinggian Die (Die Height) Masukkan die ke dalam mesin Tunggu driver forklift ambil die Testing Part Ambil Minyak Keluarkan die dari mesin Simpan tools Die 'safety' Sapu minyak pada die Turunkan Ram pada kedudukan 'Pukul 6' Die 'safety' Naikkan Ram pada kedudukan 'Pukul 12; Masukkan pin cushion lain ke dalam mesin Naikkan Ram Persedian awal

% 13.59% 9.89% 7.99% 7.87% 7.39% 6.44% 5.96% 5.72% 5.60% 4.29% 4.05% 4.05% 3.93% 2.62% 2.26% 2.03% 1.43% 1.07% 1.07% 0.83% 0.72% 0.72% 0.48%

Cum 13.59% 23.48% 31.5% 39.3% 46.7% 53.2% 59.1% 64.8% 70.4% 74.7% 78.8% 82.8% 86.8% 89.4% 91.7% 93.7% 95.1% 96.2% 97.3% 98.1% 98.8% 99.5% 100.0%

100%
90%

Tandem Die

80% 70% 60% 50%


40%

30% 20% 10% 0%

Distance

1 Persedian awal 2 Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan 3 bawah 4 Naikkan Ram pada kedudukan 'Pukul 12; 5 Naikkan Ketinggian Die (Die Height) 6 Tunggu driver forklift ambil die 7 Keluarkan die dari mesin 8 Tanggalkan pin cushion ke dalam mesin 9 Masukkan pin cushion lain ke dalam mesin 10 Naikkan ketinggian die 11 Tunggu driver forklift ambil die 12 Masukkan die ke dalam mesin 13 Turunkan ram dan pasangkan clamp pada die 14 Pasang bolt dan nut 15 Naikkan Ram 16 Simpan tools 17 Menunggu 'child part' dari proses no 1 18 Die 'safety' 19 Setkan ketinggian die (Die Height) 20 Die 'safety' 21 Testing Part 22 Ambil Minyak 23 Sapu minyak pada die

Time

No

Task

4 9 66 7 47 34 22 62 6 50 54 36 48 67 6 19 83 9 114 17 34 33 12

13.98
Tambah Nilai Pengangkutan Pergerakan Tunggu Lain

PIC A A A A A A B B B B A A A A A A A B B B A A A

No

Tugasan

Masa PIC

Keseluruhan masa(minit)

0.00%

No 1 2 3 4 5 8 9 10 12 13 14 15 18 19 20

Tugasan Persedian awal Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Tanggalkan pin cushion ke dalam mesin Masukkan pin cushion lain ke dalam mesin Naikkan ketinggian die Masukkan die ke dalam mesin Turunkan ram dan pasangkan clamp pada die Pasang bolt dan nut Naikkan Ram Die 'safety' Setkan ketinggian die (Die Height) Die 'safety' Keseluruhan masa(minit)

Masa 4 9 66 7 47 62 6 50 36 48 67 6 9 114 17 9.13

4 13 79 86 133 195 201 251 287 335 402 408 417 531 548 9.13

PIC A A A A A B B B A A A A B B B

% 0.73% 1.64% 12.04% 1.28% 8.58% 11.31% 1.09% 9.12% 6.57% 8.76% 12.23% 1.09% 1.64% 20.80% 3.10% 100.0%

Time

No

Task

Duration 9 28

PIC 189 537

7 Keluarkan die dari mesin 16 Simpan tools

22 19

% 78.57% 67.86%

0.68

No 6 11 17

Tugasan Tunggu driver forklift ambil die Tunggu driver forklift ambil die Menunggu 'child part' dari proses no 1 Keseluruhan masa(minit)

Masa 34 34 88 54 83 171 2.85

% 19.88% 31.58% 48.54% 100.00%

No Tugasan 21 Testing Part 22 Ambil Minyak 23 Sapu minyak pada die Keseluruhan masa(minit)

Masa 34 33 12 1.32

% 34 43.04% 67 41.77% 79 15.19%

Stage

Task

External

Internal

Tunggu driver forklift ambil die Tunggu driver forklift ambil die Simpan tools Menunggu 'child part' dari proses no 1 Persedian awal Turunkan Ram pada kedudukan 'Pukul 6' Tanggalkan bolt dan nut dibahagian atas dan bawah Naikkan Ram pada kedudukan 'Pukul 12; Naikkan Ketinggian Die (Die Height) Keluarkan die dari mesin Tanggalkan pin cushion ke dalam mesin Masukkan pin cushion lain ke dalam mesin Naikkan ketinggian die Masukkan die ke dalam mesin Turunkan ram dan pasangkan clamp pada die Pasang bolt dan nut Naikkan Ram Die 'safety' Setkan ketinggian die (Die Height) Die 'safety' Testing Part Ambil Minyak Sapu minyak pada die

-4.1% -6.4% -2.3% -9.9% 0.48% 1.07% 7.87% 0.83% 5.60% 2.62% 7.39% 0.72% 5.96% 4.29% 5.72% 7.99% 0.72% 1.07% 13.59% 2.03% 4.05% 3.93% 1.43% 77.4%

Tanggalkan bolt dan nu

-22.6%

Page 50

Stage

SMED
External Internal
1.43% 3.93% 4.05% 2.03% 13.59% 1.07% 0.72% 7.99% 5.72% 4.29% 5.96% 0.72% 7.39% 2.62% 5.60% 0.83% 7.87% 1.07% 0.48% -9.9% -2.3% -6.4% -4.1% 60% 50% 40% 30% 20% 10% 0% 10% 20% 30% 40% 50% 60% Testing Part Die 'safety' Setkan ketinggian die (Die Height) Die 'safety' Naikkan Ram Pasang bolt dan nut Turunkan ram dan pasangkan clamp pada die Masukkan die ke dalam mesin Naikkan ketinggian die Masukkan pin cushion lain ke dalam mesin Tanggalkan pin cushion ke dalam mesin Keluarkan die dari mesin Naikkan Ketinggian Die (Die Height) Naikkan Ram pada kedudukan 'Pukul 12; Tanggalkan bolt dan nut dibahagian atas dan bawah Turunkan Ram pada kedudukan 'Pukul 6' Persedian awal Menunggu 'child part' dari proses no 1 Simpan tools Tunggu driver forklift ambil die Tunggu driver forklift ambil die

Percent of External and Internal

Page 51

Stage

60%

d Internal

Page 52

MODEL CHANGEOVER PREPARATION CHECKSHEET

A Member of

DATE

PART NAME

PART NUMBER

LINE

MACHINE NUMBER

TIME SET-UP

TIME END

No.
1

Activities
DIE READY AT 'DIE STANDBY'

PIC

okay

NG

Comments

TOOLS MATERIAL READY AT 'INCOMING MATERIAL PART'

POLYBOX / BASKET

STANDARD OPERATION PROCEDURE (SOP) PART CHECK DIE HEIGHT

PIN CUSHION

8 9 10

DIE CHANGE REPORT

PREPARED BY

CHECKED BY

APPROVED BY

STANDARD OPERATION PROCEDURE (SET UP TIME)


LINE PROCESS DIE CHANGE TIME SET UP 9 MINUTES JIG & TOOLS RELATED 1 ) SPANNAR 2) BOLT & NUT SIZE 38 DATE PREPARED BY

A Member of

CHECKED BY

APPROVED BY

15-Dec-10
RIDHWAN RAMZI WAN RAMLI

PROCEDURE STEP

1) Tanggalkan die

2) Permasangan die

METHOD (a) Naikkan ramp setinggi 5 mm (b) Turunkan ram pada pukul 6 (c) Tanggalkan bolt dan nut (d) Naikkan ram pada pukul 12 (e) Tanggalkan die dari mesin (a) Setkan die height ( 20mm dari die height sebenar) (b) Masukkan die ke dalam mesin (c) Pastikan kedudukan die betul pada mesin (d) Turunkan ram (e) Ketatkan bolt dan nut (f ) Naikkan ram (a) Pastikan die keadaan selamat ( Naik dan turunkan die)

CYCLE TIME (s ) (Maximum)

PREPARATION (a) Pastikan die telah berada DIE STANBY (b) Pastikan Tools (spannar) sudah sedia ada sebelum proses pertukaran die berlaku (c) Pastikan pemandu forklift telah bersedia untuk proses pertukaran die (d) Pastikan Material berada Incoming Material part (e) Sediakan polybox or basket untuk proses seterusnya (f) Pastikan SOP part untuk proses seterusnya telah disediakan

220 240 40 40

3) Pemeriksaan Keselamatan

TOTAL TIME (s ) (Maximum)

4) Pemeriksaan Kualiti

(a) Tentukan kualiti part pada stamp yang pertama (b) Pastikan part tiada crack dan burr

540

PROCESS FLOW

(c) Tanggalkan bolt dan nut

(a) Naikkan ramp setinggi 5 mm (b) Turunkan ram pada pukul 6

(a) Setkan die (b) Masukkan die ke dalam mesin height (20mm dari die height sebenar)

(c) Pastikan kedudukan die betul pada mesin

(e) Tanggalkan die dari mesin

(d) Naikkan ram pada pukul 12

(f ) Naikkan ram

(e) Ketatkan bolt dan nut

(1) REMOVE DIE

(2) SETTING DIE

(4) QUALITY CHECKING

(3) SAFETY CHECKING


SAFETY MEASURE

(a) Pastikan die keadaan selamat ( Naik dan turunkan die)

HAND GLOVE

EAR PLUG

SAFETY HELMET

SAFETY SHOE

STANDARD OPERATION PROCEDURE (SET UP TIME)


LINE PROCESS DIE CHANGE TIME SET UP 9 MINUTES JIG & TOOLS RELATED 1 ) SPANNAR 2) BOLT & NUT SIZE 38 DATE PREPARED BY

A Member of

CHECKED BY

APPROVED BY

15-Dec-10
RIDHWAN RAMZI WAN RAMLI

PROCEDURE STEP 1) REMOVE DIE METHOD (a) Upper ramp slide up ( 5 mm ) (b) Slide down ramp (6 O'Clock) (c) Loose bolt and nut (d) Upper ramp slide up (12 O'clcok) (e) Remove die from machine (a) Set die height ( higher 20mm from height of die) (b) Insert die to the machine (c) Set up die at machine (d) Slide down upper ramp (e) Tie bolt and nut (f ) Upper ramp slide up (a) Die safety check (Slide Up & down ramp)

CYCLE TIME (s ) (Maximum)

PREPARATION (a) Make sure die is ready at DIE STANBY (b) Tools (spannar) is ready before removing die process (c) Make sure driver forklift ready to remove die (d) Prapare material at Incoming Material part (e) Prapare polybox or basket at machine (f) Make sure SOP part is ready

220 240 40 40

2) SETTING DIE

3) SAFETY CHECK

TOTAL TIME (s ) (Maximum)

4) QUALITY CHECKING

(a) Check condition of part after first stamp (Check Quality) (b) Make sure not crack and burr at the part

540

PROCESS FLOW

(c) Loose bolt and nut

(a) Upper ramp slide up 5mm (b) Slide down ramp to 6 O Clock

(a) Set die height ( higher 20mm from height of die)

(b) Insert die to the machine

(c) Set up die at machine

(e) Remove die from machine

(d) Upper ramp slide up to 12 O'clcok

(f ) Upper ramp slide up

(e) Tie bolt and nut

(1) REMOVE DIE

(2) SETTING DIE

(4) QUALITY CHECKING

(3) SAFETY CHECKING


SAFETY MEASURE

(a) Die safety check (Slide Up & down ramp)

HAND GLOVE

EAR PLUG

SAFETY HELMET

SAFETY SHOE

CHANGE DIE REPORT


NO MACHINE NO PART NAME / PART NO PROCESS TIME START TIME END

A Member of

COMMENTS

8 9 10 11 12 13 14 15 16 17 18 19 20

DATE

LINE

PREPARED BY

CHECKED BY

APPROVED BY

No Time PIC Task 1 2 3 17 18 24 25 26 27 28 30 31 33 34 Tambah Nilai

Distance

Tambah Nilai Pengangkutan Pergerakan Tunggu Lain

ACTIONLOG / MINUTES
Meeting:
Attendees/Team: Recepients of Minutes:

SMED
Ramzi/Wan Azman/Amir/Ismai/Iskandar/Mohd Ridhwan

Date: Author: Remarks:

10/26/2010 Ramzi/ 2nd SMED Meeting Next meeting on

improvement is known realization has been started realization is finished

1 2 3

#
1

Date
10/26/2010 SMED Methodology

TOPIC

Action / Decision
Train all operators amd Technician- Morning (done)

Responsible Deadline
CW50

Status
2

26/10/2010

Weekly Meeting-2x

Fixed Time and place

CW50

26/10/2011

Actionlog after every meeting

Follow up on action log

CW50

26/10/2010

Checksheet / Standard Form Preparation

Standardize checklist for line setup

CW50

26/10/2011

Category of Setup Analysis Target of baseline setup time current is 45 minutes *REFER EN. ZAHARAN Off Line Setup Team

Define category for setup measure by category Tandem and Progresive Workout baseline data & set target by category target 30 minutes for each type of set-up To form the OLSU team member as to review the process

CW50

26/10/2010

CW50

26/10/2010

CW50

26/10/2010

Off Line Setup checklist

List of preparation material,tool and man power.

CW50

26/10/2010

Standard size bolt and nut

Change size 36 to 38

CW50

10

26/10/2011

Use ratchet

change spannar to ratchet

CW50

11

26/10/2010

OEE data collection daily weekly and monthly

Standard OEE Calculation (Line D MC024)

CW50

12

26/10/2010

SOP for changing die

SOP for die changing

CW50

13

26/10/2010

Before and After Improvement

Comparison witk OEE,Distance

CW50

ACTIONLOG / MINUTES
Meeting:
Attendees/Team: Recepients of Minutes:

SMED
Ramzi/Wan Azman/Amir/Ismai/Iskandar/Mohd Ridhwan

Date: Author: Remarks:

9/12/2010 Ramzi/ 2nd SMED Meeting Next meeting on

improvement is known realization has been started realization is finished

1 2 3

#
1

Date
9/12/2010 SMED Methodology

TOPIC

Action / Decision
Train all operators amd Technician- Morning (done)

Responsible Deadline
CW50

Status
3

9/12/2010

Weekly Meeting-2x

Fixed Time and place

CW50

9/12/2010

Actionlog after every meeting

Follow up on action log

CW50

9/12/2010

Checksheet / Standard Form Preparation

Standardize checklist for line setup

CW50

9/12/2010

Category of Setup Analysis

Define category for setup measure by category Tandem and Progresive Workout baseline data & set target by category target 20 minutes for each type of set-up To form the OLSU team member as to review the process

CW50

9/12/2010

Target of baseline setup time current is 20 minutes

CW50

9/12/2010

Off Line Setup Team

CW50

9/12/2010

Off Line Setup checklist

List of preparation material,tool and man power.

CW50

9/12/2010

Standard size bolt and nut

Change size 36 to 38

CW50

10

9/12/2010

Use ratchet

change spannar to ratchet

CW50

11

9/12/2010

OEE data collection daily weekly and monthly

Standard OEE Calculation (Line D MC024)

CW50

12

9/12/2010

SOP for changing die

SOP for die changing

CW50

13

9/12/2010

Before and After Improvement

Comparison witk OEE,Distance

CW50

Simplify

Figure 3. Markings for: a) cutting machine hydraulics b) die casting tools hydraulics

c) tool heating and cooling circuits