Professional Documents
Culture Documents
Chiang Mai
Nong Khai
THAILAND
Ubon Ratchathani Nakhon Ratchasima
Aranyaprathet Bangkok
Sattah ip
CAMBODIA
GULF OF THAILAND
Chiang Mai
Track Rehabilitation
Track Rehabilitation Projects Phase Phase Phase Phase Total 1 2 3 4* = (289 km) (258 km) (244 km) (227 km) 1,018 km
Nong Khai
THAILAND
Ubon Ratchathani Nakhon Ratchasima
Aranyaprathet Bangkok
Sattah ip
CAMBODIA
GULF OF THAILAND
Complete d
ANDAMAN SEA
Padang Besar
Chiang Mai
Track Rehabilitation
Track Rehabilitation Projects Phase 5 (308 km) Phase 6 (278 km) total = 586 km
Nong Khai
THAILAND
Ubon Ratchathani Nakhon Ratchasima
Aranyaprathet Bangkok
Sattah ip
CAMBODIA
Budgeting Framework
GULF OF THAILAND
ANDAMAN SEA
Padang Besar
Total Baht
= 15,287 mil.
Khaengkoi Khaengsueten (37 km) Suranarai Buayai (192 km) Jira Junc Buayai (79 km) total length = 308 km
5 6
Deformed track from recent 7.1 Richter quake in New Zealand on Sept 4, 2010
/ (1)
( 3,926 28 ..51) ( 106 . 7,648 )
Klong Sip Kao Chachoengsao
Kaeng Khoi
82 24 69
Si Racha
Existing track Double track project: Chachoengsao Sriracha Laem Chabang Double track project: 6 2555 Chachoengsao Klong Sibkao Kaeng Khoi
10
Chiang Mai
Nong Khai
THAILAND
Ubon Ratchathani Nakhon Ratchasima
Aranyaprathet Bangkok
Sattah ip
CAMBODIA
GULF OF THAILAND
ANDAMAN SEA
Padang Besar
15 . H= 7.0 . W= 6.5 .
15 . H=7
.0 .
W=6.5
Twin-Tunnels Alignment
Existing tunnel
Proposed tunnel
14
100+500
Deformed track from recent 7.1 Richter quake in New Zealand on Sept 4, 2010
End of Presentation