PIPING JOINT WELDING STATUS

HRSG IBR Joints welded HRSG Drain Joints welded LP Piping joints welded Power Cycle Piping joints welded Total No. of Joints 5247 3084 5052 2018

Progress 14-Feb 1365 125 961 312

21-Feb

29-Feb

Total

15401

2763

A.0 A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11 A.12 A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 B.0 B.1 B.2 B.3 B.4 B.5 B.6 B.7 B.8

POWER CYCLE PIPING MS Header to HPBP Valve HP & LP Bypass Warmup HRH from Reheater to Interceptor V/V LPBP V/V Upstream and Downstream CRH from turbine to reheater HPBP V/V to CRH Piping Aux Steam to Deaerating Heater Steam from Process Boiler Condenser air evacuation Piping Gas Cooler Leak-off to atmosphere Condensate suction CD from Pump to LPH-1 / DC I/T Tee & Rec CD from LPH-1 DC I/T Tee & Rec to TG TP Condensate dump from Header Boiler feed pump discharge piping Boiler feed pump suction piping Boiler feed recirculation Spary water to HPBP Deaerating Heater overflow and drain Drain flash tank vent to condenser

Total weld joints 5 75 75 59 91 13 92 93 55 13 54 295 180 101 452 158 65 50 63 38

Progress till 23-Feb-12 Total joints fitted-up 0 0 48 4 35 0 59 23 0 0 33 113 78 0 103 104 50 0 0 25

Total - Power Cycle Piping


LP PIPING Cooling water piping Aux Cooling Water piping DM Water Piping Service Water Piping Instrument Air Piping Service Air Piping Lube oil piping (non-integral) Potable water piping

2027

675

Total weld joints Total joints fitted-up 227 148 1755 743 1375 424 1765 315 0 0 300 115 110

Total - LP Piping
Progress till 31-Jan-12 LP Piping Power Cycle Piping Progress in last 23 days LP Piping Power Cycle Piping

5422

1855

940 133 915 542

Progress till 23-Feb-12 Total joints welded 0 0 43 4 32 0 52 16 0 0 32 28 0 0 68 91 0 0 0 24

390
Total joints welded 110 586 104 100 0 0 43 87

1030

622 95 408 295 17.73913043 244 12.82608696 125.9231