You are on page 1of 45

3.

HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


3. 1. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
22 oktober 2010
Firmansyah
V
SONDIR

Kedala
man

Jumlah
Hambata
Hambatan
Hambata
n Konis
Pelekat
n
qc
qc + f
f

( m ) ( Kg / cm2 )( Kg / cm2 ) ( Kg / cm2 )


0.0
0.2
15
25
10
0.4
20
35
15
0.6
20
30
10
0.8
15
25
10
1.0
25
45
20
1.2
25
55
30
1.4
35
65
30
1.6
20
35
15
1.8
20
35
15
2.0
20
40
20
2.2
25
50
25
2.4
35
55
20
2.6
25
45
20
2.8
35
45
10
3.0
40
65
25
3.2
55
70
15
3.4
60
75
15
3.6
75
100
25
3.8
135
150
15

Unit
Hambatan
Pelekat
fs
2

( Kg / cm )
1.0
1.5
1.0
1.0
2.0
3.0
3.0
1.5
1.5
2.0
2.5
2.0
2.0
1.0
2.5
1.5
1.5
2.5
1.5

Nilai fs tiap 20
cm (
HPx20/100)

Total
Hambatan
Pelekat
Tf

( Kg / cm )
20
30
20
20
40
60
60
30
30
40
50
40
40
20
50
30
30
50
30

( Kg / cm )
20
50
70
90
130
190
250
280
310
350
400
440
480
500
550
580
610
660
690

Hambatan
Rasio
Fr = fs / qc
(%)
6.67
7.50
5.00
6.67
8.00
12.00
8.57
7.50
7.50
10.00
10.00
5.71
8.00
2.86
6.25
2.73
2.50
3.33
1.11

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
22 oktober 2010
Firmansyah
V
GRAFIK PEMBACAAN SONDIR
Hambatan Konus , qc(kg/cm2)

Rasio Hambatan, Fr(%)

14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 147 154

0
0.0

0.2

0.2

0.4

0.4

0.6

0.6

0.8

0.8

1.0

1.0

1.2

1.2

1.4

1.4

Kedalaman , m

0.0

1.6

1.6
qc(kg/cm2)

1.8

Tf(kg/cm)
1.8

2.0

2.0

2.2

2.2

2.4

2.4

2.6

2.6

2.8

2.8

3.0

0 23 46 69 92 115138161184207230253276299322345368391414437460483506529
Total Hambatan Pelekat, Tr(kg/cm)

Keterangan :
- qc(kg/cm2)
- Tf(kg/cm)

3.0

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
28 April 2008
Fanny Malawat
V

Cokelat Kekuningan

Lanau Berpasir

Coklat

Lanau

Coklat

Lempung

Standar Penetration test

Consistensy

Soil Description

Reltive Density

Colour

Log

Casing

Un disturbed sample

Depth in meter

Elevation in meter

HAND BORING

Depth in meter
Number Of Blows (blow/ cm)

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

0.0

0.30

0.1
0.2
0.3
0.4

0.60

0.5
0.6
0.7

0.90

0.8
0.9

1.00

1.0

End of boring

1.1
1.2
1.3

LEGEND :

Undisturbed Sample

Disturbed sample

Clay

Silt

Sand

N - Value (blow/ 30cm)

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
15 Oktober 2010
Firmansyah
V

TABEL 3.1 SAND CONE TEST

A-1

Water Content Sample


Test Number

Compaction Test Result

Container no.

Optimum laboratory Dry Density, g dry Lab

Weight of Container

gram

2.10

2.10

Weight of Container + Wet soil

gram

15.14

15.33

Weight of Container + Dry soil

gram

6.84

6.85

Weight of wet soil

gram

13.04

13.23 Density of sand, g sand

Weight of Dry soil

gram

4.74

4.75

%
%

36.35

35.90

Water Content,w=Ws/Ww*100%
Average Of water Content

Optimum Mouisture Content (OMC)


Sand cone Data:

Density of sand, g sand

No. Titik
Berat botol + corong kosong (W1)

Gram

1187

Berat Botol+Corong air (W2)

Gram

5812

Berat botol +pasir + corong (W3)

Gram

8090

Berat sisa pasir+ botol + corong (W4)

Gram

4665

Berat tanah basah + kaleng lapangan (W5)

Gram

2912.4

Berat kosong kaleng lapangan (W6)

Gram

Berat tanah basah dalam lubang W = W5 - W6

Gram

2912.4

Berat sisa pasir dilubang W7 = (W3 - W4) - Wf

Gram

2608.51

cm3

1747.698

Berat isi tanah basah gw = W / V

Gram/Cm3

1.666

Berat isi tanah kering gd = gw/(1 + w )

Gram/Cm3

1.300

Derajat kepadatan

1.493
816.49

Weight of sand in the fannel,Wf

36.13

Volume sisa pasir dilubang, V = W7 / gsand

gdryfield
gdrylab

100%

1.330
28.170

1.300
1.330

W3-W1

g sand =

W3-W2

100%

97.757

METODE PELAKSANAAN DI
LAPANGAN
JENBACHER

AREA
PARKIR
FT - UH

FT - UH

LAB.
MEKANIKA
TANAH
JUR.SIPIL

JURUSAN TEKNIK SIPIL


FAK.TEKNIK UNHAS

Lokasi Percobaan Sand Cone

LOKASI

4. 1. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 12 Oktober 2010
H.HENDRA ADIPUTRA HATTA
:V

NO.1
DCP Depth, h = 0 - 100
DCP OBSERVATION
CBR EVALUATION
CBR Value (%)
No. Blows DCP Reading Penetration Penetration
Per 2.5 mm Chart 1
Chart 2
0
3.40
0.00
0.000
0.00
0.00
1
6.20
2.80
0.893
6.3
6.50
2
9.90
6.50
0.769
5.4
6.00
3
12.50
9.10
0.824
6
7.00
4
14.70
11.30
0.885
6.2
7.50
5
17.10
13.70
0.912
6.8
8.00
6
19.70
16.30
0.920
6.90
8.00
7
21.30
17.90
0.978
7.2
8.50
8
22.40
19.00
1.053
8
8.00
9
23.40
20.00
1.125
8.2
9.00
10
25.10
21.70
1.152
8.5
9.10
11
27.10
23.70
1.160
8.70
9.20
12
29.10
25.70
1.167
8.95
9.70
13
31.20
27.80
1.169
8.8
9.30
14
33.40
30.00
1.167
8.8
9.10
15
35.60
32.20
1.165
8.75
9.20
16
37.40
34.00
1.176
8.90
9.30
17
39.40
36.00
1.181
8.92
9.40
18
41.40
38.00
1.184
8.93
9.50
19
43.40
40.00
1.188
8.9
9.30
20
46.40
43.00
1.163
8.75
9.30
21
49.30
45.90
1.144
8.40
9.10
22
52.20
48.80
1.127
8.1
9.00
23
55.10
51.70
1.112
8
8.70

CBR
0.00
6.30
5.40
6.00
6.20
6.80
6.90
7.20
8.00
8.20
8.50
8.70
8.95
8.80
8.80
8.75
8.90
8.92
8.93
8.90
8.75
8.40
8.10
8.00

23
22

21
20
19
18
17
16
15

Kedalaman (cm)

14
13
12
11
10
9

8
7
6
5
4
3
2

1
0
0

14

21

28

35

42

49

CBR (%)

Grafik Hubungan Kedalaman dengan CBR

56

Proyek

Praktikum Laboratorium Mekanika Tanah

Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:

Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas


13 Oktober 2010
Firmansyah
V

Tabel 5.1

BERAT JENIS SPESIFIK , Gs

(Tanah Sampel)
Nomor Percobaan

II

Berat Piknometer, W 1(gram)

12.33

12.33

Berat Piknometer + air, W 2(gram)

60.4

60.4

Berat Piknometer + air + tanah, W 3(gram)

68.42

68.21

Berat tanah kering, W s(gram)

12.5

12.5

28

28

Faktor koreksi, a

0.9927

0.9927

Berat Jenis, Gs

2.770

2.646

Temperatur, C

Berat Jenis Rata-rata, Gs


jenis tanah : lempung inorganik

2.71

Tabel Faktor koreksi ( a )

Temp. ( o C )

Unit Weight of
Water

4
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

1
0,99897
0,99880
0,99862
0,99844
0,99823
0,99802
0,99870
0,99757
0,99733
0,99708
0,99682
0,99655
0.99267
0,99598
0,99568

Tabel Pembagian jenis tanah berdasarkan Berat Jenis


Tipe Tanah
Sand (Pasir)
Silty Sand (Pasir Berlanau)
Inorganic Clay (Lempung Inorganic)
Soil with mica or iron
Gambut
Humus Soil
Grafel

Gs
2,65 - 2,67
2,67 - 2,70
2,70 - 2,80
2,75 - 3,00
< 2,00
1.37
> 2,70

Proyek

Praktikum Laboratorium Mekanika Tanah

Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:

Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas


13 Oktober 2010
Firmansyah
V

Tabel 5.2

BERAT JENIS SPESIFIK , Gs

(Tanah Hand Boring)


Nomor Percobaan

II

Berat Piknometer, W 1(gram)

25.19

12.33

Berat Piknometer + air, W 2(gram)

73.45

60.4

Berat Piknometer + air + tanah, W 3(gram)

81.52

68.29

Berat tanah kering, W s(gram)

12.5

12.5

28

28

Faktor koreksi, a

0.9927

0.9927

Berat Jenis, Gs

2.801

2.692

Temperatur, C

Berat Jenis Rata-rata, Gs


jenis tanah : lempung inorganik

2.75

6.1. Hasil Perhitungan


Proyek
Lokasi
Tanggal Percobaan
Nama

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 14 Oktober 2010
: Firmansyah

Kelompok

:V

Bore Hole No.


Sample
Sample Depth
Ring/Container Number
Weight of Ring (1)
Weight of Container (2)
Weight of Ring+Container+Wet Soil (3)
Weight of Wet Soil (4)=(3)-(2)-(1)
Volume of Soil (5)
Weight of Ring+Container+Dry Soil (6)
Weight of Dry Soil (7)=(6)-(1)-(2)
Weight of Water (8)=(4)-(7)
Spesific Grafity, Gs
Volume of Dry Soil (9)=(7)/Gs
Volume of Pore (10)=(5)-(9)
Wet Density, gwet = (4)-(5)
Water content, w =(8)/(7)*100%
Dry Density, gd = gwet/(1+w)
Porosity, n = (10)/(5)*100%
Degree of Situration, Sr = (8)/(10)*100%

m
Gram
Gram
Gram
Gram
Cm3
Gram
Gram
Gram
Cm3
Cm3
Gr/Cm3
%
Gr/Cm3
%
%

BH-2
2
0.3-0.6

1
0-0.3
1
0.00
9.71
81.50
71.79
50.46
48.03
38.32
33.47
2.748
13.94
36.52
21.33
87.34
0.24
72.365
91.66

2
0.00
9.70
87.40
77.70
50.46
60.03
50.33
27.37
2.748
18.32
32.14
27.24
54.38
0.49
63.70
85.15

3
0.00
9.80
83.20
73.40
50.46
52.50
42.70
30.70
2.748
15.54
34.92
22.94
71.90
0.31
69.21
87.91

4
0.00
9.65
86.70
77.05
50.46
54.38
44.73
32.32
2.748
16.28
34.18
26.59
72.26
0.36
67.74
94.55

3
0.6-0.9
5
0.00
9.66
85.20
75.54
50.46
55.88
46.22
29.32
2.748
16.82
33.64
25.08
63.44
0.39
66.67
87.16

6
0.00
9.73
82.80
73.07
50.46
54.54
44.81
28.26
2.748
16.31
34.15
22.61
63.07
0.35
67.68
82.74

3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


3.1. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 14 Oktober 2010
: Firmansyah
:V

BATAS CAIR ( LIQUID LIMITS, LL )


No Test
Jumlah Pukulan
No. Container
Berat Tanah Basah + Container, W1
Berat Tanah Kering + Container, W2
Berat Container, W3
Berat Air (Ww=W1-W2)
Berat Tanah Kering , (Wd=W2-W3)
Kadar Air, Ww/Wd x 100%

Gram
Gram
Gram
Gram
Gram
%

1
12
1

2
16
2

3
27
3

4
43
4

104.36

95.77

103.5

102.95

63.8

61.5

68.5

69.9

7.3

7.3

7.3

7.3

40.56

34.27

35

33.05

56.5

54.2

61.2

62.6

71.79

63.23

57.19

52.80

Kurva Aliran untuk penentuan Batas Cair

y = -14.09ln(x) + 104.62
80

70
Kadar Air (%)

60
50

40
30
20
10

Batas cair = 85,97%

10

0
1

10

25

100

Jumlah Pukulan

Batas Cair (LL) didapat pada pukulan 25


Jadi, LL = -12.32 Ln (25) + 109.78 =

59.27 %

3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


3. 2. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 14 Oktober 2010
: Firmansyah
:V

BATAS PLASTIS ( PLASTIC LIMITS, PL )


No Test
No. Container
Berat Tanah Basah + Container, W1
Berat Tanah Kering + Container, W2
Berat Container, W3
Berat Air (Ww=W1-W2)
Berat Tanah Kering , (Wd=W2-W3)
Batas Plastis, Ww/Wd x 100%
Batas Plastis Rata - Rata, Ww/Wd x 100%

Gram
Gram
Gram
Gram
Gram
%
%

1
A1
17.7
15.25
7.7
2.45
7.55
32.45

2
A2
17.3
14.74
7.3
2.56
7.44
34.41
33.43

Indeks Plastisitas PI = LL - PL
PI = 59.27 -

33.43

25.84 %

3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


3. 3. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 19 Oktober 2010
: Firmansyah
:V

BATAS SUSUT ( SHRINGKAGE LIMITS, SL )


No Test
Berat Mould, W1
Berat Mould + Tanah basah , W2
Berat Mould + Tanah kering , W3
Berat Air Raksa yang dipakai untuk
mengisi mangkok shringkage, W4
Berat Air Raksa yang dipindahkan
oleh tanah yang ditest, W5
Berat tanah basah, Ww=W2-W1
Berat tanah kering, Wd=W3-W1
Berat air,Wa=W2-W3
Berat cawan petri, Wp
Berat jenis air raksa, r
Volume tanah basah, Vw=(W4-W1)/r
Volume tanah kering, Vd=(W5-Wp)/r
Kadar air, =Wa/Wd x 100%
Batas susut,
SL = Kadar air-((Vw-Vd)/Wd)x100%)
SL rata - rata

Gram
Gram
Gram

1
13.33
55.4
42.64

2
13.49
54.2
41.67

Gram

340.02

339.36

Gram

241.85

239.85

Gram
Gram
Gram
Gram

42.07
29.31
12.76
0
13.6
24.02
17.78
43.53

40.71
28.18
12.53
0
13.6
23.96
17.64
44.46

22.25

22.02

22.14

ratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas

AS CAIR ( LIQUID LIMITS, LL )


4
43
4
102.95
69.9
7.3
33.05
62.6
52.80

100

ratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas

ratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
: 29 April 2008
: Fanny Malawat
:V
TABEL 8.1 ANALISA SARINGAN

Berat tanah kering + Container


Berat Container
Berat tanah Kering

Saringan Diameter
No.
(mm)
4
4.75
10
2
18
0.84
40
0.425
60
0.25
100
0.15
200
0.075
Pan
-

Sebelum Sesudah
910.9
610.9
110.9
110.9
800
500

Berat Tertahan
(gram)
0
81.7
102.8
130.6
84.6
39.6
28.4
23.8

Berat Kumulatif
(gram)
0
81.7
184.5
315.1
399.7
439.3
467.7
491.5

Persen (%)
Tertahan
Lolos
0
100
16.62
83.38
37.54
62.46
64.11
35.89
81.32
18.68
89.38
10.62
95.16
4.84
100.00
0

Grafik Analisa Saringan

Nomor Saringan
No. 4

100

No. 10

No. 18

No. 40

No. 60

No. 100

No. 200

90

Persen Lolos (%)

80
70
60
50
40
30
20
10
0

10

1
Diameter Saringan (mm)

0.1

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
:
: Fanny Malawat
:V
HIDROMETER

Berat Jenis
:
2.7
gram/cm3
Zero Correction
:
1
Meniscus Correction
:
1
Gs Correction
:
0.971
{a = 1.65 Gs/[(Gs-1)xGs]}
Berat Tanah, Ws
:
50
gram
Temperatur (T)
:
27
Rcp = R + Temperatur Correction - Zero Correction
Rcl = R + Meniscus Correction
Waktu
(menit)

T
0
( C)

0.25
0.5
1
2
4
8
15
30
60
90
120
240
1440

27
27
27
27
27
27
27
27
27
27
27
27
27

10.50
10.00
9.50
8.50
8.00
7.00
6.00
5.50
5.00
4.00
3.50
3.00
2.00

x=

0.06

Rcp
13.50
13.00
12.50
11.50
11.00
10.00
9.00
8.50
8.00
7.00
6.50
6.00
5.00
y=

% Butiran Halus
a.Rcp/Ws x 100
%
26.21
25.24
24.26
22.32
21.35
19.41
17.47
16.50
15.53
13.59
12.62
11.65
9.71
18.504

Rcl

L
(cm)

11.50
11.00
10.50
9.50
9.00
8.00
7.00
6.50
6.00
5.00
4.50
4.00
3.00

14.40
14.50
14.60
14.75
14.80
15.00
15.20
15.25
15.30
15.50
15.55
15.60
15.80

0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318
0.012318

Faktor koreksi temperatur


CT
Temp
(oC)
15
-1.10
16
-0.90
17
-0.70
18
-0.50
19
-0.30
20
0.00
21
0.20
22
0.40
23
0.70
24
1.00
25
1.30
26
1.65
27
2.00
28
2.50
29
3.05
30
3.80

Faktor koreksi a untuk Berat Jenis Tanah


corection factor
Unit weight of soil solids
a
2.85
0.892
2.80
0.917
2.75
0.943
2.70
0.971
2.65
1.000
2.60
1.031
2.55
1.065
2.50
1.100

: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas

HIDROMETER

D=K (L/t)0,5
0.09349
0.06633
0.04707
0.03345
0.02369
0.01687
0.01240
0.00878
0.00622
0.00511
0.00443
0.00314
0.00129

Grafik Pembagian Butir Analisa Hidrometer

27.5

25

Persen Lolos (%)

22.5

20

17.5

15

12.5

10

7.5

5
0.1

0.01
Ukuran Butir (mm)

0.001

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas

ASTM D1140-54, D421-58 & D422-63

Berat jenis air terhadap temperatur, g Wet T


=
faktor, K = ( 1000 x Gs x g wet T)/(10 x Ws(Gs -1)) =
Faktor Kt = f(Gs,T)
=

27 10.50
27 10.00
27
9.50
27
8.50
27
8.00
27
6.00
27
5.50
27
5.00
27
3.00
27
2.00
0.99655
6.639103437
0.012318

-3
-3
-3
-3
-3
-3
-3
-3
-3
-3

0.8963
0.8631
0.8299
0.7635
0.7303
0.5975
0.5643
0.5311
0.3983
0.332

Zr = LL - (L/2)
7.2
7.15
7
6.925
6.8
6.5
6.475
6.45
6.2
6.1

N = % lolos sar.No.200X

0.25
0.5
1
2
5
15
30
60
240
1440

N = K(R-RW)%

100
83.377
62.462
35.89
18.678
10.621
4.8423
0

RW

0
16.623
37.538
64.11
81.322
89.379
95.158
100

D = KT (Zr/t)0.5

0
81.7
184.5
315.1
399.7
439.3
467.7
491.5

2.71 gram/cm3
analisa hidrometer

berat kumulatif ( gram)

Berat Tertahan ( Gram )

0
81.7
102.8
130.6
84.6
39.6
28.4
23.8

Persen Lolos (%)

4.75
2
0.84
0.425
0.25
0.15
0.075

spec. Gravity, Gs :

persen tertahan (%)

4
10
18
40
60
100
200
Pan
-

Diameter (mm)

saringan No.

berat Tanah Kering :


500
Analisa Saringan

Temperatur T(oC)

:
:
:
:
:

Waktu (menit)

Proyek
Lokasi
Testing method
Tested By
Date

0.0661
0.0466
0.0326
0.0229
0.0144
0.0081
0.0057
0.0040
0.0020
0.0008

4.3401
4.1793
4.0186
3.6971
3.5364
2.8934
2.7326
2.5719
1.9289
1.6074

nilai LL berdasarkan nilai RCL dari tabel


LL
L
14.4
14.4
14.4
14.5
14.3
14.6
14.3
14.75
14.2
14.8
14.1
15.2
14.1
15.25
14.1
15.3
14
15.6
14
15.8

No. 4

100

No. 40

No. 200

80

60

40

20

0
100.0000

10.0000

1.0000

0.1000

0.0100

grafik distribusi ukuran saringan

0.0010

0.0001

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT UH
: 5 Mei 2008
: Fanny Malawat
:V
KUAT TEKAN BEBAS

Data Sampel
Diameter
Tinggi
Volume
Luas
Berat Tanah Basah
Berat Tanah Kering
Kadar Air
Berat Volume Basah
Berat Volume Kering
LRC

Deformasi Aksial
Pembacaan
Deformasi
dh (mm)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00

Regangan
Aksial
e=dh/h (%)
0.00
0.51
1.02
1.53
2.04
2.55
3.06
3.57
4.08

:
:
:
:
:
:
:
:
:
:

4.90
9.80
184.71
18.85
275.00
211.00
30.33
1.49
1.14
0.185

cm
cm
cm3
2
cm
gr
gr
%
gr/cm3
gr/cm3
kg/div

Gaya dan Tegangan Aksial


Gaya Aksial
Tegangan Aksial
Koreksi Luas
Tegangan
Pembacaan
Gaya Aksial
A=A0/(1-dh/h)
s=P/A
Beban
P
2
(div)
(kg)
(kg/cm )
(cm2)
0
0.00
18.85
0.00
34
6.29
18.94
0.33
87
16.10
19.04
0.85
115
21.28
19.14
1.11
137
25.35
19.24
1.32
149
27.57
19.34
1.43
160
29.60
19.44
1.52
172
31.82
19.55
1.63
140
25.90
19.65
1.32

Hubungan antara konsisitensi tanah dengan kekuatan tanah lempung


dari Test Unconfined Compression
Konsistensi
Sangat Lunak
Lunak
Menengah
Kaku
Sangat Kaku
Keras

qu
ton /ft2
0 - 0.25
0.25 - 0.5
0.5 - 1.48
1-2
2-4
>4

Persamaan garis regresi


2
y=
-0.1613
x
+
y' =
-0.3226
x
+
0=
-0.3226
x
+
x=
3.167
qu =
1.543
kg/cm2
termasuk konsisitensi menengah

9.8cm

cm 5.3

Gambar Cetakan

1.0218
1.0218
1.0218
=

0.0493

1.38825

ton /ft2

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT UH
: 5 Mei 2008
: Fanny Malawat
:V
KUAT TEKAN BEBAS

Data Sampel
Diameter
Tinggi
Volume
Luas
Berat Tanah Basah
Berat Tanah Kering
Kadar Air
Berat Volume Basah
Berat Volume Kering
LRC

Deformasi Aksial
Pembacaan
Deformasi
dh (mm)
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50

Regangan
Aksial
e=dh/h (%)
0.00
0.51
1.02
1.53
2.04
2.55
3.06
3.57

:
:
:
:
:
:
:
:
:
:

5.00
9.80
192.33
19.63
283.00
216.00
31.02
1.47
1.12
0.185

cm
cm
cm3
2
cm
gr
gr
%
gr/cm3
gr/cm3
kg/div

Gaya dan Tegangan Aksial


Gaya Aksial
Tegangan Aksial
Koreksi Luas
Tegangan
Pembacaan
Gaya Aksial
A=A0/(1-dh/h)
s=P/A
Beban
P
2
(div)
(kg)
(kg/cm )
(cm2)
0
0.00
18.85
0.00
38
7.03
18.94
0.37
73
13.51
19.04
0.71
110
20.35
19.14
1.06
140
25.90
19.24
1.35
158
29.23
19.34
1.51
173
32.01
19.44
1.65
132
24.42
19.55
1.25

Hubungan antara konsisitensi tanah dengan kekuatan tanah lempung


dari Test Unconfined Compression
Konsistensi
Sangat Lunak
Lunak
Menengah
Kaku
Sangat Kaku
Keras

qu
ton /ft2
0 - 0.25
0.25 - 0.5
0.5 - 1.48
1-2
2-4
>4

Persamaan garis regresi


2
y=
-0.1866
x
+
y' =
-0.3732
x
+
0=
-0.3732
x
+
x=
2.929
qu =
1.690
kg/cm2
termasuk konsisitensi kaku

9.8cm

cm 5.3

Gambar Cetakan

1.0932
1.0932
1.0932
=

0.088

1.52058

ton /ft2

Grafik Tegangan - Regangan

2.00
1.90
1.80

qu = 1.696
kg/cm2

1.70
1.60
1.50
1.40

y = -0.1571x2 + 0.9949x - 0.048

1.30
Tegangan (kg/cm2)

1.20
1.10
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
-0.10

0.5

1.5

2.5

3.5

-0.20
Regangan (%)

4.5

5.5

11. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


11. 1. Hasil Perhitungan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
30 April 2008
Fanny Malawat
V
UJI GESER LANGSUNG

Kedalaman Sampel
Dimensi Sampel
Kalibrasi Proving Ring
Tinggi Sampel
Luas Sampel

:
:
:
:
:

Gaya Normal
Tegangan Normal

P1 =
s1 =

Perpindahan
Geser
(mm)

Pembacaan
(div)

0
50
100
150
200
250
300
350
400
450
500

0
10
17
23
29
34
33
35
32

1.05
6.3
0.39
2.00
31.1725

10
kg
0.32080 kg/cm2
Tegangan
Gaya
Geser
Geser
(kg)
(kg/cm2)

0
3.9
6.63
8.97
11.31
13.26
12.87
13.65
12.48

0.0000
0.1251
0.2127
0.2878
0.3628
0.4254
0.4129
0.4379
0.4004

m
cm
kg/div
cm
cm2
P2 =
s2 =
Pembacaan
(div)

P3 =
20
kg
0.64159 kg/cm2
s3 =
Tegangan
Gaya
Pembacaan
Geser
Geser
(div)
2
(kg)
(kg/cm )

0
12
32
39
43
45
48
47
50
48

0
4.68
12.48
15.21
16.77
17.55
18.72
18.33
19.5
18.72

0.0000
0.1501
0.4004
0.4879
0.5380
0.5630
0.6005
0.5880
0.6256
0.6005

0
15
36
44
53
56
60
63
62
64
61

30
kg
0.96239 kg/cm2
Tegangan
Gaya
Geser
Geser
(kg)
(kg/cm2)

0
5.85
14.04
17.16
20.67
21.84
23.4
24.57
24.18
24.96
23.79

0.0000
0.1877
0.4504
0.5505
0.6631
0.7006
0.7507
0.7882
0.7757
0.8007
0.7632

Tegangan Geser, t (kg/cm2)

Hubungan Tegangan Geser dan Tegangan Normal

1.00
0.80

q = 29.470

y = 0.565x + 0.311

0.60
0.40

0.20

c = 0,381 kg/cm

0.00
0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

Tegangan Normal ,s (kg/cm2)

0.8

0.9

1.0

1.1

1.2

1.3

1.4

1.5

Dari grafik diperoleh persamaan regresi :


y =
0.5659
x +
0.258
Mencari nilai C, berdasarkan persamaan regresi
x
y
0
0.258
0.2
0.37118
0.4
0.48436
0.6
0.59754
0.8
0.71072
1
0.8239
Besar sudut yang dibentuk garis persamaan :
0.5659
Tg a =
1
a = 29.5055215

14.75276

3. HASIL PERHITUNGAN DAN INTERPRETASI PERCOBAAN


3. 1. Hasil Perhitungan dan Interpretasi Percobaan
Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
2 Mei 2008
Fanny Malawat
V
PERMEABILITAS

Constan Head
1
Diameter buret (d)
:
cm
6.3
Diameter sampel (D)
:
cm
7
Tinggi sampel (H)
:
cm
No. Test
Luas potongan melintang buret (a=1/4pd2)
Luas potongan melintang sampel (A=1/4pD2)
Ketinggian hidrolik (h)
Panjang sampel (L)
Waktu pengujian (t)
Temperatur (T)
Volume air yang terkumpul (Q)
Koefisien permeabilitas (Q.L / h.A.t)
Rata-rata
Falling Head
1
Diameter buret
:
cm
6.3
Diameter sampel
:
cm
5
Tinggi sampel (H)
:
cm
No. Test
Luas potongan melintang buret (a=1/4pd2)
Luas potongan melintang sampel (A=1/4pD2)
Tinggi puncak hidrolik pada permulaan pengujian h1
Tinggi puncak hidrolik pada akhir pengujian (hf)
Panjang sampel (L)
Waktu pengujian (t)
Temperatur (T)
Koreksi vikositas (hT/h20)
Koefisien permeabilitas, kT=(a.L/A.t) x ln(h1/hf)
Koefisien permeabilitas standar, k20 (kT(hT/h20))
untuk temperatur 27oC
0.85
=
hT
1.00
h20 =

cm2
cm2
cm
cm
menit
o
C
(cm3)
(cm/det)
(cm/det)

cm
cm2
cm
cm
cm
detik
o
C
cm/det
cm/det
1

1
2
0.785
0.785
31.172
31.172
109.5
109.5
8.2
8.3
83.4
83.6
27
27
500
500
0.000240 0.000242
0.000241

1
0.785
31.172
100
6
8.1
120
27
0.850
0.004785
0.004067

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

: Praktikum Laboratorium Mekanika Tanah


: Laboratorium Mekanika Tanah Jurusan Teknik Sipil F.T. Universitas Hasanuddin
: 13 OKTOBER 2010
: Firmansyah
:V

Tabel 13.1. KOMPAKSI


Berat tanah
Kadar air mula-mula
Penambahan air
Kadar air akhir

2300
21.12
350
39.55

2300
21.12
300
36.92

2300
21.12
250
34.29

2300
21.12
200
31.65

2300
21.12
150
29.02

gram
gram
gram
cm3

1
1729.2
3365
1635.8
911.062

2
1729.2
3299
1569.8
911.062

3
1729.2
3250
1520.8
911.062

4
1729.2
3230
1500.8
911.062

5
1729.2
3170
1440.8
911.062

gr/cm3

1.7955

1.7230

1.6693

1.6473

1.5815

3A
3B
30.54 22.59
26.35 19.51
4.19 3.08
7.3
7.3
19.05 12.21
21.99 25.23
23.61

4A
4B
22.54 22.3
19.85 19.24
2.69 3.06
7.3
7.3
12.55 11.94
21.43 25.63
23.53

5A
5B
22.03 21.09
19.51 18.38
2.52 2.71
7.3
7.3
12.21 11.08
20.64 24.46
22.55

gram
%
ml
%

Berat Isi Basah (Wet density)


No. Mould
Berat Mould
Berat tanah basah + Mould
Berat tanah basah, Wwet
Volume Mould
Berat Volume Basah
gwet=Wwet/Vmould

Kadar Air (Water Content)


No. Container
Berat tanah basah + Container
Berat tanah kering + Container
Berat air
Berat container
Berat tanah kering
Kadar air
Kadar air rata-rata

gram
gram
gram
gram
gram
%
%

1A
1B
2A
2B
33.25 32.95 32.88 30.35
26.77 25.66 25.5 26.4
6.48 7.29 7.38 3.95
7.3
7.3
7.3
7.3
19.47 18.36 18.2 19.1
33.28 39.71 40.55 20.68
36.49
30.62

Berat Isi Kering ( Dry Density)


Berat tanah basah, Wwet
Kadar air rata-rata
Berat kering
Wwet
Wdry =
W
1

100
Volume Mould
Berat isi kering

g dry

gw = Gs/(1+(w.Gs))

dry

mould

gram
%

1635.8
36.49

1569.8
30.62

1520.8
23.61

1500.8
23.53

1440.8
22.55

gram

1198.44

1201.85

1230.32

1214.92

1175.70

cm3

911.06

911.06

911.06

911.06

911.06

gr/cm3

1.32

1.32

1.35

1.33

1.29

gr/cm3

1.36

1.48

1.65

1.65

1.68

Berat jenis (Gs) = 2.7


Jadi, kadar air optimum dicapai pada saat 28,17 % dan berat isi kering 1,33 gr/cm 3

Gambar 12.1 Grafik Hubungan Kadar Air dengan Berat Isi Kering
1.90

1.80

Berat Isi Kering (gr/cm3)

1.70

1.60

1.50

1.40

gdry= 1,34

y = -0.0003x2 + 0.0169x + 1.0891

1.30

1.20

wopt= 29,13 %
1.10
21

22

23

24

25

26

27

28

29

30

Kadar Air (%)

31

32

33

34

35

36

37

38

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Tabel 13.1

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
16 Mei 2008
Fanny Malawat
V

PEMERIKSAAN CBR LABORATORIUM


(10x Tumbukan)

Kadar Air
No. Container
Berat tanah basah + Container
Berat tanah kering + Container
Berat air
Berat container
Berat tanah kering
Kadar air,w
Kadar air rata-rata

gram
gram
gram
gram
gram
%
%

Berat Isi
A. Berat Mould
gram
B. Berat Tanah Basah + Mould
gram
C. Berat Tanah Basah
gram
D. Volume Mould
cm3
E. Berat Isi Basah, gwet=Wwet/Vmould) gram/cm3
F. Berat Isi Kering,gdry=gwet/(1+w)
gram/cm3

I
58.93 46.23
48.55 43.97
10.38 2.26
5.18
4.77
43.37 39.20
23.93 5.77
14.85

2725
6772
4047
2451.6
1.651
1.437

Penetrasi
Proving ring Calibration 28 KN cap, lbs/Dev = 5,7
Penurunan
Pembacaan Dial Beban
Waktu
(inch)
PER(Div)
(menit)
(lbs)
0.500
16
0.25
91.2
1.000
22
0.5
125.4
1.500
30
1
171
2.000
31
1.5
176.7
2.500
29
2
165.3
3.000
30
3
171
3.500
33
4
188.1
4.000
36
6
205.2
4.500
38
8
216.6
40
5.000
10
228
5.500
45
12
256.5
6.000
46
14
262.2
6.500
43
16
245.1
7.000
18
7.500
20
8.000
22
8.500
24
9.000
26
28
30

Gambar 13.1 Grafik Hubungan Penurunan dengan Beban


300
250

y = 62.601ln(x) + 127.28

Beban (lbs)

200
150
100
50
0
0.000.501.001.502.002.503.003.504.004.505.005.506.006.507.007.508.008.509.009.50
Penurunan (inchi)

Perhitungan CBR
Penurunan,x
(inchi)
0.1
0.2
Nilai CBR rata-rata :

Beban,
y = 156.8 Ln(x) + 755,2
(lbs)
95.099
98.698
2.68

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)

CBR (%)
3.17
2.19

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
16 Mei 2008
Fanny Malawat
V

Tabel 13.2 PEMERIKSAAN CBR LABORATORIUM


(25x Tumbukan)

Kadar Air
No. Container
Berat tanah basah + Container
Berat tanah kering + Container
Berat air
Berat container
Berat tanah kering
Kadar air,w
Kadar air rata-rata

gram
gram
gram
gram
gram
%
%

Berat Isi
A. Berat Mould
gram
B. Berat Tanah Basah + Mould
gram
C. Berat Tanah Basah
gram
D. Volume Mould
cm3
E. Berat Isi Basah, gwet=Wwet/Vmould) gram/cm3
F. Berat Isi Kering,gdry=gwet/(1+w)
gram/cm3

II
76.56 54.96
72.90 52.47
3.66
2.49
8.88
8.80
64.02 43.67
5.72
5.70
5.71

2725
6865
4140
2451.6
1.689
1.597

Penetrasi
Proving ring Calibration 28 KN cap, lbs/Dev = 5,7
Penurunan
Pembacaan Dial Beban
Waktu
(inch)
PER(Div)
(menit)
(lbs)
0.500
19
0.25
108.3
1.000
24
0.5
136.8
1.500
32
1
182.4
2.000
33
1.5
188.1
2.500
35
2
199.5
3.000
34
3
193.8
3.500
37
4
210.9
4.000
39
6
222.3
4.500
41
8
233.7
44
5.000
10
250.8
5.500
46
12
262.2
6.000
49
14
279.3
6.500
51
16
290.7
7.000
47
18
267.9
7.500
20
8.000
22
8.500
24
9.000
26
28
30
32
34

Gambar 13.2 Grafik Hubungan Penurunan dengan Beban


300
y = 66.387ln(x) + 142.75
250
Beban (lbs)

200
150
100
50
0
0.000.501.001.502.002.503.003.504.004.505.005.506.006.507.007.508.008.509.009.50
Penurunan (inchi)

Perhitungan CBR
Penurunan,x
(inchi)
0.1
0.2
Nilai CBR rata-rata :

Beban,
y = 429,1 Ln(x) + 1728
(lbs)
106.750
110.779
3.01

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)

CBR (%)
3.56
2.46

Proyek
Lokasi
Tanggal Percobaan
Nama
Kelompok

:
:
:
:
:

Praktikum Laboratorium Mekanika Tanah


Laboratorium Mekanika Tanah Jurusan Teknik Sipil FT Unhas
16 Mei 2008
Fanny Malawat
V

Tabel 13.3 PEMERIKSAAN CBR LABORATORIUM


(56x Tumbukan)

Kadar Air
No. Container
Berat tanah basah + Container
Berat tanah kering + Container
Berat air
Berat container
Berat tanah kering
Kadar air,w
Kadar air rata-rata

gram
gram
gram
gram
gram
%
%

Berat Isi
A. Berat Mould
gram
B. Berat Tanah Basah + Mould
gram
C. Berat Tanah Basah
gram
D. Volume Mould
cm3
E. Berat Isi Basah, gwet=Wwet/Vmould) gram/cm3
F. Berat Isi Kering,gdry=gwet/(1+w)
gram/cm3

III
80.94 65.20
77.09 62.28
3.85
2.92
8.85
9.72
68.24 52.56
5.64
5.56
5.60

2725
6983
4258
2451.6
1.737
1.645

Penetrasi
Proving ring Calibration 28 KN cap, lbs/Dev = 5,7
Penurunan
Pembacaan Dial Beban
Waktu
(inch)
PER(Div)
(menit)
(lbs)
0.500
22
0.25
125.4
1.000
25
0.5
142.5
1.500
33
1
188.1
2.000
35
1.5
199.5
2.500
38
2
216.6
3.000
40
3
228
3.500
38
4
216.6
4.000
41
6
233.7
4.500
43
8
245.1
46
5.000
10
262.2
5.500
48
12
273.6
6.000
51
14
290.7
6.500
54
16
307.8
7.000
56
18
319.2
7.500
59
20
336.3
8.000
55
22
313.5
8.500
24
9.000
26
28
30
32
34

Gambar 13.3 Grafik Hubungan Penurunan dengan Beban

300

y = 129.71ln(x) + 61.438

250
Beban (lbs)

200
150

100
50
0
0.000.501.001.502.002.503.003.504.004.505.005.506.006.507.007.508.008.509.009.50
Penurunan (inchi)

Perhitungan CBR
Penurunan,x
(inchi)

Beban,
y = 682,6Ln(x) + 3111 (lbs)

CBR (%)

0.1
0.2

178.941
179.037

5.96
3.98

Nilai CBR rata-rata :

4.97

Catatan ;
Untuk penurunan 1 inchi , CBR = Beban / (3x1000)
Untuk penurunan 2 inchi , CBR = Beban / (3x1500)